Search Documents

Sort by

  • AUSIMM
    Risk Management Through Design - Experiences from the United Kingdom Tunnelling Industry

    A formalised approach to risk management has been regulated in the United Kingdom (UK) since the Construction (Design and Management) Regulations 1994 (CDM) came into force in 1995. These regulations

    Jan 1, 2008

  • AUSIMM
    A Variable Split Sample Divider - A New Tool for Sample Preparation

    By R Simonato

    It is now recognised that rotary sample division is by far the best laboratory tool for extracting subsamples from a lot of material. In terms of sampling theory, rotary division, by virtue of the fac

    Jan 1, 2008

  • AUSIMM
    Process Mineralogy and Applications in Process Design and Optimisation

    Process mineralogy is an inter-discipline in the fields of mineralogy and mineral processing. As a predicting and trouble-shooting tool, process mineralogy helps address all mineralogical issues and p

    Jan 1, 2008

  • AUSIMM
    Beneficiation of Nickel Laterites for HPAL Processing

    Nickel laterite HPAL circuits are known for their complexity and have presented a large number of challenges to process engineers worldwide. An attitude commonly encountered by the author is that the

    Jan 1, 2008

  • AUSIMM
    Return to Hillgrove

    By C Dell

    Hillgrove, situated on the New England plateau of New South Wales, is an area rich in history and resources. Key resources are predominantly antimony, gold and scheelite and the area surrounding the h

    Jan 1, 2008

  • SME
    Dysfunction Junction: When Inalterable Rules Meet Evolving Technology

    By Mark N. Savit

    It is indeed a rarity for a non-engineer, let alone a lawyer, to even be considered for a mining-related award, especially where that award is for significant contributions to technical progress in th

    Jan 1, 2008

  • CIM
    Advanced Control for Mineral Processing: Better Than Expert Systems

    By Robert K. Jonas

    "Minerals processors can improve production by using the best available control technology to control their operations. Many mines use expert systems that can provide improved results over manual or b

    Jan 1, 2008

  • CIM
    Critical hydraulic pressure forecasting of water inrush in coal seam floors based on a genetic algorithm-neural network

    By T. Liu, C. Shi, T. Fu, M. Zhong

    Water inrush in coal mines is induced by the imbalance of the groundwater flow field and the engineering geo-mechanics field. Therefore, to prevent water inrush it is important to predict the critical

    Jan 1, 2008

  • CIM
    Ausmelt Technology; Developments in Lead And Zinc Processing

    By R. Matusewicz, A. Kaye

    Ausmelt Top Submerged Lancing (TSL) Technology has gained widespread commercial acceptance in non-ferrous applications, including the processing of lead and zinc primary concentrates and secondary (po

    Jan 1, 2008

  • AUSIMM
    The Role of the Metallurgist in Project Development

    The role of a project metallurgist is diverse and covers input into the resource definition, mining studies, metallurgical test program development, process engineering and plant design, cost estimate

    Jan 1, 2008

  • NIOSH
    The Status of Mine Fire Research in the United States

    By M. A. Trevits

    During the time period from 1990-2007, 1601 reportable fires occurred in the U.S. mining industry (an average of 89 fires per year). The leading causes of U.S. mine fires were flame cutting and weldin

    Jan 1, 2008

  • NIOSH
    Monitoring and removal of CO in blasting operations

    By Marcia L. Harris

    Toxic fumes produced by detonating explosives in surface mining and construction operations pose potential hazards to workers and the public. Blasting operations produce both toxic and nontoxic gaseou

    Jan 1, 2008

  • TMS
    The Integrated Management of Textile Waste - A Strategic Tendency for Developing a Sustainable Textile Industry in Romania

    By Emilia Visileanu, Eftalea Carpus

    "Due to the demographic explosion and development without precedent of the consumer society, the capacity to destroy the ecological balance the entire planet life depends on, acquire new dimensions. I

    Jan 1, 2008

  • SME
    Surface and Hybrid Mining: Aqueous Extraction Methods

    By W. J. Schitt

    Section 15 covers a loose collection of topics that involve water in some way. The chapters in this section include Dredge and Placer Mining (Chapter 15.1), Solution Mining: Surface Techniques (Chapte

    Jan 1, 2008

  • AUSIMM
    Wallaby - The Horizontally Challenged Opportunity

    Barrick Gold Granny Smith Mine is currently undergoing conversion from an open cut operation to an underground mine at the Wallaby deposit. The underground project commenced in 2005 with the developme

    Jan 1, 2008

  • SME
    Underground Mining: Supported Methods

    By Fred W. Brackebush

    In underground stopes that require more than minimal support, backfill is almost universally used. The term cut and fill stopingis used in a broad sense in this section, which describes underground mi

    Jan 1, 2008

  • AUSIMM
    Automated Loading and Hauling Experiences at De Beers Finsch Mine

    By R Grobler, D Burger, L Alberts

    The current climate in the mining industry is allowing mining companies to further broaden their views and investigate technologies to improve the safety, efficiency and cost-effectiveness of their op

    Jan 1, 2008

  • SAIMM
    Double-header trains at Great Noligwa mine - Synopsis

    By L. van Dyk

    The project was aimed at evaluating the double-header trains implemented at Great Noligwa mine, looking at the changes from the old conventional trains to the new trains, and identifying possible impr

    Jan 1, 2008

  • AUSIMM
    Development and Implementation of the Garford Dynamic Bolt at the Kanowna Belle Mine

    By R Lachenicht, J Player, A Thompson, E Villaescusa

    Kanowna Belle Gold Mine is a deep, high-stress, sublevel open stoping mine located near Kalgoorlie. Seismic activity during the development cycle presented problems, including concerns regarding the e

    Jan 1, 2008

  • AUSIMM
    Drift and Fill - The High Value, High Recovery Mining System

    By M English, M Yumlu

    At times of high metal prices, mining projects that have previously been put into the ætoo hard basketÆ are now being more closely examined. Typically these projects include the potential recovery of

    Jan 1, 2008