Search Documents

Sort by

  • SME
    Risk Mitigation for Open Pit Mining in Areas With Underlying Old Underground Workings

    By J. Duran

    Mining at Phoenix is currently done by surface operation in the Fortitude and Bonanza Pits, at a combined rate of approximately 110,000 tons per day. A portion of the ore bodies targeted by these pit

    Feb 23, 2014

  • SME
    Risk Mitigation For Openpit Mining in Areas With Old Underground Workings`

    By J. Duran

    Mining at Newmont Mining?s Phoenix?s Mine is currently done by surface operation in the Fortitude and Bonanza pits at a combined rate of approximately 100 kt/d (110,000 stpd). A portion of the o

  • SME
    Risk Mitigation for the Big Walnut Sewer Tunnel Construction in Columbus, Ohio - NAT2024

    By Rob Herr, Irwan Halim, Heather Marsh

    This project will expand sanitary sewer within the City of Columbus. It consists of 2.5 mile long, 72-inch finished diameter pipe grouted inside 10.8-foot diameter tunnel excavation in shale. This pap

    Jun 23, 2024

  • SME
    Risk Mitigation In Global Mining Development

    By Wayne W. Murdy

    Since 1993, Newmont Mining has been growing through the development 'q of three major foreign mining operations with a fourth under construction. The first project, Yanacocha in Peru, began ope

    Jan 1, 1997

  • SME
    Risk Mitigation In Global Mining Development Newmont Mining Corporation

    By Wayne W. Murdy

    Since 1993, Newmont has been actively growing through the development of three major foreign mining operations with a fourth under construction. The first project, Yanacocha in Peru began operating in

    Jan 1, 1997

  • SME
    Risk Mitigation of Natural Gas in Louisville MSD’s Deep Bedrock, Ohio River Tunnel - RETC2023

    By Jacob L. Mathis, Todd Tharpe, Jonathan Steflik, R. M. True

    In June 2022, Louisville MSD completed a 6.5 km (4-mile), 6.1 m (20-foot) finisheddiameter CSO conveyance and storage tunnel system located along the Ohio River in downtown Louisville, Kentucky. Durin

    Jun 13, 2023

  • SME
    Risk Modelling Techniques for Complex Tunnelling Projects from Deterministic to Probabilistic Methods: Have We Done Enough? - NAT2022

    By P. Sander, M. Spiegl, J. Reilly, A. Van Droogenbroeck

    Although the outdated idea of calculating risk as the deterministic product of its likelihood and impact is not entirely a thing of the past, a multitude of organizations have adopted the usage of pro

    Dec 1, 2022

  • SME
    Risk Reduction and Performance Improvement through TBM Robotization

    By Salam Moubarak, Thomas Camus

    "INTRODUCTION Since the introduction, several decades ago, of the first concepts of tunnel boring machines (TBMs), the unremitting increase of mechanized and automated tasks and the reduction of manua

    Jan 1, 2016

  • SME
    Risk Related to PPP Tunneling Projects for Design Professionals

    By David J. Hatem

    Tunnels and underground projects are inherently more risky than vertical projects, which typically utilize more conventional design and construction approaches and are undertaken in the context of rel

  • CIM
    Risk Weighted Cash Flow, a Communication Tool for Engineers and Financial Professionals on New Technology Projects

    By Mark Kennedy, Allan MacRae, Cameron Hams

    New technology projects, particularly those involving first-of-a-kind metallurgical facilities, have a poor track record of achieving their overall financial targets, as they incorporate technological

    Jan 1, 2011

  • AUSIMM
    Risk-based approach for minimising tailings dam failures

    By M Barker, H Li

    The total number of tailings accidents has reduced from over 50/decade in the 1960s-1980s to less than 30/decade in the 2000s to 2010s. However, the rate of significant tailings dam failures has not

    Jul 23, 2018

  • SME
    Risk-Based Design Study and Innovative Ventilation Strategy for a High-Gradient Short Tunnel - RETC2023

    By Reinhard Gertl, Maximilian Weithaler, Harald Kammerer, Juan Pablo Muñoz, Juan-Carlos Rueda

    The Guillermo Gaviria Echeverri tunnel and its access roads project in Antioquia, Colombia is a mega infrastructure project that includes a road network with the longest tunnel in Latin America and se

    Jun 13, 2023

  • ISEE
    Risk-based Explosives Safety Assessment In Switzerland And Europe

    By Andreas Bienz

    The safety of persons from accidental explosions and fires during manufacture, storage, transport etc. of explosives, pyrotechnics, propellants, firework and ammunition is most commonly assessed accor

    Jan 1, 2007

  • AUSIMM
    Risk-Based Ore Selection from Conditionally Simulated Block Models

    By J E. Everett, F Grobler

    This study considers realistic data for a planned open pit iron ore mine, but is applicable to any open pit situation. By interpolating drill hole data, grades are generated for a rectangular block mo

    Aug 12, 2013

  • AUSIMM
    Risk-based Rehabilitation Strategies for Post-mined Land in Fiji

    By J J. Robinson, B N. Noller, D M. Franks, G McIlveen, D R. Mulligan, A T. Soro

    Fiji is a developing nation that relies on economic opportunities and recently experienced increased interest in mining and mineral exploration that could potentially benefit the country. In order to

    Jul 16, 2014

  • SAIMM
    Risk-based slope design: Insights from the Thabazimbi failure

    By T. Dlokweni, M. Bester, C. Koegelenberg, I. Basson

    Certain degrees of safety, economic, and financial risk are implicit in any mining operation. At Thabazimbi Mine, slope stability was one of the major sources of risk, largely due to data uncertaintie

    Sep 1, 2025

  • SME
    Risk-Based Ventilation Design for a Long Bidirectional Road Tunnel - NAT2024

    By Reinhard Gertl, Soroush Dabiri, Juan-Carlos de Rueda

    The Tunnel of Guillermo Gaviria Echeverri, spanning 6.05 miles, will be Latin America’s longest road tunnel, is currently under construction in Colombia’s Antioquia Department with a single bidirectio

    Jun 23, 2024

  • AUSIMM
    Risk-Cost-Benefit Analysis of Early Warning Technologies Impact for Wall Failure Risk Management in Surface Mines

    By J Joy, A Bye, G V. Kizil

    This paper presents an application of the newly developed risk-cost-benefit (RCB) framework to support risk management decisions for the selection of wall monitoring technologies at an open cut mine s

    Sep 18, 2012

  • AUSIMM
    RISKGATE and Underground Operations

    By J Harris, J Li, M Shi, P A. Kirsch, D Sprott

    Australia has an enviable global reputation as a leader in health and safety outcomes in the hazardous industry of mining, in part due to an increased application of risk management regarding operatio

    Mar 24, 2014

  • AUSIMM
    RISKGATE – Shared Coal Mining Knowledge for Managing Risks across Ground Management

    By P Bergin, J M. Galvin, J Harris, J Li, P Kirsch, M Shi, B Hebblewhite, B Whittaker, R Mitra, D Sprott

    Controlling unwanted ground movement is critical in mining as well as many other highly hazardous environments, such as construction and tunnelling. Sharing knowledge about effective hazard management

    Nov 5, 2014