Search Documents

Sort by

  • DFI
    Piling Framed Tie Down Concrete Retaining Wall (4e2f4102-889f-44e0-a228-adb5cc7c450f)

    By Saieb Haddad, Henry Pate

    "Building retaining walls in an urban area is becoming more diffi cult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for in

    Jan 1, 2007

  • DFI
    Piling In Calcareous Red Bed Soils and Weak Rock Formation – Design Development for a Gas Processing Facility

    By Rick Piovesan, Pramod Rao, Nihal Bohra, Mark Wahler

    "This paper discusses the approach followed for the geotechnical design of 355 mm and 457 mm diameter driven open-ended steel pipe piles used for a gas plant at a green field site in Pilbara region in

    Jan 1, 2015

  • CIM
    Pillar Design in Underground Mining

    Pillars are used in various forms in underground mining. For several decades pillar design has been an issue in both soft and hard rock underground mining. The major use of pillars is in room-and-pill

    Aug 1, 2013

  • AUSIMM
    Pillar Design Procedures and Research Methodologies - Can There or Should There be a Unified Approach?

    After some 50 years of worldwide research in relation to coal pillar mechanics and design as well as numerous workshops and technical papers related to these issues there is still some significant dis

    Nov 25, 2010

  • AUSIMM
    Pillar Extraction at the Doe Run Company, 1991-1998 (82799d0e-2b30-4c7e-911c-ac1c973112a1)

    By Yanske TR, Lane WL

    The Doc Run Company and its predecessors have been mining for over 130 years utilising the room and pillar mining method. This method has left approximately 20 per cent of the orebody in the remaini

    Jan 1, 1998

  • CIM
    Pillar Extraction at the Sullivan Mine

    By P. T. Bloomer

    Introduction Mining of the orebody of the Sullivan mine, which is owned and operated by the Consolidated Mining & Smelting Company of Canada, Limited, has reached a point where pillar extraction is

    Jan 1, 1948

  • CIM
    Pillar Extraction in Thick Coal at Canmore, Alberta, on Gradients Between 5 and 30 Degrees

    By H. G. Stephenson, C. W. Gregory

    "This article describes the methods used for pillar extraction in the Wilson Seam at Canmore Mines, Alberta. The Wilson Seam is extremely gassy and varies in thickness between 7 and 30 ft, with an ave

    Jan 1, 1972

  • AUSIMM
    Pillar Recovery at Cracow Gold Mine using Grouted Consolidated Mullock

    By V Mutton, L Potts, D Joyce

    This paper describes the method of extracting sill pillars within the underground operation from under unconsolidated mullock fill at the Cracow Gold Mine. This pillar recovery method was initially su

    Mar 26, 2012

  • CIM
    Pillar Recovery at Lamaque

    By The Mine Staff

    THE PROPERTY of the Lamaque Mining Company, Limited, ?is located in the Town of Bourlamaque, seventy miles east of Noranda, in Bourlamaque township, Abitrbi county, north western Quebec. Gold produc

    Jan 1, 1957

  • SME
    Pilot Investigation Of High Gradient Magnetic Separation Of Oxidized Taconites ? Introduction

    By D. R. Kelland

    A program has been carried out over the last two years to apply the technology of High Gradient Magnetic Separation (HGMS) to the problem of mineral beneficiation and specifically oxidized taconite ir

    Jan 1, 1975

  • TMS
    Pilot Plant Commissioning and Operations for Copper Sulfide In Situ Indirect Bioleaching

    By Theodore Ineich

    The “BIOMOre” project aims to prove the technical feasibility of indirect in situ bioleaching of sulfide minerals contained in a deep underground deposit, by bringing together the disciplines required

  • CIM
    Pilot Plant Demonstration of the Mintek Thermal Magnesium Process

    By M. Abdellatif

    Successful demonstration of The Mintek Thermal Magnesium Process (MTMP) was achieved in November 2004 at the pilot-scale, About 30 tons of magnesium producing recipe was smelted in the DC arc furnace

    Jan 1, 2006

  • CIM
    Pilot Plant Investigations on Cold Water of Bitumen from Alberta Bituminous Separation Sands

    By L. E. Djingheuzian

    Introduction For many years the immense deposits of bituminous sands of northern Alberta have been attracting the attention of our governments, engineers and .scientists ( 6). Undoubtedly these bitum

    Jan 1, 1952

  • SME
    Pilot study on the influence of the eccentric speed on cone crusher production and operation (edb7524e-49ff-4eb7-a7e1-0da505b43724)

    By D. Jacobson

    There are many different machine design parameters and variables that affect the production of cone crushers in a mineral processing plant. One of these variables is the speed at which the cone gyrate

    Dec 1, 2013

  • SME
    Pilot Test Of The Dupont Activator Technology At The Homestake Mine, Lead, South Dakota

    By H. Hinds

    Plant testing of DuPont's Activator Technology in the vat leach circuit of the Homestake mine shows increased gold recoveries of 3-5%. Activators are catalysts of gold dissolution in cyanide solu

    Jan 1, 1997

  • CIM
    Pilot Test Of The Permeable Reactive Barrier For Removing Uranium From The Flooded Gunnar Pit

    By D. Kong, A. Klyashtorin, L. McGilp, I. Wilson

    This work reports on applying iron oxide coated sands media in an experimental permeable reactive barrier to remove uranium species from uranium containing water. A field experiment was conducted at t

    Jan 1, 2020

  • SME
    Pilot Testing of a Permeable Reactive Barrier (PRB) to Remediate Sulfate, Metals, and Low pH in Groundwater

    By J. F. Strunk Jr., K. M. Maestas, Y. Chai, R. Legrand, R. L. Henry

    "Groundwater with elevated sulfate and metals was treated using a sulfate-reducing pilot PRB consisting of a series of six 55-gallon drums filled with ZVI (Fe0), wood chips, brewer’s grain, limestone,

    Jan 1, 2016

  • CIM
    Pilot Testing Of A Process Developed For Treatment Of Nicontaining Copper Concentrate After High-Grade Matte Separation Resulting In Blister Copper Production In Twozone Vaniukov Furnace

    By L. B. Tsymbulov, L. Sh. Tsemekhman, A. N. Golov

    Gipronickel Institute, JS is developing a process of continuous converting of Nicontaining copper matte and concentrates resulting in the production of blister copper and fluid NiO-containing slag in

    Jan 1, 2007

  • SME
    Pilot-Plant Solution Mining And Environmental Monitoring At The Mutooroo Copper Mine, South Australia - Introduction

    By J. H. Canterford

    To date, large-scale solution mining has received little attention in Australia, although the potential of this technique has not gone unnoticed. The possibility of long-term damage to the local envir

    Jan 1, 1981

  • CIM
    Pilot-Scale Frother Testing at Highland Valley Copper

    By S. D. D. Welsby

    "A pilot-scale flotation column was used to evaluate four polyglycol frothers at Teck’s Highland Valley Copper Mine. The column was fed with flotation plant feed from the grinding circuit cyclone over

    Jan 1, 2014