Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Opttimisation of development layyouts for retreat longwall mining with particular reference to the Australian coal minesBy R D. Lama, A Misra
One of the major factors restricting an increase in the productivity of a longwall mine is lower productivity obtained in a development panel. There has been a significant improvement in gate road dev
Jan 9, 1996
-
Opérations Minières et Concentration du Minerai du Lac Fire de Sidbec-NorminesBy Marcel Allard
On January 1st, 1977, SIDBEC-NORMINES INC. purchased from Quebec Cartier Mining Company various facilities located at Gagnon and Lac Jeannine together with the Fire Lake deposit. A t the same time, SI
Jan 1, 1979
-
Or In New Mine Planning - IntroductionBy J. J. Lewis
In the mid-1970's a major new prospect was proved in a previously unworked region of North East Leicester- shire, United Kingdom. Preliminary estimates from borehole information showed over 500 m
Jan 1, 1979
-
Ora Banda Mass Blast - July 1994By Lovitt M
Ora Banda Gold Mine is located in the Eastern Goldfields of Western Australia. Mining is carried out underground by sublevel open sloping resulting in large open stopes. A Mass Blast of approximatel
Jan 1, 1995
-
Orange Footwall ?Sill? Nickel Plate MineBy Evans B. Mayo
ABSTRACT Orange Footwall 'sill' is locally concordant locally discordant, with the structure of its sedimentary walls. The sediments were folded in two directions. Folds, following both thes
Jan 1, 1951
-
Orange Free State BranchOrange Free State Branch Minutes of a Committee Meeting held in the Boardroom of Western Holdings on Thursday, IIth October, 1973, at 5.00 p.m. Present Messrs E. T. Wilson (in the Chair), E. Dunstan,
Jan 2, 1974
-
Orange Free State Branch (0505b6ff-a8d6-4270-901d-a9a233af98cf)Orange Free State Branch Minutes of a General Meeting held at the Welkom Mine Canteen on Wednesday, 21st November, 1973, at 4-.00 p.m. Present Mr E. T. Wilson (Chairman) in the Chair, 15 Fellows and M
Jan 6, 1974
-
Orange Free State Branch Annual General MeetingThe annual general meeting of the Branch was held at the St. Helena Club on Thursday, August 21, 1969. Mr J. G. Kirchner (Chairman) was in the Chair. Also present were Mr R. C. J. Goode, Preside
-
Orange Free State Branch June General MeetingThe June General Meeting of the Branch was held in the St. Helena Club on Wednesday, 18th June, 1969. Mr J. G. Kirchner (Chairman of the O.F.S. Branch) was in the chair. There were also present:
-
Orange Free State Branch Minutes of the Committee Meeting Held in the Welkom Club on Wednesday, 8th November, 1972ORANGE FREE STATE BRANCH MINUTES OF THE COMMITTEE MEETING HELD IN THE WELKOM CLUB ON WEDNESDAY, 8th NOVEMBER, 1972 Present: C. J. Isaac (in the Chair), E. T. Wilson, J. M. Meyer, C. Mostert, P. L. Nat
-
Orange Free State Branch November General MeetingThe November General Meeting of the Branch was held in the St. Helena Club at 8.00 p.m. on the 17th November, 1970. Mr J. N. Saunders (Chairman) was in the chair. There were also present six fel
-
Orange Free State Branch Proceedings of the Annual General MeetingThe annual General Meeting of the Branch was held in the St. Helena Club on Wednesday, 4th August, 1971 at 8.00 p.m. Mr N. A. Honnet (Immediate Past Chairman) was in the chair. There were also p
-
Orange Free State Branch Proceedings of the Annual General Meeting (80187c07-b017-460a-87f8-f243f96c2386)ORANGE FREE STATE BRANCH Proceedings of the Annual General Meeting The Annual General Meeting of the Branch was held in the St. Helena Club on Tuesday, 3rd October, 1972 at 8.00 p.m. Mr J. M. Meyer wa
-
Orange Free State Branch Proceedings of the February General MeetingThe February General Meeting of the Branch was held at the St. Helena Club on Wednesday, 19th February, 1969. Present were: Twelve members: Mr J. G. Kirchner (Chairman of the O.F.S. Branch), Messrs
-
Orano Mining R&d And Innovation Portfolio And Deployment MethodologyBy Hervé Toubon, Matthieu Davrinche, Jim Corman, Mamane Bello Boubacar Kinassa, Pierre Amadieu
Orano Mining maintains a significant level of Innovation and Development Research for its sites in Canada, Niger, Kazakhstan, Mongolia, and France. This effort is formalized within the six major thema
Jan 1, 2020
-
Orapa 3 Plant Conceptual Design Evolution In Action (Let The Ore Dictate The Plant That You Build!!)By G. Popplewel
Commencing with the Pre-Feasibility Study (PFS) conclusions, the Orapa 3 process design evolved through a phase of value-engineering studies. An overall re-evaluation of the originally proposed proces
Jan 1, 2010
-
Order Of BusinessPRESIDENT WHITESIDE: If the chair may be pardoned, he would like to say he knows something of the work of this committee, and I assure you that they have all worked faithfully and hard, holding meetin
Jan 1, 1923
-
Ordered Rock Mass Properties - I. Introduction - A. ScopeBy Lawrence Adler
The properties of a geologic mass may be considered from a resource or an engineering viewpoint. The primary engineering applications include ground control, excavation, bulk handling, and hydrology.
Jan 1, 1973
-
Orderly Marketing of MineralsBy AIME AIME
TUESDAY afternoon the annual meeting was devoted to a general session, in the auditorium, on production control. George Otis Smith presided and in opening the meeting recalled that the session in 1920
Jan 1, 1929
-
Orderly Production Brings Prosperity to East Texas FieldBy George C. Gibbons
ALMOST everyone in any of the five counties embracing the great East Texas field depends heavily upon oil for his living whether or not he actually owns a well or piece of royalty himself. Oil is a na
Jan 1, 1941