Search Documents

Sort by

  • SME
    Developing an Integrated Flowsheet for Treating a Diversified Copper Ore Deposit

    By J. C. Gathje

    The Robinson copper ores were mined for many years from pits containing varying ore grades, sulfide and oxide ore types, and differing mineralogy. The ores also contain gold and molybdenum values, and

    Jan 1, 1992

  • CIM
    Developing an Interactive, Collaborative Virtual Underground Mine to Support Mine Emergency Response Excercises

    By Tony Szwilski

    Using Unity 3D as a collaborative multi-user virtual on-line environment, an interactive virtual underground mine platform (IVUMP) is being developed to provide on-line access to mine safety preparedn

    Aug 1, 2013

  • CIM
    Developing and Equipping No. 4 Winze, San Antonio Mine

    By W. S. Hegler

    Introduction The San Antonio mine is on the north shore of Rice lake, thirty miles east of lake Winnipeg and 120 miles northeast of the city of Winnipeg. Since production was started in 1932, about

    Jan 1, 1949

  • AUSIMM
    Developing and Implementing Ore-Specific Targets for the Rosebery Concentrator

    Production targets are the basis for almost every decision made by operations personnel in the daily operation of a concentrator. It is the production targets that determine how the plant is operated

    Oct 29, 2012

  • AUSIMM
    Developing and maintaining mine site ventilation capability and new trends in mine ventilation career paths

    By D J. Brake

    The importance of mine ventilation to health and safety in both coal and metalliferous mines has been long recognised. The primary and secondary ventilation systems in most metalliferous mines incur 5

    Oct 12, 2022

  • CIM
    Developing and Sustaining Capability in Process Mineralogy

    "There are a number of disciplines in the minerals industry for which concern has been expressed regarding the sustainability of human capital. The boom-bust cycles that occur in the industry, the tre

    Jan 1, 2016

  • SME
    Developing and Testing an Optimization Algorithm for Practical Open-Pit Pushback Design

    By Juan L. Yarmuch, Hyam Rubinstein

    Open-pit mine planning is a key process in the definition of mineral reserves and their efficient removal. Ore in open-pit mines is extracted bymining sequential pits called pushbacks. Pushbacks need

    Jun 25, 2023

  • AUSIMM
    Developing Assessment Methods and Remediation Protocols for New Zealand Sites Impacted by Acid Mine Drainage

    By A Black, A de Jo, J Cavanagh, J Harding

    Acidic and metal-rich waters have been discharging from Sullivan Mine, West Coast, New Zealand since the closure of the mine during the early- 1990s. This has resulted in a decrease in pH from a backg

    Jan 1, 2003

  • AUSIMM
    Developing Australia's First Block Caving Opeartion at Northparkes Mines - Endeavour 26 Deposit

    The introduction of a new mining method to Australia is not without its risks and challenges. This paper discusses the processes of planning a new operation, with particular emphasis on block caving

    Jan 1, 1995

  • AIME
    Developing Chuquicamata's Open Pit Haulage System

    By Robert Laurich

    Chuquicamata pit was opened in 1915 with steam shovels and steam locomotives brought down from the Panama Canal excavation project. With expansions in the early years, more steam locomo¬tives were bro

    Jan 11, 1959

  • ISEE
    Developing Controlled Blasting Methods For Excavation of Rock and Concrete Near Critical Structures

    By Gordon F. Revey

    In construction and mining work, situations occasionally occur where hard rock or concrete must be excavated at locations near critical structures or utilities. Fearing damage from blasting, contracto

    Jan 1, 2002

  • CIM
    Developing Declines Under a Moving Glacier - The Kumtor Underground Access Story

    By Darren Medd

    Kumtor Gold Company (KGC) currently operates the 500,000 tonnes per day Kumtor open pit gold mine located in the Issyk-Kul region of the Kyrgyz Republic at an elevation of more than 4,000 m. To supple

    Aug 1, 2013

  • AUSIMM
    Developing dephosphorisation technique for iron ore with reductionprocess

    By K Higuchi, K Saito, O Ishiyama

    Iron ore in Australia is predicted to increase in its phosphorus content in the near future, which is detrimental to properties of steel product. Steelmakers are concerned by the content of phosphorus

    Sep 18, 2023

  • DFI
    Developing Effective Specifications For Tremie-Concrete Placement In Drilled Shafts

    By Giuliana A. Zelada-Tumialan

    Reduced workability and flowability of the concrete through the tremie tubes and drilled shaft reinforcement have been identified as the main causes of tremie-concrete drilled shaft concrete defects.

    Jan 1, 2009

  • AIME
    Developing Emission Control Strategies For A Coal-Fired Power Plant – A Case History

    By Young C. Kim, Francis Martino, Ish Chopra

    For the past two and one-half years, various emission control strategies were jointly developed by the University of Arizona and the Homer City Owners to com- ply with the clean air requirements at it

    Jan 1, 1983

  • AUSIMM
    Developing flotation circuit control and automation for the Phu Kham Copper-Gold Operation concentrator

    By L Mikhael Gurieff, D Baas

    The Phu Kham Copper-Gold Operation (Phu Kham Operation) is located in the Lao People's Democratic Republic and is owned and operated by the Lao-registered company, Phu Bia Mining Limited (PBM). Au

    Aug 29, 2018

  • SME
    Developing Functional Baselines

    By William W. Edgerton

    Establishing geotechnical baselines on soft ground projects that require the use of closed-face tunnel boring machines (TBMs) is difficult. It is hard to see the face when mining and the excavated mat

    Jan 1, 2012

  • AUSIMM
    Developing Gold Mines in the 1980's

    The 1980's has seen a revolution in gold mine developments in Australasia. We are witnessing a near ten fold increase in all phases of gold mine development ranging from exploration through to pr

    Jan 1, 1986

  • CIM
    Developing Greater Synergy Among Geologists, Mineral Processors and Mining Engineers/Operators

    By Marcel Vallée

    Frequently, costs overruns and defaults in mining project performance result in serious problems and headaches for all project participants and impact on corporate objectives, profits and image and, o

    May 1, 2002

  • SME
    Developing Information Management And Systems Analysis Procedures For Abandoned Mine Lands Site Selection

    By E. K. Albert

    In 1977, Congress enacted Title IV of the Surface Mining Control and Reclamation Act (SMCRA), providing for an "abandoned ml.ne reclamation fund". This fund, taken from a fee collected from operating

    Jan 1, 1990