Search Documents

Sort by

  • SME
    Design Overview of Technogrid Conveyance Arresting System and Mounting Details in the Hermosa Headframe - SME Annual Meeting 2026

    By C. H. Stephenson, Z. White

    This paper presents the design approach case study for incorporating a Technogrid® conveyance End-of-wind arresting system within the new South32 Hermosa headframe. Focus is placed on energy absorptio

    Feb 22, 2026

  • SME
    Design Problems Associated With Port Handling Facilities

    By Ian S. Ross

    The emphasis in this paper is focussed on dry bulk car go or the same cargo converted to slurry form for ease of handling. It is this type of cargo which is of primary interest to the mining industry

    Jan 1, 1972

  • AUSIMM
    Design Procedure and Results from a Field Test of Soil Freezing as Stabilisation of Bottom Slice Fill

    By P Andersson, P Marklund

    Evaluation of different techniques for bottom fill stabilisation showed that frozen fill was the most economical method. In order to test the method a full-scale field test was performed in the Rehnst

    Jan 1, 1998

  • SAIMM
    Design Procedure For Hydraulic Backfill Distribution Systems

    A wide range of materials are used in hydraulic backfilling operations and the pipeline flow behaviour of these mixtures varies considerably. It is shown that despite the large differences in constitu

    Jan 1, 2001

  • NIOSH
    Design Procedure Optimizes Roof Truss Installations In Bedded Roof - Objective

    Provide mine personnel with a convenient means of determining the optimum installation geometry of roof trusses in bedded roof. Background Mine operators frequently ask the following questions

    Jan 1, 1989

  • ISEE
    Design Software for Electronic Detonators

    By Kia Riihioja, Mike Higgins

    A major difference between electronic and pyrotechnic detonators is that, in almost all but the simplest of blast layouts, computer software is required to plan a blast using electronic detonators. Wh

    Jan 1, 2004

  • DFI
    Design Solutions for Seepage End-Around-Effects at Cutoff Wall Depth Transitions

    By Michael Hughes, Selva Selvamohan, Ray Costa

    "Cutoff walls are commonly used to mitigate underseepage problems for levee remediation projects. At abrupt changes in seepage cutoff wall depths there is a potential for water to flow around the back

    Jan 1, 2015

  • CIM
    Design Specifics of Hard-Rock Caverns for Hydrocarbon Storage; 50 Years of Feedback and Recent Developments

    By Nicolas Gatelier, Sophie Laurent, Thierry You

    Hard-rock caverns for hydrocarbon storage are a very particular type of underground facility controlled not only by local administrative and regulatory constraints that can be very specific, but also

    Jan 1, 2015

  • DFI
    Design Strategy For Deep Slurry Stabilized Bored Piles In Compression

    By Chu E. Ho

    Field load tests on deep slurry stabilized bored piles have shown that end bearing resistance was unreliable due to soft toe conditions caused by debris accumulation at the bottom of the hole during p

    Jan 1, 2002

  • SME
    Design Tools To Control Transients In Solvent Extraction Plants

    The design of solvent extraction plants has been generally based on the assumption of steady operating conditions in both the settler and the mixer units. However, recent experience in both large and

    Jan 1, 2003

  • SME
    Design Tools To Control Transients In Solvent Extraction Plants (SME Annual Meeting Feb. 26-28, Denver, Colorado)

    By G. Miller

    The design of solvent extraction plants has been generally based on the assumption of steady operating conditions in both the settler and the mixers. Recent experience with both large and small plant

    Jan 1, 2001

  • CIM
    Design, Commissioning, Start-Up and Performance of Vale’s Long Harbour Stirred Media Detritor Ultrafine Grinding Circuit

    By Adam Moore, Ryan Gillespie, Jarrett Quinn, Audrey Walters, Peter Radziszewski

    "Vale Long Harbour Processing Plant (LHPP) was designed to process Voisey’s Bay nickel concentrate into finished nickel and associated copper and cobalt products. The plant includes a secondary grindi

    Jan 1, 2016

  • DFI
    Design, Construction and Design Validation through High Strength Testing (PDA) of CFA and DD Foundations

    By Stefano Pirrello

    "Sydney’s booming real estate market has pushed property developers to invest in historically “no-go” areas, which were previously too expensive to develop. These areas are usually near rivers where t

    Jan 1, 1900

  • CIM
    Design, Construction and Initial Operation of the Tailings System at Brenda Mines Ltd.

    By H. Tetu, F. Pells

    "The copper-molybdenum property of Brenda Mines Limited is located in the Okanagan district of British Columbia, approximately 25 miles west of Kelowna. The Okanagan Valley is a resort and fruit-growi

    Jan 1, 1971

  • AUSIMM
    Design, Construction and Performance of a Passive Treatment System for the Reduction of Acidity and Dissolved Metals in Acid Sulfate Soil Waterways

    By M D. Melville, B C. T Macdonald, T D. W

    The surface waters in regions with acid sulfate soils (ASS) can contain high concentrations of acidity and dissolved metals. These soils cause problems for agriculture, construction and development. T

    Jan 1, 2003

  • DFI
    Design, Construction And Verification Of Temporary Working Platforms – Australian And New Zealand Good Industry Practice

    By Martin D. Larisch, Ronald Damen

    The design and construction of temporary working platforms for cranes and piling rigs is a high-risk activity. It requires the careful selection of the appropriate input parameters to obtain the corre

    May 1, 2022

  • DFI
    Design, Construction Challenges and Quality Control of a Deep Soil Mixing System for Waterfront Slope Stabilization

    By Yan Lap J. Kan

    "A waterfront stabilization system consisting of Deep Soil Mixing (DSM) columns, vinyl sheet pile fascia, and concrete flood walls supported on shallow footings was designed and constructed for a high

    Jan 1, 2016

  • CIM
    Design, Construction, and Commissioning of Air Separation Units in Remote Locations

    By K. van Warmerdam, M. Pearson, C. Kember, D. McMullen, M. Thayer, C. Ugarenko

    In July 2012, Hatch Ltd. and Air Products & Chemicals Inc. completed construction and commissioning of a 4000 tpd O2 cryogenic air separation unit (ASU) for Barrick Gold’s Pueblo Viejo Project located

    Jan 1, 2014

  • DFI
    Design, Construction, and Long-Term Monitoring of a Pile-Supported LNG Tank in Savannah, Georgia

    By Cheng Lin, Guoming Lin

    "This paper presents a case history for the design, construction and long-term performance monitoring of a driven prestressed concrete (PSC) piled foundation supporting a large liquefied natural gas (

    Jan 1, 1900

  • TMS
    Design, Construction, and Operation of Periodic Reverse Current Process at Tamano

    By Tatsuzo Kitamura

    The tank house of Tamano refinery, that started its operation in January, 1972, was constructed incorporating the application of Periodic Reverse Current (P.R.C.) from the outset of design works. In 1