Search Documents

Sort by

  • AIME
    Construction

    By T. A. Rickard

    The writing that is effective is woven with a fine texture into an agreeable pattern; it is free from knots, loose threads, and stray fluff. The instrument that weaves this literary fabric, whether it

    Jan 1, 1931

  • SME
    Construction - Uses Insulation

    By Steven J. Stokowski, Frederick M. Bodycomb

    This chapter deals with the use of industrial minerals in insulating materials used to control our thermal and acoustical environment. There are numerous products on the market used for thermal and ac

    Jan 1, 1994

  • SME
    Construction And Investigation Of A Clay Heap Leach Pad ? Introduction

    By Dirk van Zyl

    Natural materials can be used successfully in the construction of heap leach pads. The use of these materials usually result in the least expensive approach for such facilities. Sufficient geotechnica

    Jan 1, 1983

  • AUSIMM
    Construction and Maintenance of Underground Mine Roads

    By Seedsman R. W

    Good roads are essential in moving men and materials to and from the underground workplace. Coffey Partners International Pty Ltd (Coffey) has recently completed a underground coal industry funded p

    Jan 1, 1995

  • CIM
    Construction and Manufacture of Steel Wire Rope

    By G. C. Hodgson

    Specification and Tests of Rope Wire Chemical Analysis: The range in composition of steel used in the manufacture of wire rope is as follows: Carbon 0 4 to 0.9 per cent Manganese 0 4 to 0.8 Su

    Jan 1, 1931

  • AUSIMM
    Construction and monitoring of development access into highly stressed rock masses

    By R Talebi

    A research project to better understand the rock mass behaviour and the seismic response has been conducted during the design and construction of the 9215 level at the E-Block sector of the Northern S

    Mar 29, 2023

  • SME
    Construction And Operation Of A Series Of Biological Leaching Tests Dumps

    By A. Bruynesteyn

    Many papers 'have been publihed on the role of the bacterium.Thiobacillus ferrooxidans in the oxidation of reduced sulfur compounds, and years of research have established the following environme

    Jan 1, 1972

  • NIOSH
    Construction And Preliminary Evaluation Of A Die El Exhaust Particulate Filter For Underground Use

    By Robert W. Freedman

    In the Bureau of Mines study, a filter with a 20-by 20-inch-square cross section was inserted into the exhaust ducting of a 4-stroke-cycle, 90-hp diesel engine, and the efficiency of removal of total

    Jan 1, 1979

  • DFI
    Construction And Stability Risks Of Fluid Supported Deep Excavations And Their Effects On Design Parameters

    By Martin D. Larisch

    The construction of diaphragm walls and most large-diameter bored piles (piers) is often carried out under drilling support fluids to temporarily stabilise the excavation prior to concrete placement.

    Nov 1, 2022

  • NIOSH
    Construction And Testing Of A Junk Auto Incinerator

    By C. J. Chindgren

    A refractory-lined, garage-type automobile incinerator with a natural gas afterburner for air pollution control was cooperatively constructed and tested by the Bureau of Mines and the Wasatch Metal &

    Jan 1, 1970

  • CIM
    Construction and Utilization of a Field Data Sheet for Consideration of Rock Engineering Problems in Underground Hard Rock Mining.

    By Radford B. Langston

    Mining Methods Majority of Production Ramp and Fill at Stillwater, Sub-level Becoming More Important Production at East Boulder from Sub-level l Majority JM REEF ROCK TYPES NORITE - plagioclase

    May 1, 2002

  • SME
    Construction Challenges of the Anderson Dam Tunnel Project - NAT2022

    By Ron Drake

    The Anderson Dam Tunnel Project is a high-priority, urgent project under construction by the Santa Clara Valley Water District in California. The project will provide a new low-level outlet for the An

    Dec 1, 2022

  • DFI
    Construction Dewatering Challenges in Urban Environments

    By Rafael A. Rivera

    "Since the dawn of construction, there has been a need for excavations, which sometimes need to occur below the groundwater table. Excavations in themselves are difficult enough, with the myriad of re

    Jan 1, 2017

  • SME
    Construction Difficulty Index For Tunnel Construction

    By Sigmund J. Sulinski

    The following is a progress report on a continuing study being made by the Sanitary District for purposes of developing reliable data for predicting costs and progress on future tunnel contracts. All

    Jan 1, 1997

  • SME
    Construction Issues Encountered In The Installation Of Building Foundations As Ground-Source Heat Exchangers

    By W. Zitz

    Incorporation of heat exchangers into drilled shaft foundations is a novel approach to both improve the energy efficiency of building heat pump systems and provide necessary structural support using t

    Jan 1, 2011

  • CIM
    Construction Labour Relations in the Mining Industry

    By W. J. Gibson

    "This paper will provide a general assessment of the differences in construction and industrial labour relations. From this outline will come a detailed examination of labour relations in the construc

    Jan 1, 1972

  • DFI
    Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current Practice

    By Jim Slatter, Ben Collingwood

    "It is well known that the adoption of an appropriate construction methodology is critical to quality outcomes for bored piles (drilled shafts). Many case studies have been published documenting quali

    Jan 1, 1900

  • AUSIMM
    Construction Methods for Remote Locations

    Projects to be undertaken in remote locations require special attention with regard to constructability from the very first stages of design. This is to ensure not only that the project is compat

    Jan 1, 1986

  • AIME
    Construction Methods, Cushman Tunnel No. 2

    By F. E. ROGERS

    CUSHMAN TUNNEL No. 2 is adjacent to the Hood Canal, near potlatch, Wash. It is 17 ft. inside .diameter, about 13,000 ft., or two and one- half, miles in length, and is a part of the second unit of the

    Jan 1, 1931

  • DFI
    Construction of 10’ Diameter Shafts for the Olmsted Approach Walls Project

    By Thomas G. Tavernaro, Jeffrey A. Schaefer

    "The $106 million Olmsted Approach Walls Project, completed in the spring of 2004 by Massman Construction Co., Kansas City, MO, is one phase of a new $1.4 billion Corps of Engineers locks and dam faci

    Jan 1, 2006