Search Documents

Sort by

  • DFI
    Drilled Shaft Side Shear Capacity In Compressible Materials What Influences Capacity?

    By J. A. Hayes

    For over a decade the Osterberg Load Cell has been successfully used to determine the shear capacities of drilled shafts. Since the test method measures side shear directly, analytical complications d

    Jan 1, 2003

  • CIM
    Drillhole Placement Subject to Constraints for Improved Resource Classification

    By J. B. Boisvert, D. S. Silva

    "Drillhole placement involves benefits, costs, and constraints. Benefits are related to the drilling campaign value, which includes maximizing “indicated” and “measured” resources. Costs include drill

    Jan 1, 2018

  • AUSIMM
    Drilling - Continuity - Mine Planning

    The AusIMM/AMIC code for reporting Reserves seeks to improve the calibre of professional reporting on this subject. But have they gone far enough? Should the code appreciate that the degree of reli

    Jan 1, 1989

  • AIME
    Drilling - Equipment, Methods and Materials - Microbit Studies of the Effect of Fluid Properties and Hydraulics on Drilling Rate

    By J. R. Eckel

    It has long been known that mud properties affect drilling rate and that drilling with water is as much as six to .seven times faster than with mud. However, it is not known why drilling rates with mu

  • AIME
    Drilling - Equipment, Methods and Materials - Strain Hardening of a Porous Limestone

    By J. B. Cheatham

    Applications of the mathematical theory of plasticity promises to lead to the solution of many drilling and rock mechanics problems. ,Because of mathematical considerations, the inelastic behavior of

  • AIME
    Drilling - Equipment, Methods and Materials - Temperature Distribution in a Circulating Drilling Fluid

    By L. R. Raymond

    With the trend toward deeper and consequently hotter holes, measurements of drilling mud properties at atmospheric temperatures are becoming increasingly inadequate.' Both the prediction and cont

    Jan 1, 1970

  • CIM
    Drilling and Blasting at the Cassiar Mine

    By T L. Horsley

    This paper deals with the drilling and blasting methods employed at the Cassiar mine, which is located just south of the B.C.-Yukon border. It covers both the "pit" and "peak" mining operations. Speci

    Jan 1, 1965

  • ISEE
    Drilling and Blasting in Hot and Reactive Ground Conditions at Barrick Goldstrike's Meikle Mine

    By D. Scott Scovira, Remi Proulx

    The Meikle Mine is a high grade, underground gold mine utilizing primary-secondary longhole open stoping with delayed backfill to produce 3000 stpd of ore. Hot and reactive ground conditions were enco

    Jan 1, 2000

  • NIOSH
    Drilling And Blasting In Open-Cut Copper Mines - Introduction

    By E. D. Gardner

    Open-cut mining of copper ores in the western United States is a relatively new industry. At first the mining methods were mainly adapted from those used at open-cut iron mines and at quarries, but no

    Jan 1, 1927

  • ISEE
    Drilling and Blasting on the Ty Nant Project.

    By Rob Farnfield, Ben Williams

    The A5 road in the United Kingdom forms an ancient and well-used route through the hills and mountains of North Wales. In the 1990?s a programme of work was conducted to upgrade the road to modern sta

    Jan 1, 2011

  • SME
    Drilling And Blasting Techniques At The Navajo Mine

    By Richard W. Amerman

    The final cost and quality of a project employing equipment, labor, and materials is dependent upon the expediency and extent to which each of these parameters are used. An ideal solution then, would

    Jan 1, 1969

  • AIME
    Drilling and Producing – Equipment, Methods and Materials - The Development of Shaped Charges for Oil Well Completion

    By Blake M. Caldwell, Thomas C. Poulter

    A new approach to an old problem has made it possible to do in a a tively short period what has not been accomplished in the past three quarters of a century using strictly experimental metho

    Jan 1, 1958

  • AIME
    Drilling and Producing – Equipment, Methods and Materials - Volume Requirements for Air or Gas Drilling

    By R. R. Angel

    Drilling rate is a parameter that should be considered in determining the volume requirements for air and gas drilling. The use of past methods which ignore the effects of the solids content upon the

    Jan 1, 1958

  • AIME
    Drilling and Producing – Equipment, Methods, and Materials - Reservoir Fracturing - A Method of Oil Recovery from Extremely Low Permeability Formations

    By L. E. Wilsey, W. G. Bearden

    This paper presents results of analysis of the effect of fracturing on initial flow rates and on ultimate recoveries from low capacity oil formations. This analysis shows that even in formations of pe

    Jan 1, 1955

  • AIME
    Drilling and Producing – Equipment, Methods, and Materials - Well Productivity Increase from Drain Holes as Measured by Model Studies

    By R. L. Perrine

    The rise of drain holes drilled from a well to improve productivity is becoming increasingly common. This paper presents data on the productivity increase that may he expected. The data were obtained

    Jan 1, 1956

  • AIME
    Drilling and Production Equipment, Methods and Materials - A Hydraulic Process for Increasing the Productivity of Wells

    By J. B. Clark

    The oil industry has long recognized the need for increasing well productivity. To meet this need, a process is being developed whereby the producing formation permeability is increased by hydraulical

    Jan 1, 1949

  • AIME
    Drilling and Production Equipment, Methods and Materials - A Hydraulic Process for Increasing the Productivity of Wells

    By J. B. Clark

    The oil industry has long recognized the need for increasing well productivity. To meet this need, a process is being developed whereby the producing formation permeability is increased by hydraulical

    Jan 1, 1949

  • AIME
    Drilling and Production Equipment, Methods and Materials - The Core Recorder

    By Clark Millison

    The core recorder, a mechanical instr-ent for determining the exact depth at which core is recovered, drilled up or lost, is described. Examples of charts from the recorder are explained and interpret

    Jan 1, 1949

  • AIME
    Drilling and Production Equipment, Methods and Materials - The Core Recorder

    By Clark Millison

    The core recorder, a mechanical instr-ent for determining the exact depth at which core is recovered, drilled up or lost, is described. Examples of charts from the recorder are explained and interpret

    Jan 1, 1949

  • CIM
    Drilling and Production Practices in the United States

    By E. G. Gaylord

    THE material improvements which have been made in the practice of exploiting oil and gas reservoirs in the United States during recent years may be attributed largely to: (1) The necessity for drill

    Jan 1, 1941