Search Documents

Sort by

  • SME
    Impacts of Geotechnical Issues on Design of the Beacon Hill Tunnel and Station Project

    By Michael S. Kucker, Stuart Warren, Robert A. Robinson, Michael J. Lehnen, David McAllister

    Geotechnical conditions exposed by the phased exploration programs have had a major impact on the selection of excavation and support methods, dewatering requirements, size of openings, vertical align

    Jan 1, 2005

  • SME
    Impacts Of Ground Convergence On TBM Performance In Ghomroud Tunnel

    By Ebrahim Farrokh

    Ghomroud water conveyance tunnel project is under construction using shield Tunnel Boring Machines (TBM) for a total length in excess of 50 km. Phase 1 of the project included 36 km of tunnel divided

  • SME
    Impacts of Human Fatigue Impairments on Mine Equipment Operation Performance - SME Annual Meeting 2026

    By Vanessa Viterbo, Lia Walker, Hassan Khaniani, Vitor Viterbo

    Fatigue is a major contributor to haul-truck incidents in mining, with up to 65% of fatigue-related events associated with operator drowsiness or microsleep episodes, Williamson et al. (2011) and Cate

    Feb 22, 2026

  • SME
    Impacts Of Spoil Conditions On Reforestation Of Surface Mined Land (b2bd3f1e-5fbd-441d-ae83-ec597c5ff463)

    By M. H. Pelkki, R. J. Sweigard, P. W. Conrad, J. M. Ringe, D. H. Graves

    Research has shown that excessive soil compaction is detrimental to the establishment of trees in reclaimed soils. Dry bulk density and penetration resistance are two soil parameters that can be used

    Jan 1, 2001

  • IIMP
    Implementación de Datamine en la empresa minera Yauliyacu

    By Jesús Astuvilca

    Con el objeto de mejorar las condiciones de seguridad y continuar el incremento de la producción a corto plazo, la empresa minera Yauliyacu implementa el uso intensivo del software minero DATAMINE. En

    Jul 17, 2000

  • CIM
    Implementation of a Flotation Expert Control System at the Raglan Mine

    By G. Couture

    "The Glencore Raglan mine Concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. The nickel metallurgical plant was originally designed to process 100 tonnes per hour of o

    Jan 1, 2015

  • AUSIMM
    Implementation of a management operating system at the Telfer Underground Gold Mine

    By M Franklin, C Puglisi, S Fitch

    Implementation of a well planned and executed Management Operating System (MOS) can result in widespread improvements to operational performance but its success relies heavily on the investment by and

    Mar 15, 2021

  • ISEE
    Implementation of a Remote Blasting Engineering Center in Peru

    By Jorge Cárdenas, Luis Huaroc, Máximo Cari, Nestor Delgado

    In Peru, after four years of pandemic, some mining companies have chosen to install integrated operating centers in central offices where through network technology and video surveillance it allows th

    Jan 21, 2025

  • AUSIMM
    Implementation of a Surface-based Hydraulic Fracturing Program to Successfully Propagate a Large Cave through Hard, Competent Near-surface Rock Masses to Achieve Breakthrough

    By L Olivier, R J. Lowther, J L. Lett, I Brunton

    Hydraulic fracturing to precondition the orebody to enhance rock mass cavability is gaining acceptance in underground cave mining applications. Assisting cavability is becoming important as an increas

    May 9, 2016

  • AUSIMM
    Implementation of Advanced Transfer Chute Designs

    By N van Aarde, B A. Moore, S van der Merwe

    Frequently materials handling operations are compromised by transfer chute problems ranging from high wear rates, blockages and ineffective loading of the downstream conveyor. This paper will present

    Aug 12, 2013

  • ISEE
    Implementation of an Integrated Quality Assurance and Control System Applied to High Complexity Blasting Open Pit

    By Regina Rocha, Miguel Humpire

    One of the challenges within unitary mining operations is blasting, which has a significant downstream impact on the following processes, which is why mining companies ensure the results of the blasti

    Feb 6, 2023

  • CIM
    Implementation of Cyanidation by Size Class at Sleeping Giant Mill

    By Gilles Landry, Mohamed Ourriban, Pierre Pelletier, Ahmed Bouajila, Claude Gagnon

    "This paper summarizes the work carried out to develop and implement the gold cyanidation by size class (CSC) process, a novel concept aiming to reduce cyanide consumption.First, the authors will pres

    Jan 1, 2009

  • AUSIMM
    Implementation of Fine-Screening in Preparation of KGHM PM SA Sandstone-Carbonate Copper Ore for Flotation

    Implementation of Fine-Screening in Preparation of KGHM PM SA Sandstone-Carbonate Copper Ore for Flotation

    Sep 13, 2010

  • SME
    Implementation of Good Sampling in Mineral Processing Plants

    By Luc Morin

    What you don't know won't hurt you! This attitude can get you into trouble when considering your process! When trying to extract the most and the best possible performance from a mineral pro

    Jan 1, 1999

  • CIM
    Implementation of mining-induced seismic hazard maps at Creighton Mine for risk assessment of rockmass damage due to mining at depth

    By Pavel Vasak

    The Laurentian University Virtual Reality Laboratory (VRL) has provided a unique platform for the development and testing of novel seismic and microseismic data processing and visualization technology

    Oct 1, 2010

  • CIM
    Implementation of Paste Backfill at the Williams Mine

    By Eric Konigsmann, Doug Spence, Scott Jones

    "The Williams Gold Mine is located in the Hemlo camp of Northwestern Ontario and is one of Canada’s largest gold producers with annual gold production of 400,000 ounces. The operation is owned and ope

    Jan 1, 2004

  • AUSIMM
    Implementation of the BIOX® process at the Runruno Gold project

    By J A. van Niekerk, J G. Jardine, J W. Olivier

    The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-

    Sep 11, 2017

  • CIM
    Implementation of the management safety audit system

    By Claude MacDonald, John H. Ashburn

    "IntroductionIndustrial growth and technological change over recent years had been accompanied by two major sources of concern to management and employees: (a) increase in occupational injury and illn

    Jan 1, 1987

  • ABM
    Implementação De Uma Área De Backoffice Na Diretoria De Suprimentos Da Csn

    By Alexandre José Ramos Valentim, Valéria da Silva Guandelini, Fausto Kunioshi

    Em um mercado cada vez mais competitivo, garantir serviços com qualidade em ambientes mais produtivos e de custos reduzidos são valores fundamentais para aumentar a eficiência das organizações. Basead

    Oct 1, 2019

  • SME
    Implementing a tracking and ventilation control system at Barrick Goldstrike?s underground division

    By M. A. Meyer

    Underground mining accidents in the USA in recent times have prompted the Mine Safety and Health Administration (MSHA) to review emergency and tracking systems for underground mines. Several communica

    Jan 1, 2009