Search Documents

Sort by

  • CIM
    Estimation and Reporting of Mineral Resources for Coarse Gold-bearing Veins

    By Simon C. Dominy, Ian M. Platten, Garry F. Johansen, Alwyn E. Annels, Brian W. Cuffley

    Abstract - Coarse gold-bearing veins are characterized by high grades that are localized and erratic. Effective sampling of coarse gold-bearing veins is difficult because of the low concentration and

    Jan 1, 2000

  • AUSIMM
    The Expanding Role of Mine Geophysics

    Just as geophysics, in the form of 3D seismic and wireline logging, plays a key role in petroleum reservoir management, so too will geophysics play an important role in mining of coal, metals, and min

    Jan 1, 2000

  • CIM
    The effect of acidity ’at temperature’ on the morphology of precipitates and scale during sulphuric acid pressure leaching of laterites

    By D. H. Rubisov, V. G. Papangelakis

    Sulphuric acid pressure leaching is the process of choice to recover nickel and cobalt from laterites with variable iron and magnesium contents. The latter influences the acidity levels required for e

    Jan 1, 2000

  • CIM
    Toward a unified and digital communication system for underground mines

    By P. -M. Tardif, S. Outalha, R. Le

    "This paper proposes a new direction to implement an underground mine communication system. It presents actual underground communication systems and discusses their technological limits. A new system

    Jan 1, 2000

  • AUSIMM
    Intelligent Mine Technology Program and its Implementation

    By P SSrkkS

    Mining is commonly seen as a typical basic industry with rough and even dangerous working conditions, heavy environmental load, and a low level of high-technology and automation with much manual work

    Jan 1, 2000

  • AUSIMM
    The Mine Management System at Olympic Dam Mine

    The operations management system at Olympic Dam has evolved over a two-year period to the state described in this paper. This evolution has been driven largely by the requirements of the recent expans

    Jan 1, 2000

  • AUSIMM
    The Evolution of Sublevel Caving at Trojan Mine, Bindura, Zimbabwe

    By R Chinamatira

    Several technical and economic factors have to be taken into consideration in developing an optimal mining method. This paper describes some of the important factors learnt during the evolution of the

    Jan 1, 2000

  • AUSIMM
    Systems and Protocols of Geological Information Management at Telfer Gold Mine, Western Australia

    By G R. Howard, G Back

    Management of information systems for data collection is essential to maintain data integrity and continuity, and manage loss control on a large world-class mine such as Telfer Gold Mine. This paper a

    Jan 1, 2000

  • ISEE
    AEL Ring 2000

    While ring-blasting techniques offer substantial benefits, there are intrinsic problems that are exacerbated when large blocks of ore are mined in attempts to improve the production economics. These p

    Jan 1, 2000

  • TMS
    Zimaval (Zinc Manganese Valorization) Technology for Recycling of Batteries and Other Complex Zinc Bearing Materials

    By S. Ferlay

    "The main purpose of the ZIMA VAL project (Label EUREKA EU1367 and LIFE ENV/F/000278) is to demonstrate industrial scale recovery and recycling of the main components of used dry batteries (zinc, mang

    Jan 1, 2000

  • TMS
    Pressure Leaching of Copper Refinery Slimes

    By Bradford C. Wesstrom

    The extraction of metals from Copper Refinery Slimes may involve many different processes. This paper describes the use of pressure leaching for decopperizing of copper refinery slimes at the El Paso

    Jan 1, 2000

  • AUSIMM
    Challenges for High Pressure Grinding in the New Millennium

    By J Knecht, R Klymowsky, E Burchardt

    The wide spread introduction of SAG mills into grinding circuits 20 years ago was the last development which had a major impact on the design and economics of comminution circuits. Single SAG mills we

    Jan 1, 2000

  • AUSIMM
    Estimation of Resources and Conversion to Reserves ù Protocols for the Assessment, Reduction and Management of Risk

    By G Ferguson a, P Carrasco, P P. A Dowd

    International codes of practice offer broad definitions with respect to the classification of resources in terms of risk. Specific guidelines and protocols, to analyse sample data, carry out geostatis

    Jan 1, 2000

  • SME
    Upgraded Coal: Enhancing The Coal-Fired Power Option

    By E. Hughes, D. Akers, D. Stopek

    The Upgraded Coal Interest Group (UCIG), focuses on clean, low-cost options for coal-based power generation via pre-combustion, co-firing and reburn options. Its mission is to preserve and expand the

    Jan 1, 2000

  • CIM
    Earning a social licence to operate: Social acceptability and resource development in Latin America

    "IntroductionIn the 1970s, environmental concerns and associated liabilities were a new and unknown aspect of corporate risk. Today, social concerns and the associated conflicts that they can generate

    Jan 1, 2000

  • TMS
    Determination of Trace Arsenic (III), Arsenic (V), Antimony (III), Antimony (V) in Drain by ICP equipped with Hydridegeneration System

    By Hiroshi Ono

    "By newly developed ICP method, trace amounts of As(III), As(V) .,Sb(III) and Sb(V) were precisely determined within accuracy of sub ng/ml. As(III) and Sb(III) were separated from As(V) and Sb(V) by e

    Jan 1, 2000

  • SME
    Project Management For Dummies, Or “How To Improve Your Project Success Ratio In the New Millenium”

    By R. J. Hickson

    From 1993 through 1999 Cyprus Amax Minerals Company successfully completed eight major construction projects around the world. Six greenfield mines were brought into production, an ongoing operation w

    Jan 1, 2000

  • SME
    Determination Of Components Of Paste Backfill And Its Economic

    By G. Brackebusch, S. J. Jung

    Backfilling techniques are widely used in large-scale underground mines. Massive pillars, which have been left in place for stability, limit mining activity. Backfilling allows safe recovery of the

    Jan 1, 2000

  • AUSIMM
    George Fisher Mine - Feasibility and Construction

    By G S. B Karunatillake

    Following a pre-feasibility study, Mount Isa Mines commenced a feasibility study on the deposit of the George Fisher Mine in May 1997. Board approval was granted in May 1998 to construct a 2.5 million

    Jan 1, 2000

  • CIM
    Aur Resources Inc. - Louvicourt Mine

    By Michel Rodrigue, Sylvain Duchesne, Louis Racine

    "LocationThe Louvicourt mine is located 20 km east of Val d'Or in Abitibi, in the northwest part of the province of Quebec. The mine is located on Highway 117 connecting Val d'Or to Montreal and very

    Jan 1, 2000