Search Documents

Sort by

  • TMS
    Pilot Scale Measurements of No Emissions from the Silicon Process

    By Nils Eivind Kamfjord, Halvard Tveit, Ingeborg Solheim

    "Because of its negative environmental effect the attention towards NO emissions increases. This again leads to new demands from the authorities for better surveillance and control of emissions. Earl

    Jan 1, 2012

  • TMS
    Pilot Scale Solar Carbothermic Reduction Of ZnO To Zn

    By C. Wieckert

    Concentrated solar energy can be used as heat source for the production of metals. One of the most promising respective processes, the solar carbothermic production of Zn from ZnO, is investigated wit

    Jan 1, 2006

  • AUSIMM
    Pilot Scale Study of De-silverising and De-bismithising of Lead by Fractional Crystallisation with Reflux

    By Iley J. D, Siviour N. g, Moffatt R. J

    The process of desilverising by fractional crystallisation with reflux was investigated through laboratory batch tests and continuous laboratory bench scale tests at CSIRO Clayton, to a 300 kg/hr p

    Jan 1, 1989

  • SME
    Pilot Scale Testing Of Hyperbaric Filtration For Fine Coal Dewatering

    By J. G. Groppo

    The Andritz Ruthner Inc. hyperbaric filter was evaluated at a pilot scale for dewatering fine coal cleaned by froth flotation. The pilot scale dewatering testing was conducted at a solid feed rate ran

    Jan 1, 1996

  • AUSIMM
    Pilot Studies of the Ravensthorpe Nickel ProjectÆs Pressure Acid Leach Slurry Heater

    By M Miller

    Operators of nickel laterite pressure acid leach and gold pressure oxidation technology frequently employ a series of steam condensing heaters to preheat the leach feed slurry. The heaters are an econ

    Jan 1, 2005

  • SME
    Pilot Study On The Influence Of The Eccentric Speed On Cone Crusher Production And Operation

    By D. Jacobson

    There are many different machine setup parameters and variables that affect the production of cone crushers in a mineral processing plant. One of these variables is the eccentric speed at which the co

    Feb 27, 2013

  • SME
    Pilot study on the influence of the eccentric speed on cone crusher production and operation (edb7524e-49ff-4eb7-a7e1-0da505b43724)

    By D. Jacobson

    There are many different machine design parameters and variables that affect the production of cone crushers in a mineral processing plant. One of these variables is the speed at which the cone gyrate

    Dec 1, 2013

  • SME
    Pilot Testing of a Permeable Reactive Barrier (PRB) to Remediate Sulfate, Metals, and Low pH in Groundwater

    By J. F. Strunk Jr., K. M. Maestas, Y. Chai, R. Legrand, R. L. Henry

    "Groundwater with elevated sulfate and metals was treated using a sulfate-reducing pilot PRB consisting of a series of six 55-gallon drums filled with ZVI (Fe0), wood chips, brewer’s grain, limestone,

    Jan 1, 2016

  • CIM
    Pilot Testing Of A Process Developed For Treatment Of Nicontaining Copper Concentrate After High-Grade Matte Separation Resulting In Blister Copper Production In Twozone Vaniukov Furnace

    By L. B. Tsymbulov, L. Sh. Tsemekhman, A. N. Golov

    Gipronickel Institute, JS is developing a process of continuous converting of Nicontaining copper matte and concentrates resulting in the production of blister copper and fluid NiO-containing slag in

    Jan 1, 2007

  • SME
    Pilot Testing Of Column For Coarse Particles Flotation

    By H. Soto

    As a follow-up to a laboratory study, a pilot scale column for the flotation of coarse particles was designed and then tested in two different applications. In the first test, the concentration of a c

    Jan 1, 1993

  • TMS
    Pilot Trial of Detoxification of Chromium Slag in Cyclone Furnace and Preparation of Glass-Ceramics with the Water-Quenched Melt

    By Lingling Zhang, Daqiang Cang, Guizhou Zhao

    Pilot trial ofthe detoxification ofchromium slag in cyclonefurnace and the preparation of glass-ceramics were investigated in a power plant in China. 10wt.%chromiumslagweremixedwithpulverizedbituminou

    Mar 1, 2018

  • TMS
    Pilot Trial of Direct Modification of Molten Blast Furnace Slag and Production of High Acidity Coefficient Slag Wool Fibers

    By Jun Li, Lingling Zhang, Daqiang Cang, Guizhou Zhao

    Pilot trial of direct modification of molten blast furnace slag and production of high acidity coefficient slag wool fibers were investigated nearby a blast furnace. Molten blast furnace slag discharg

    Mar 1, 2018

  • IOM3
    Pilot-plant bio-oxidation of gold-bearing arsenopyrite concentrates

    By J. R. Budden, P. A. Spencer, J. Barrett

    The initially produced arsenic (III) is very toxic to the unconditioned culture but the mixed culture has the capacity to oxidise it to arsenic (V) in the presence of iron (III). It was possible to bu

    Apr 1, 1991

  • CIM
    Pilot-plant data for the design of primary autogenous and semi-autogenous mills

    By C. A. Rowland

    "Plant owners and operators, plant designers and grinding mill manufacturers are giving much attention to the design and manufacture of autogenous and semi-autogenous grinding mills, particularly the

    Jan 1, 1981

  • CIM
    Pilot-Plant Facilities for Hydraulic Transport of Solids

    By L. G. Smith, C. A. Shook, W. H. W. Husband, W. Schriek

    "The flow of slurries in pipelines is governed by many variables, and the study of the influence of each of these variables is difficult, if not impossible, in some cases. Many correlations are availa

    Jan 1, 1973

  • CIM
    Pilot-Scale and Continuous Bench Testing of the Aims Cn-DTM Cyanide Destruction Process on an Australian Gold Plant Tailings Effluent

    By S. Glen

    Cyanide management practices on modern gold plants are becoming more onerous, due to environmental pressures, particularly for signatories to the International Cyanide Management Code. Operations are

    Jan 1, 2011

  • CIM
    Pilot-Scale Evaluation for the Codelco Continuous Converting Process

    By A. Moyano

    The development of the traditional converting process performed in a PeirceSmith or Hoboken converter is limited by the investment magnitude associated to the fulfillment of the environmental regulati

    Jan 1, 2007

  • CIM
    Pilot-Scale Frother Testing at Highland Valley Copper

    By S. D. D. Welsby

    "A pilot-scale flotation column was used to evaluate four polyglycol frothers at Teck’s Highland Valley Copper Mine. The column was fed with flotation plant feed from the grinding circuit cyclone over

    Jan 1, 2014

  • CIM
    Pilot-Scale Industrial Microwave-IR Sorting of Porphyry Copper Ores

    By C. Dodds, R. S. Ferrari-John, The University of Nottingham, G. Dimitrakis, J. Katrib, A. R. Batchelor

    "Sorting technologies have the potential to reduce energy use in comminution by rejecting uneconomic ore before feed material enters the mill. However, a major challenge for sorting porphyry copper or

    Jan 1, 2016

  • AUSIMM
    Pilot-Scale Kiln Processing of New Zealand Ilmenite

    By Mills R, Shannon W. T, Finch J

    As an extension to investigations into methods of upgrading the Iitania content of ilmenite concentrate from beach sands using 100 g/day, a small pilot plant treating 23 kg/ day of ilmenite was used.I

    Jan 1, 1977