Search Documents

Sort by

  • AUSIMM
    Pre-concentration – more than bulk ore sorting

    By P Holtham, K Duffy, L Pyle, W Valery

    The mining industry is becoming increasingly focused on pre-concentration due to its potential economic and environmental benefits, particularly for the more complex, low-grade, high throughput operat

    Aug 24, 2022

  • SME-ICGCM
    Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring

    By Peter (Yunqing) Zhang

    Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution

    Jan 1, 2006

  • SME
    Pre-Emptive Land Use--Its Impact On The Mineral Base

    By W. L. Dare

    Land use planning is not a new concept in the United States but the emphasis has changed drastically since the early 1960's. Under the old interpretation we tried to expand our frontiers and deve

    Jan 1, 1974

  • DFI
    Pre-engineered Hydraulic Bracing Systems

    By Braxton P. Erbe, Douglas C. Brunot

    A variety of systems and techniques exist to support deep excavations where sloping is not feasible. This paper will explore an example project involving the use of pre-engineered hydraulic bracing sy

  • SME
    Pre-Excavation and Early Work Activities for the Long Baseline Neutrino Facility Far Site - RETC2021

    By Josh Willhite, Seth Pollak, Ben Seling

    The Long Baseline Neutrino Facility Far Site at the Sanford Underground Research Facility in Lead, South Dakota will house four large detector tanks located in deep underground caverns. Construction o

    Jun 13, 2021

  • SME
    Pre-Excavation Grouting at the Hemphill site — Atlanta WSP Tunnel

    By Konner Horton, Adam L. Bedell, Don Del Nero, Brian Jones

    "The City of Atlanta’s Water Supply Program Tunnel project includes a 7,315-m (24,000-ft) long, 4-m (13-ft) diameter, hard rock tunnel. A complex aspect of the project involves connecting five, blind

    Jan 9, 2018

  • SME
    Pre-Excavation Grouting Through Water Bearing Zone Under High Pressure Under Extreme Flow Conditions

    By Adam Shang Robert Fu

    The Yung-Chung-Tunnel in Taiwan, constructed for the Taiwan-East Railway Bureau, collapsed during construction when a water bearing, fractured marble zone was intersected. The inflow was approximately

    Jan 1, 2007

  • SME
    Pre-Failure Pillar Yielding

    By J. F. T. Agapito, R. R. Goodrich

    Yield pillars have been used for many years to help reduce stresses near mine openings and improve roof and floor stability. A yield pillar is often defined as a pillar that fails but retains residual

    Jan 1, 2001

  • ABM
    Pre-finishing Mill Modernization On The Sterling Steel Rod Mill

    By Kermit Reins

    The most recent modernization phase of the wire rod mill at Sterling Steel involved installation of a pre-finishing mill, using a Morgan Vee Mini-Block, a new water box and shear with utility systems

    Aug 17, 2017

  • SME
    Pre-Implementation Evaluation of VR as a Mine Safety Training Tool - SME Annual Meeting 2025

    By CASSANDRA L. HOEBBEL, Jennica L. Bellanca

    High-fidelity, immersive training is known for its learning and logistical benefits. While other industries have used virtual reality (VR) for decades, the same uptake has not been seen in mining. NIO

    Feb 1, 2025

  • SME
    Pre-Mining Bed Sediment Geochemical Baseline in the Animas River Watershed, Southwestern Colorado

    By Robert Blair, David L. Fey, Stanley E. Church

    Determination of the pre-mining geochemical baseline in bed sediments in watersheds impacted by historical mining activity is important in establishing watershed restoration goals. We have developed m

    Jan 1, 2000

  • SME
    Pre-Mining Planning For Environmental Control In Surface Coal Mines

    By R. V. Ramani

    Minerals, together with agricultural and forestry products, are the primary source of wealth produced in the United States. Although the production of minerals requires only a small fraction of the st

    Jan 1, 1977

  • AUSIMM
    Pre-Ore Reserve Reporting

    Arising from prospecting success, the underlying worth of the shares of a publicly listed mining exploration company can increase many-fold. Prompt and accurate reporting during the exploration st

    Jan 1, 1979

  • TMS
    Pre-Oxidation And Hydrogen Reduction Of Panzhihua Ilmenite Concentrate

    By Chonghe Li, Xionggang Lu, Wei Xiao, Xingli Zou, Weizhong Ding

    The reduction degree and rate of the initial ilmenite concentrate and pre-oxidation samples by hydrogen were investigated by using thermogravimetric analysis system. H2-TPR was used to detected reduct

    Jan 1, 2014

  • SME
    Pre-Planning Of Underground Mines For Conversion To Other Industrial Uses

    By Carl R. Christiansen

    Underground sites have great potential for industrial plants, for warehouses, and for other purposes where above-surface locations are now employed. Subsurface locations have generally been over- look

    Jan 1, 1973

  • DFI
  • DFI
  • DFI
  • DFI
  • SAIMM
    Pre-processing and characterization of PCBs to unlock opportunities for local end processing in developing economies. T. Moyo and J. Petersen

    By J. Petersen, T. Moyo

    Waste Printed Circuit Boards (PCBs) are a metals-rich fraction of electronic waste (e-waste) streams, and globally it has been demonstrated that they can be recycled gainfully to recover the metals. R

    Jan 1, 2020