Search Documents

Sort by

  • DFI
    Design And Installation Of Pretensioned Spun Concrete Piles To Support A Large Diameter Sewer

    By Naresh Koirala

    The Greater Vancouver Regional District completed installation of a 2.5 Km long, 2400 mm diameter concrete sewer in Delta, British Columbia in 2000. The sewer traverses through area of peat and soft

    Jan 1, 2004

  • NIOSH
    Design And Instrumentation Of A Large Reverberation Chamber

    By Roy C. Bartholomae, Jeffrey Shawn Peterson

    1. INTRODUCTION In the early 1980s, the U.S. Department of the Interior’s Bureau of Mines Pittsburgh Research Center required that a large reverberation acoustic facility be constructed. This faci

  • DFI
    Design And Instrumentation Results Of A Reinforcement Concrete Piled Raft Supporting 2500 Ton Oil Storage Tank On Very Soft Alluvium Deposits

    By Shaw-Shong Liew

    This paper presents the design concept using floating piles to support 2500Ton oil storage tanks on a very soft alluvial clayey soil of about 40m thick in Riau Province of Sumatra, Indonesia. The floa

    Jan 1, 2002

  • DFI
    Design And Load Test Of Micropiles In A Power Plant In Missouri

    By Bidjan Ghahreman

    A total of 120 micropiles were constructed for foundations of a new selective catalytic reduction (SCR) unit in a coal-fired power plant east of Kansas City, Missouri. Construction was performed unde

    Jan 1, 2009

  • CIM
    Design and Maintenance of Platework and Vessels in Mines

    By A. J. Paul Laprairie

    The process for which it is to be used is too often the only consideration in the design of a vessel. A de-sign allowing for practical manufacture and erection, as well as for proper maintenance, can

    Jan 1, 1963

  • SME
    Design And Manufacture of Conveyor Pulley Assemblies for Drummond Coal Shoal Creek Slope Belt

    By Rick Sarkisian, Albert D. Bonneau, David Keech

    The Drummond Co. Inc.'s Shoal Creek Coal Mine Slope Belt Conveyor transports 5000 mtph (5500 tph) of material over a length of 1400 m (4600 ft.) and a lift of 3609 m (1180 ft.). Four 1500 kW (200

    Jan 1, 1996

  • SAIMM
    Design and manufacturing of a teleoperated excavator platform APCOM 2021

    By M. Salimov, J. Sattarvand

    The conventional visualisation method of remote equipment is through the installation of one or more cameras on the machine, and sending a live feed to the operator’s flat display. However, the perfor

    Sep 1, 2021

  • CIM
    Design and Materials Selection of Autoclaves and Auxiliary Equipment

    By P. Cheung, J. Gulyas, R. Clary

    Over the past 50 years, the use of autoclaves in the metallurgical industry has evolved from final metal recovery (hydrogen reduction) and purification (sulphide precipitate oxidation) to treating who

    Jan 1, 2004

  • SME
    Design And Operating Characteristics For Large Flotation Cells ? Historical

    By Nathaniel Arbiter

    The development of flotation machines since the first industrial use of the process can be divided into three stages. The first, up to about 1930, was marked by diversity in the means for contacting f

    Jan 1, 1979

  • TMS
    Design And Operating Characteristics Of The New Olen Tank House

    By C. Geenen

    At its Olen site, Union Minière Copper operates a new full-size deposit tank house. A first 200,000 t/y module was commissioned in October 1996, and an additional 130,000 t/y unit started in April 199

    Jan 1, 1999

  • SME
    Design and Operating Considerations for the Application of a Dry Grinding and Roasting Circuit for Refractory Gold Ore

    By P. G. Semple, K. W. Major, P. Eng.

    The recent increase in development of refractory gold deposits has resulted in changes to the traditional treatment processes. The selection of the preferred refractory treatment process is dependent

    Jan 1, 1990

  • SME
    Design And Operating Experiences With Flotation Columns In China

    By Guoming Liu, Weibai Hu

    The designing aspects of column profile, cross-section and height, types of aerator or air sparger, and feeding and discharging devices have been designed and tested. In operating aspects, the flotati

    Jan 1, 1988

  • SAIMM
    Design And Operating Features Of New 27.6 Mva Furnace At Nava Bharat Ventures Limited, Paloncha

    By Y. Poornachandra Rao, P. C. Sudhakar, L. Malakondaiah

    NBV commissioned a 27.6 MVA furnace in the year 2005. This paper explains: a)Furnace design features b)Furnace process control, Direct slag granulation c)Continuous casting, Waste heat reco

    Jan 1, 2007

  • SME
    Design and Operating Results of the Nitrox Process ®

    By Ken J. Fair, Vicken H. Aprahamian, Gus Van Weert

    A consortium of Canadian mining companies, engineering firms and the Ontario Government has supported Hydrochem's efforts in the last year to design and cost a 10 tpd NITROX PROCESS® demonstrati

    Jan 1, 1988

  • AUSIMM
    Design and Operation of a Counter Current Gas Scrubbing System

    For many years the scrubbing of roaster gas carrying sulphur dioxide has been carried out at the plant of the Electrolytic Zinc Co. of Australasia Ltd. at Risdon, Tasmania, using long horizontal tubes

    Jan 1, 1949

  • CIM
    Design and Operation of a Future Mill

    By D. E. Pickett, J. A. Roland Faucher

    "INTRODUCTIONMineral processing is undergoing growth and change at a rapid rate. The modern flotation process was discovered only in the mid-twenties, and uranium leaching in the mid-fifties. The grow

    Jan 1, 1979

  • IOM3
    Design and operation of a laboratory packed-bed reactor and its use to study the decomposition of calcium carbonate

    By A. Paulin, A. W. D. Hills

    The work has shown that packed-bed behaviour can be predicted from the results of single-particle experiments, total reaction times being predicted somewhat more accurately than gas and solid temperat

    Dec 1, 1971

  • SME
    Design And Operation Of A Microwave Pilot Plant For Calcining Refractory Gold Ores And Concentrates

    By P. Brooks, W. LaRochelle, J. M. Tranquilla

    EMR's recently commissioned Pilot Plant in Fredericton, N.B. Canada, the latest and largest in the company's sequence of prototype and demonstration systems, is being used as a process development fac

    Jan 1, 1998

  • SAIMM
    Design And Operation Of A New Flotation Cell: Ultimate Flotation.

    By Mark Craddock, Johan Swanepoel

    In this paper we present The Ultimate Flotation Cell, a newly developed flotation cell that is proving very popular in the industry. All flotation cells have only one purpose and that is the recovery

    Jan 1, 2007

  • TMS
    Design And Operation Of A Novel Gas Cooler For Refimet Copper Smelter, La Negra, Chile

    By Tim J. A. Smith

    Fundicion Refimet S.A. has operated a custom copper smelter at La Negra, near Antofagasta in northern Chile since 1993. From an initial operation based on Reverb smelting and Peirce-Smith, converting,

    Jan 1, 1998