Search Documents

Sort by

  • TMS
    Mathematical Description of Flash Smelting

    By W. G. Davenport

    The remainder of this book develops and uses mass and heat balances to describe steady"state flash smelting. Its objectives are to: a) describe the many ways a flash furnace operator can produce spec

    Jan 1, 2001

  • TMS
    Mathematical Description Of Flows In Continuous Casting Machine Of Steel

    By Pascal Gardin

    The purpose of the paper is the mathematical modelling of flows inside steel continuous casting mould. For CFD validation of flow oscillation prediction, unsteady calculations with a realizable k- mod

    Jan 1, 2006

  • CIM
    Mathematical model for the leaching of acanthite in thiosulfate solutions

    By G. T. Lapidus, J. Trejo-Gallardo

    A phenomenological model is presented for leaching silver from silver sulfide contained in mineral particles with ammoniacal thiosulfate solutions of copper in stirred reactors. Experimental results w

    Jan 1, 2005

  • SME
    Mathematical Modeling Applied To Analysis And Control Of Grinding Circuits Part 1. Development Of Comminution Models ? Introduction

    By W. E. Horst

    In Part I of this paper we describe two techniques that were employed in the development of mathematical descriptions of the size reduction process which takes place in a ball mill. In Part II we show

    Jan 1, 1970

  • TMS
    Mathematical Modeling of Particle Suspension in Pachuca Tanks

    By Rodríguez M. Esperanza

    The efficient performance of Pachuca tanks is strongly linked to the suspension of mineral particles, which results from the motion of the liquid caused by injected gas rising, in general, through a c

    Jan 1, 2009

  • TMS
    Mathematical Modeling: An Essential Component of the Design of Space Experiments

    By Elliot Schwartz, Julian Szekely

    "In this paper we describe an experiment that was recently performed on the IML-2 Space Shuttle mission in which the thermophysical properties of molten metals were measured using electromagnetic levi

    Jan 1, 1994

  • SAIMM
    Mathematical Modelling Of Heat Transfer In Six-In-Line Electric Furnaces For Sulphide Smelting ? Synopsis

    An efficient and portable mathematical model has been developed for simulating heat transfer in six-in-line slag-resistance-heating electric furnaces for smelting sulphide ores to produce base metals

    Jan 1, 2011

  • CIM
    Mathematical modelling of the Sherritt-Gordon ammoniacal pressure leaching process

    By P. A. Bahri, D. G. Dixon, T. M. Woodward

    A comprehensive mathematical model of the Sherritt-Gordon ammoniacal pressure leaching process at K winana Nickel Refinery has been constructed. The process is comprised of six autoclaves functioning

    Jan 1, 2005

  • SME
    Mathematical Programming A Tool For Production Scheduling And Product Distribution In The Mineral Industry

    By D. N. Madge

    A survey is given of production scheduling systems currently in use or contemplated for future use in Cominco operations. Emphasis in this presentation is made on the chain of decisions that are made

    Jan 1, 1966

  • SME
    Mathematical Programming Applications In The Crushed Stone Industry

    By R. Venkataramani

    Crushed stone operations have become more difficult due to rising costs of labor and equipment, with the consequent reduction in profit margins. Competition from other operators and the encroachment o

    Jan 1, 1971

  • SME
    Mathematics Of Mine Sampling III Whither Geostatistics?

    By Robert F. Shurtz

    This paper suggests that pre-occupation with the random process model notised by geostatisticians may result in neglect of more promising techniques, especially since the random process model does not

    Jan 1, 1980

  • CIM
    Mattagami River Refractory Clays

    By A. E. Hilder

    Introductory The following pages present the results of field investigations, laboratory and commercial tests, drilling, surveying, and preliminary development of the refractory clays which have been

    Jan 1, 1935

  • SME
    Maturi Deposit - Updated Mineral Resource Estimate

    "INTRODUCTION Twin Metals Minnesota (TMM) (operating as a joint venture between Duluth Metals and Antofagasta PLC) assumed control of the property in 2010. Amec became involved with the project in 201

    Jan 1, 2018

  • AUSIMM
    Maturity of Jurisdictional Abandoned Mine Programs in Australia Based on Web-accessible Information

    By C J. Unger, A M. Lechner, A Walton, V Glenn, M Edraki, D R. Mulligan

    In Australia, responsibility for abandoned mines can be unclear. With a few exceptions, state and territory governments have become responsible for abandoned mines on Crown land and private landholder

    Jul 16, 2014

  • AUSIMM
    Maximise Orebody Value through the Automation of Resource Model Development Using Machine Learning

    By S Oliver, D Willingham

    "Although a resource model is central to the mineral resource value estimation process (Glacken and Snowden, 2001), creating it is a labour intensive task and in the end it is a limited representation

    Jun 15, 2016

  • AUSIMM
    Maximising asset value through optimal block by block decisions on marginal material

    By F Phillips, E Deucker, J Kato

    It is challenging to determine the optimal mining strategy to maximise value when a mine plan includes mineralised material which does not meet the full cost of mining but has value exceeding the vari

    Mar 15, 2021

  • CIM
    Maximising Concentrate Revenues at the Xstrata Copper Kidd Concentrator

    By G. R. Morin, A. R. Leggett

    "In 2010, closure of the Kidd metallurgical plants along with structural changes to the historical ratios of payable metals led to a review of the operating targets at the Kidd concentrator. Previous

    Jan 1, 2013

  • CIM
    Maximising Hoisting Capacity Whilst Minimising Capital Investment

    By A. A. Wessels, D. P. Allison

    "Mine hoists are built to handle a certain nameplate capacity; they are specified and designed according to the required duty. However, as production capacity increases in other parts of an operation,

    Jan 1, 2019

  • AUSIMM
    Maximising Productivity through Big Data, Simulation and Predictive Analytics

    By M T. Grigoleit, M S. Schneider

    The iron ore industry in Australia has, in recent years, experienced an unprecedented growth phase. But now that major expansions are moving into the operation phase, new challenges have emerged. Wher

    Jul 13, 2015

  • AUSIMM
    Maximising regional opportunities for in-pit tailings disposal for Queensland coalmines

    By K Baker, J Purtill

    One of the key challenges for the mining industry globally is the rehabilitation of mine waste, and Queensland is no exception. Out of pit waste structures including waste rock dumps and tailings stor

    Aug 2, 2023