Search Documents

Sort by

  • AUSIMM
    Upgrading the Gravity Circuit at Marvel Loch

    By W Newton, J Price

    This paper outlines the design, justification and performance of a gravity circuit upgrade at the Marvel Loch treatment plant. The design of the upgrade was simple but effective. The key components of

    Jan 1, 2000

  • CIM
    Upgrading The JK SAG Mill Model

    The original JKMRC AG/SAG mill model was developed over 30 years ago and has been upgraded a number of times since then, with the current published version being the Variable Rates model that is now o

    Jan 1, 2012

  • CIM
    Upgrading the JK SAG Mill Model (15def195-c5f3-4b60-8363-9a74a9d677d7)

    The original JKMRC AG/SAG mill model was developed over 30 years ago and has been upgraded a number of times since then, with the current published version being the Variable Rates model that is now o

    Jan 1, 2012

  • SAIMM
    Upgrading the stability of three masonry dams in different ways

    By W. Wittke, D. Schröder, H. Polczyk

    ABSTRACT: The Urft dam, the Diemel dam and the Eder dam are three old masonry damslocated in Germany. The paper describes the rehabilitation measures and the correspondingstability analyses carried ou

    Jan 1, 2003

  • DFI
    Uplift Capacity Of Drilled Piers In Clay - Synopsis

    By Braja M. Das

    Laboratory model test results for the ultimate uplift capacity of square and circular foundations in saturated clay (ø=0) have been presented. The results of the present model tests for square foundat

    Jan 1, 1987

  • DFI
    Uplift Micropile Load Transfer In Unsaturated Missoula Flood Deposits

    By John N. Cunningham

    Despite the wide use of micropiles for rehabilitating and retrofitting existing structures, little is known regarding the load-transfer distribution of grouted micropiles in various soil deposits. Th

    Jan 1, 2011

  • NIOSH
    Upper Body Joint Coordination Under Vibration - Introduction

    By Jueun Lee, Jong-Hwa Yoon, K. Rider, Bernard J. Martin

    Whole body vibration is known to affect movement accuracy [1], however little is known about changes in the organization of movement and movement strategies used to limit the influences of perturbatio

    Jan 6, 2006

  • NIOSH
    Upper Extremity Joint Moment and Force Predictions when using a Joystick Control

    By Dave P. Cooper, Tim D. Burgess, Dean H. Ambrose

    This paper discusses the application of digital human models (DHM) to examine computer generated forces necessary to move specific joysticks by using roof bolter virtual operators to predict the force

    Jan 1, 2007

  • SME
    Upper Rouge Combined Sewage Overflow Storage and Treatment Tunnel

    By F. J. Klingler, K. M. Swaffar, M. M. Rabbaig

    The Detroit Water and Sewerage Department has undertaken a $1.2 billion effort to capture and treat combined sewage overflows from various outfalls along the Detroit and Rouge Rivers in Detroit, Michi

    Jan 1, 1999

  • SME
    Upper Rouge Tunnel CSO Control

    By Wern-ping Chen, Jean Habimana, Jinyuan Liu, Mirza M. Rabbaig, Robert Barbour

    To mitigate and control the combined sewer overflows from 17 outfalls in the City of Detroit, three outfalls in Dearborn Heights and eight outfalls in Redford Township, the Detroit Water and Sewerage

    Jan 1, 2007

  • AUSIMM
    Upper Waimangaroa Northern Opencast Mine: An Overview

    The Upper Waimangaroa mining permit is part of the Buller Coalfield and lies on the eastern side of the Stockton-Denniston Plateau. The mining permit area is estimated to contain a total in-ground coa

    Jan 1, 1998

  • CIM
    Uppers and Wagon Drills 1n Cut-and-Fill Stoping

    By Ray Holmes

    This paper describes one approach in our search for greater stope efficiency and lower costs. The uppers technique with wagon drills in cut-and-fill stopes was commenced, on an experimental basis, in

    Jan 1, 1965

  • CIM
    Uppers drilling for mechanized cut-and-fill stoping at Brunswick Mining and Smelting No. 12 Mine

    By R. W. Baker

    "The development of uppers drilling at Brunswick Mining is reviewed. This paper describes design criteria for drilling patterns and the research required for selection of a suitable drill jumbo. The s

    Jan 1, 1988

  • SME
    Ups and Downs of Downsizing

    By George Weinman

    GEORGE WEINMAN: Our first group leader for the discussion, "Ups and Downs of Downsizing," wishes to remain anonymous. ANONYMOUS PRESENTER: When George and Jamie asked me to do this, I thought a wh

    Jan 1, 1998

  • SME
    Upscaled Mining Talent With Advanced Analytics - SME Annual Meeting 2023

    By M. Sandin

    According to the world bank1, the mining industry consumes up to 11 percent of global energy use. In comparison, 70 percent of mining projects from the six largest mining companies operate in water-st

    Feb 1, 2023

  • IMMS
    Upscaling towards Deep-Sea Mining by Vertical Transport Experiments over 130 meter.

    By S. C. W. de Jong, E. de Hoog, J. M. van Wijk, S. J. Dasselaar

    Introduction Technology development for sustainable, safe, reliable and efficient mining of polymetallic nodules in the deep seas requires careful design, thorough understanding and integrated testing

    Jan 1, 2018

  • CIM
    Upsets on Antimony Content in Electrolytic Copper Produced at Caraiba Metais

    By I. M. Santos Moraes

    The control of minor impurities (mainly As, Sb and Bi) in copper refineries has been a great challenge. Caraiba Metais' copper refinery produces a very high quality copper, registered in LME as g

    Jan 1, 2007

  • SME
    Upside Down Concrete Accelerates Large Tunnel Project

    By George Joseph Malina

    Contractor chose and Owner allowed concrete to be placed using the arch first principle while excavating the 35'-3" O.D. rock tunnel. The contract included excavating and lining 26,000 L.F. of ro

    Jan 1, 1981

  • AUSIMM
    Upstream Raising of Laterite Nickel Tailings Storage Facilities

    By D A. Williams, J C. J Boshoff

    The properties of tailings that emanate from laterite nickel processing plants are significantly different to most other mine tailings. They typically comprise a mixture of fine materials that are mad

    Jul 27, 2015

  • AUSIMM
    Upstream Raising of Tailings Dams - Engineered Structures of Castles in the Air?

    By Williams P. A

    Tailings dams constructed by the upstream method have traditionally been built using the sand fraction of the tailings, which has automatically provided a relatively permeable embankment material, and

    Jan 1, 1992