    Design Overview of Technogrid Conveyance Arresting System and Mounting Details in the Hermosa Headframe - SME Annual Meeting 2026

    By C. H. Stephenson, Z. White

    This paper presents the design approach case study for incorporating a Technogrid® conveyance End-of-wind arresting system within the new South32 Hermosa headframe. Focus is placed on energy absorptio

    Feb 22, 2026

  • SAIMM
    Design Principles for Optimizing an Established Survey Slope Monitoring System

    By N. Mphathiwa

    When slope angles are designed during open pit optimization, there is a risk factor applied in steepening the slopes. The steepening of slope angles has implications for the safety and economics of th

    Jan 1, 2014

  • SME
    Design Problems Associated With Port Handling Facilities

    By Ian S. Ross

    The emphasis in this paper is focussed on dry bulk car go or the same cargo converted to slurry form for ease of handling. It is this type of cargo which is of primary interest to the mining industry

    Jan 1, 1972

  • NIOSH
    Design Procedure Optimizes Roof Truss Installations In Bedded Roof - Objective

    Provide mine personnel with a convenient means of determining the optimum installation geometry of roof trusses in bedded roof. Background Mine operators frequently ask the following questions

    Jan 1, 1989

  • ISEE
    Design Software for Electronic Detonators

    By Kia Riihioja, Mike Higgins

    A major difference between electronic and pyrotechnic detonators is that, in almost all but the simplest of blast layouts, computer software is required to plan a blast using electronic detonators. Wh

    Jan 1, 2004

  • SME
    Design, Construction And Operation Of A Long Large Diameter Polyethylene Tailings Pipeline ? Introduction

    By M. D. Scott

    Lornex Mining Corporation operates an open pit porphyry copper mine in the Highland Valley southwest of Kamloops with a rated capacity of 43 500 TPD (48,000 TPD). It went into production in April 1972

    Jan 1, 1976

  • CIM
    Design, Construction, and Commissioning of Air Separation Units in Remote Locations

    By K. van Warmerdam, M. Pearson, C. Kember, D. McMullen, M. Thayer, C. Ugarenko

    In July 2012, Hatch Ltd. and Air Products & Chemicals Inc. completed construction and commissioning of a 4000 tpd O2 cryogenic air separation unit (ASU) for Barrick Gold’s Pueblo Viejo Project located

    Jan 1, 2014

  • AUSIMM
    Design, implementation and field performance of a face destress blasting method for mine development

    By E Villaescusa, C Drover, I Onederra

    Development face destress blasting is a construction technique in deep mining, which aims to prevent, reduce the frequency, or manipulate the timing of violent, stress-driven rock mass instability at

    Nov 29, 2022

  • IMPC
    Design, Modelling and Control of Flotation Equipments

    By Juan B. Yianatos

    "After almost 100 years, since the first commercial application began in Australia, flotation has shown an extraordinary growth and nearly 2 billion tons of ore per year are presently treated by flota

    Jan 1, 2003

  • IMPC
    Design, Modelling and Control of Flotation Equipments ( XXII International Mineral Processing Congress)

    By Juan B. Yianatos

    "After almost 100 years, since the first commercial application began in Australia, flotation has shown an extraordinary growth and nearly 2 billion tons of ore per year are presently treated by flota

    Jan 1, 2003

  • IMPC
    Design, Simulation and Operation Column Flotation

    By J. B. Rubinstein

    "The paper gives an overview of the history of flotation machine development. The laws of their evolution are stated and the place and role of column flotation are demonstrated.The major parameters of

    Jan 1, 2003

  • SME
    Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023

    By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline

    Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump

    Jun 13, 2023

  • DFI
    Design-Build Synergy To Deliver Pile Foundations

    By David P. Sauls

    Design-build contract delivery provides unique opportunities for efficiencies in pile foundation design and installation. The Louisiana Department of Transportation and Development (LADOTD) US Highwa

  • CIM
    Design. Aspects of Ground Consolidation by the Freezing Method for Shaft Sinking in Saskatchewan

    By Witold J. S. Ostrowski

    Stabilization of water-bearing sediments by the freezing method for shaft sinking has been used for over 80 years on the European Continent. The real application of this method in Canada started with

    Jan 1, 1967

  • TMS
    Designing a Collaborative System for Socio-Environmental Management of Industrial Waste

    By F. Baldini, M. S. Borges

    "The proposed method emphasizes the optimization of waste management with regard to the exploitation of raw materials incorporated in the remains of industry, as well as the economics of natural resou

    Jan 1, 2011

  • SME
    Designing a Rockfall Testing Program for Open-Pit Mines to Investigate Runout and Bench Catchment - SME Annual Meeting 2024

    By Sean Warren, JOSEF BOURGEOIS

    The potential of rockfall at open-pit mines presents a continuous hazard to mine workers and is typically mitigated by designing catch benches at empirically determined widths. The National Institute

    Feb 1, 2024

  • SME
    Designing An Oil Shale Mine Ventilation System ? Introduction

    By Floyd C. Bossard

    In underground mining operations, the over- riding issue has to be protection of worker health and safety. The employees underground, making a living in a dangerous occupation, know these are major is

    Jan 1, 1983

  • SME
    Designing and Building CSO Tunnels in Midwestern Geology - A Critical Review and Study of Project Implementation and Construction Methods

    By Matthew Anderson, David Day, Paul Smith

    "The Midwest is presently the focus for Combined Sewer Overflow (CSO) abatement in the United States (U.S.). Most of the EPA mandated utility and municipal long term CSO abatement programs in large me

    Jan 1, 2016

  • CIM
    Designing and implementing effective environmental management

    By Randy Billing, J. Fraser Wilson

    "IntroductionThe job of designing and implementing effective environmental management sounds like what one executive, assuming responsibility for a very sick organization with lots of potential descri

    Jan 1, 1991

  • AUSIMM
    Designing and Operating Backfill Systems on a South African Gold Mine

    For effective backfilling, a system with the 13 features covered under the section: effective backfill systems, is required. Effective backfilling cannot be done with systems that are badly designed,