Search Documents

Sort by

  • CIM
    Construction of prime coking coal washeries in India

    By Bali. D. D., S. Chattopadhyay

    "The planning and construction of prime coking coal beneficiation plants in the nationalized mines in India are reviewed. Flow schemes, construction practice, materials consumption, and costs are deta

    Jan 1, 1986

  • AUSIMM
    Construction of Reinforced Concrete Chimney at Yallourn Briquetting Works

    The principal dirnensions of the chimney were fixed as follows: Height from formation to coping, 328 ft. 8 in.; inside diameter concrete shell, 13 ft. Gin.; inside diameter of the 4~-in. brick lining.

    Jan 1, 1924

  • SME
    Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio

    By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert

    PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with

    Jan 1, 2007

  • SME
    Construction of the Combined Sewage Overflow Tunnel for the City of Fall River

    By Shemek Oginski

    The 5 km (16,194 lf) of 6.1m (20 ft) diameter TBM driven tunnel built by the J.F.Shea Co. will serve as sewage overflow storage. The TBM tunnel and four connecting tunnels excavated by drill and blast

    Jan 1, 2005

  • SME
    Construction Of The East Side Access Manhattan Tunnels

    By Don Hickey

    The MTA in conjunction with LIRR, are in the process of expanding one of the largest commuter railroads in the country, with over 260,000 passengers a day. The LIRR, which provides 700 passenger train

  • SME
    Construction of the Powerhouse Cavern for the Pumped Storage Scheme Kops II in Austria

    By Helmut Westermayr, Michael Tergl

    DESCRIPTION OF PROJECT Geographic Setting The Kops II plant is a pumped storage scheme of the hydroelectric power producer ‘Vorarlberger Illwerke AG’ which is currently under construction in t

    Jan 1, 2007

  • SME
    Construction of the Sacramento River Tunnels on the Lower Northwest Interceptor Sewer, Sacramento, California

    By Dan Martz, Bill Moler, David Young, Wally Chen, Matthew Crow, Steve Norris, Tolga Togan

    Two 610 m (2000 ft) long tunnels were driven through water bearing silts, sands and clays beneath the Sacramento River using a 4.59 m (15.1 ft) diameter Earth Pressure Balance Tunnel Boring Machine (E

    Jan 1, 2007

  • SME
    Construction of the Turin Metro Line 1 Tunnel by N.3 EPB TBMs

    By P. Perruzza, R. Grandori, A. De Biase, A. Ciamei, A. Busillo

    The Turin metro alluvium soil is mainly made of large boulders, cobbles and gravel , few sand and almost no fines. This grain size curve is out of the range of application for EPB and Slurry TBMs.

    Jan 1, 2005

  • SME
    Construction of the West Area CSO Tunnels and Pumping Station

    By Ray Hutton, Darrell Liebno, Taro Nonaka

    Background Population growth and increasingly stringent regulatory controls on water quality across North America have resulted in municipal governments investing heavily in infrastructure to cont

    Jan 1, 2007

  • SME
    Construction Works Of Large-Section Vertically Parallel Twin Tunnels In Close Proximity

    By Kentaro Kuraji

    INTRODUCTION Background Tokyo, the capital of Japan, is one of the largest cities of the world. As many as 33 million people live in Tokyo and three neighboring prefectures although the city occupi

  • SME
    Construction — You need risk-based cost estimating

    By A. Moergeli, Philip Sander, John J. Reilly

    "Estimating and managing the costs of complex infrastructure projects – in the planning/design and construction phases, for both owners and contractors – has been a challenge for decades. The more com

    Apr 1, 2016

  • DFI
    Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic Retrofit

    By A. R. Dover

    The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew

    Jan 1, 2008

  • DFI
    Consultants Can Be Safe, Too – A Collaborative Approach

    By Brian FitzPatrick, Michael J. Weaver

    Everyone has a role in site safety, even consultants. This paper presents a summary of how a geotechnical and environmental consulting firm, with field staff on construction and subsurface exploration

    Jan 1, 2019

  • SME
    Contact Angles Of Powders From Heat Of Immersion

    By I. Yildirim

    Water contact angles of talc powders were determined from the values of the heats of immersion measured using a flow microcalorimeter. The results were used to calculate the contact angles using a ri

    Jan 1, 2001

  • CIM
    Contaminant Problems in Agrium’s Canadian Phosphate Business

    By Julie Culverhouse, Dennis Grimm, Kieran Harding, Jean-Francois Boulanger

    "Agrium’s Canadian Phosphate Business (CPB) is comprised of Kapuskasing Phosphate Operations (KPO) in Northern Ontario, Canada’s only operating phosphate mine, and Redwater Phosphate Operations (RPO)

    Jan 1, 2011

  • SME
    Contaminant Removal From Mine Effluents: Understanding The Aqueous Chemistry Is Key

    By L. R. Moore

    The World Health Organization (WHO) considers contamination from oxyanions, such as selenium and arsenic, a global concern. While their elemental forms are toxic, the aqueous oxyanions are more so. Th

    Feb 27, 2013

  • AUSIMM
    Contaminated Water Management for the Golden Cross Mine

    By M J. Kindley

    The Golden Cross Gold Mine Project is now fully operational and into its second year of operation. Because of its location in the sensitive Coromandel Peninsula

    Jan 1, 1993

  • AUSIMM
    Contamination of Samples for Analysis When Using Ring Grinder Mills

    Ore samples generally require preparation before analysis. Serious problems can occur with contamination degradation and particle size effects. Both grinding element contammation and sample cross cont

    Jan 1, 1978

  • AUSIMM
    Contemporary Criteria of Open Pit Long-Term Production Scheduling

    Production scheduling of open pit mining is a key area as it deals with the management of operating cash flows of mining companies. The efficiency of long-term schedules is usually assessed with econo

    Sep 26, 2011

  • AIME
    Contents

    Jan 1, 1961