Design, Construction Challenges and Quality Control of a Deep Soil Mixing System for Waterfront Slope StabilizationBy Yan Lap J. Kan
"A waterfront stabilization system consisting of Deep Soil Mixing (DSM) columns, vinyl sheet pile fascia, and concrete flood walls supported on shallow footings was designed and constructed for a high
Jan 1, 2016
-
Design, Construction, and Commissioning of Air Separation Units in Remote LocationsBy K. van Warmerdam, M. Pearson, C. Kember, D. McMullen, M. Thayer, C. Ugarenko
In July 2012, Hatch Ltd. and Air Products & Chemicals Inc. completed construction and commissioning of a 4000 tpd O2 cryogenic air separation unit (ASU) for Barrick Gold’s Pueblo Viejo Project located
Jan 1, 2014
-
Design, Construction, and Long-Term Monitoring of a Pile-Supported LNG Tank in Savannah, GeorgiaBy Cheng Lin, Guoming Lin
"This paper presents a case history for the design, construction and long-term performance monitoring of a driven prestressed concrete (PSC) piled foundation supporting a large liquefied natural gas (
Jan 1, 1900
-
Design, Construction, and Operation of Periodic Reverse Current Process at TamanoBy Tatsuzo Kitamura
The tank house of Tamano refinery, that started its operation in January, 1972, was constructed incorporating the application of Periodic Reverse Current (P.R.C.) from the outset of design works. In 1
Jan 1, 1976
-
Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 WaltonBy Joel B. Dellaria, Justin R. Lewis
"No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca
Jan 1, 2017
-
Design, Construction, Commissioning And Operating Of the Elura ConcentratorBy Morrison R. D
This paper describes major events in the design, construction, camtissioning and operation of the Elura concentrator. It covers the period fran September, 1974 when laboratory testwork on drill co
Jan 1, 1983
-
Design, implementation and field performance of a face destress blasting method for mine developmentBy E Villaescusa, C Drover, I Onederra
Development face destress blasting is a construction technique in deep mining, which aims to prevent, reduce the frequency, or manipulate the timing of violent, stress-driven rock mass instability at
Nov 29, 2022
-
Design, Installation And Operation Of The Pinto Valley Moly Flotation ColumnsBy R. Rodgers
The Pinto Valley Concentrator of BHP Copper Inc. restarted its sulphide mining operations in September 2007 to produce copper and moly concentrates. During the plant production ramp up, the copper/mol
Jan 1, 2010
-
Design, Installation And Performance Of Earth Retention System To Limit Ground Movements Around Sensitive Structures In Washington, DcBy Douglas R. Hardin, Stanley L. Worst, Joanna Mason
A challenging earth retention project presented itself in Washington, DC in the backyard of the historic House of the Temple (The Scottish Rite of Freemasonry, Supreme Council 33°). Located at 15th St
Oct 1, 2022
-
Design, Installation, and Testing of Hollow Bar Tiebacks Used as Excavation SupportBy Marco D. Boscardin, Kenneth A. Pidgeon, Adriane G. Boscardin
"Hollow bar tiebacks can offer an economical alternative to conventional solid bar and strand tieback systems for use in temporary excavation support construction. However, the limitations associated
Jan 1, 2016
-
Design, Materials Combinations and RecyclingBy Remmerswaal, U. Boin, M. B. G. Castro
"To design sustainable products that can be recycled with high resource efficiency, low environmental impact and economic feasibility, the choice of materials and materials combinations, made in the d
Jan 1, 2003
-
Design, Operation And Control Of A Teeter-Bed Hydroseparator For Classification (August 2010 • Vol. 27 No. 3)By J.N. Kohmuench
Teeter-bed (i.e., hindered-bed) separators are used throughout the mineral processing industry for both classification and density separation. The high capacity and sizing characteristics of these uni
Jan 1, 2010
-
Design, Operation, And Control Of A Teeter-Bed Hydroseparator For ClassificationTeeter-bed (i.e., hindered-bed) separators are used throughout the mineral processing industry for both classification and density separation. The high capacity and sizing characteristics of these uni
Jan 1, 2010
-
Design, Optimization and Transfer of a Process for Biodissolution of Precious Metals from Used Electronic EquipmentBy C. Stollberg
The recovery of valuable materials from electronic waste is of growing importance for the re-source management not only in the industrialized nations. Being a significant step in an innovative automat
Jan 1, 2014
-
Design, Simulation and Operation Column FlotationBy J. B. Rubinstein
"The paper gives an overview of the history of flotation machine development. The laws of their evolution are stated and the place and role of column flotation are demonstrated.The major parameters of
Jan 1, 2003
-
Design-Bid-Build Contracting: Climbing Out of a Paradigm SinkholeBy Randall J. Essex
Public and private owners of infrastructure projects face a number of real and perceived constraints when considering design-bid-build (DBB) procurement for underground projects. Thus, they may not be
Jan 1, 2003
-
Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline
Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump
Jun 13, 2023
-
Design-Build Synergy To Deliver Pile FoundationsBy David P. Sauls
Design-build contract delivery provides unique opportunities for efficiencies in pile foundation design and installation. The Louisiana Department of Transportation and Development (LADOTD) US Highwa
-
Design-By-Analysis of Water-Cooled Gas Handling DuctsBy T. Plikas, T. Porretta, M. Al-Dojayli, B. Pretorius, J. Woloshyn, H. Ghorbani
"Water-cooled ducts represent an integral part of high temperature off-gas systems in metallurgical processes. Typically, off-gas enters these ducts at significantly elevated temperatures; therefore,
Jan 1, 2017
-
Design. Aspects of Ground Consolidation by the Freezing Method for Shaft Sinking in SaskatchewanBy Witold J. S. Ostrowski
Stabilization of water-bearing sediments by the freezing method for shaft sinking has been used for over 80 years on the European Continent. The real application of this method in Canada started with