Search Documents

Sort by

  • SME
    Design and Construction of Large-Scale Ventilation Caverns on WestConnex’s Rozelle Interchange Project - NAT2022

    By M. Trim, Y. Sun, D. Tepavac, A. Kumar

    Configuration of Rozelle Interchange Project’s ventilation system required design and construction of some of the largest and tallest underground civil caverns attempted in Australia. The paper focuse

    Dec 1, 2022

  • SME
    Design and Construction of Load Transfer System to Replace Existing 39th Street Bridge Piers with New Integral on the Track B/C Approach Structure for the East Side Access Project - RETC2021

    By Julio C. Martinez, Jeffrey L. Rice, Hayden Weschler

    This paper details the extensive underpinning required to hold up the 39th street Bridge while demolishing its massive support piers and building a 30ft deep Cut/ Cover RR tunnel beneath it. The under

    Jun 13, 2021

  • DFI
    Design and Construction of Mixed Ground Working Platform for a CCR Surface Impoundment

    By Juan M. Pestana, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, William Tanner, Daniel J. Woeste

    An access pathway and working platform were designed and constructed for equipment access for a Deep Soil Mixing (DSM) pilot study over a coal combustion residual (CCR) surface impoundment (SI). The D

    Jan 1, 2019

  • CIM
    Design and Construction of Natural Gas Transmission Lines

    By B. W. Snyder

    INTRODUCTORY THE earliest known case of transmission of natural gas by pipe lines was early in the Christian era when the Chinese used bamboo pipes to transport natural gas from surface seepages to h

    Jan 1, 1951

  • DFI
    Design and Construction of Permanent Sheet and Pipe Pile Basement Walls with the Press-in Piling Method

    By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano

    Using sheet piles and pipe piles for permanent earth retaining is one of the most economical methods for constructing basement walls since they can also work as temporary shoring during construction.

    Jan 1, 2019

  • DFI
    Design and Construction of Pile-Supported Mechanicallystabilized-Earth Slope Stabilization

    By Nasr Sheta

    "After Hurricane Sandy, the stability of an earth slope in the Atlantic Highlands, New Jersey in the United States was deteriorating due to slumping soils and erosion from flooding. A slope stability

    Jan 1, 1900

  • SME
    Design and Construction of REM Tunnels and Underground Structures - RETC2023

    By Verya Nasri, Agustin Rey

    Once completed, the Montreal Réseau Express Métropolitain (REM) will be the fourth largest automated transportation system in the world. The REM represents construction costs of approximately 7.0 bill

    Jun 13, 2023

  • AUSIMM
    Design and Construction of Sydney’s South West Rail Link Hume Highway Underpass

    By B Chapman, R Nievergelt, J Hill

    A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume

    Sep 17, 2014

  • CIM
    Design and Construction of Tailings Dams (ENVIRONMENTAL CONTROL )

    By Earle J. Klohn

    "The design, construction and operation of tailings dams is rapidly becoming a major consideration for most new mining developments, as well as for many existing operations. In North America, under pr

    Jan 1, 1972

  • CIM
    Design and Construction of Tailings Ponds and Reclamation Facilities - Case Histories (ClM Bulletin, October 1978)

    By J. D. Jones

    The geographic occurrence of economic mineral deposits presents a variety of problems in modern tailings disposal operations. This paper presents case histories in several sectors of the mineral indus

    Jan 1, 1978

  • SME
    Design and Construction of the 42nd Ave S Storage and Treatment Tunnel for the Henderson/ML King CSO Project

    By J. Chae, D. Pecha, R. Andrews

    The Henderson/ML King CSO Project is a major combined sewer overflow (CSO)reduction project for the Department of Natural Resources and Parks of King County, Washington. The central element of the pro

    Jan 1, 2005

  • AUSIMM
    Design and Construction of the Access Tunnels for the New Top Ryde City Shopping Centre, Northern Sydney

    By Q Yang

    This paper describes the design and construction of three 7.2 m span access ramp-tunnels to the three level underground car park of the newly redeveloped Top Ryde City Shopping Centre in northern Sydn

    Mar 8, 2011

  • DFI
    Design And Construction Of The Deep Stations For The Copenhagen Metro - Synopsis

    By David R. Beadman

    This paper discusses how modern techniques of design and construction were used to create the deep stations for the Copenhagen Metro. The deep stations are located in small squares within the city adj

    Jan 1, 2000

  • DFI
    Design and Construction of the Deepest Base Grouted Bored Piles at Moorehouse in London

    By Adam Pickles, Duncan Nicholson, Richard E. Prust, Hoe C. Yeow

    "Moorhouse is founded on what at the time of construction were the deepest base grouted piles ever installed in London, specifically designed to accommodate settlement from the proposed development of

    Jan 1, 2005

  • SME
    Design and Construction of the Fields Point Tunnel Pump Station for the Narragansett Bay Commission CSO Abatement Program, Providence, Rhode Island ? Introduction

    By Geoffrey Hughes

    The Narragansett Bay Commission (NBC) is a regional sewer authority that serves ten communities in the Providence, Rhode Island metropolitan area. From 1992 to 1999, the NBC developed a comprehensive

    Jan 1, 2008

  • SME
    Design and Construction of the NBAQ4 Project— First Urban EPB TBM Tunnel in Metro Manila - RETC2023

    By Abegail Endraca, Allan Sebastian, Andrew Raine, Allan Patdu

    The project involves the construction of a new aqueduct tunnel by an Earth Pressure Balance TBM tunnel for the Novaliches-Balara Aqueduct No 4 (NBAQ4) project in Metro Manila. It comprises a 7.3 km lo

    Jun 13, 2023

  • SME
    Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021

    By David Mast, Amanda Foote, Mina Shinouda

    The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5

    Jun 13, 2021

  • TMS
    Design And Construction Of The Noranda Converter At The Borne Smelter

    By Michel Boisvert

    Noranda Metallurgy is presently completing construction of the new Noranda Converter (NCV) at its Home Smelter in Rouyn-Noranda. This capital investment of CDN$56M is the continuation of the Emissions

    Jan 1, 1998

  • SME
    Design and Construction of the Shoal Creek Raw Water Intake at Lake Lanier

    By D. Rendini, R. D. Gutridge

    INTRODUCTION Gwinnett County, Georgia, is a part of the rapidly expanding metropolitan Atlanta Georgia area. Located approximately 48 km (30 miles) northeast of Atlanta, Gwinnett County has a curr

    Jan 1, 2005

  • SME
    Design And Construction Of Wyoming's First Major Sediment Control Reservoir Using Settleable Solids Effluent Criteria

    By P. Kim Carroll, D. Nick Tiffany, Doyl M. Fritz

    Thunder Basin Coal Company received the 1987 Wyoming Excellence in Surface Mining Award for construction of the State's first major sediment control reservoir to be designed using the new settlea

    Jan 1, 1989