    Kennecott-Outokumpu Flash-Converting Process Copper By Clean Technology

    By Pekka Hanniala

    The Outokumpu Flash Smelting process today is the most feasible method for copper matte smelting. The economic feasibility of the process has always been one of the main decision making criteria in sm

    Jan 1, 1998

  • TMS
    Process Improvements At The Phelps Dodge Chino Smelter

    By M. J. King

    The Chino Smelter embarked on a program to reduce smelter emissions. Fugitive sulfur dioxide and particulate emissions were reduced by (i) removing the flash furnace settling chamber and (ii) installi

    Jan 1, 1998

  • SME
    Evaluation Of The Face Ventilation Systems For Extended Cuts With Remotely Operated Mining Machines Using Three-Dimensional Numerical Simulations

    The purpose of this paper is to demonstrate how the Computational Fluid Dynamics (CFD) technique can be an attractive approach to evaluate the performance of face ventilation systems. To present the c

    Jan 1, 1998

  • TMS
    Hydrogen Microprint Technique Applied to Observe Impurity Hydrogen in Aluminum during Deformation

    By Akihide Nagao

    The behavior of impurity hydrogen that is contained in starting material or picked up during processing has been little investigated up to now. The hydrogen microprint technique is applied to determin

    Jan 1, 1998

  • TMS
    Cyanide Leaching, Interrupted

    By Dan A. Mackie

    Cyanide leaching operations have taken a beating from the press and the public at large for its seemingly haphazard approach to control of cyanide solutions and containment of tailings. Major spills i

    Jan 1, 1998

  • CIM
    Methodology for developing a stakeholder-based external affairs strategy

    By K. L. Azinger

    Successful relationships between mining companies and local stakeholders are now an essential part of the social contract of “doing business” (Prescott, 1995). The methodology presented in this paper

    Jan 1, 1998

  • CIM
    Medium voltage switchgear and circuit breaker life extension

    By K. J. Boser

    "Medium Voltage (MV) metal clad switchgear is referred to as the voltage class from 2.4 kV to 38 kV. Technological advances in circuit breaker designs over the last 20 years have given rise to retrofi

    Jan 1, 1998

  • NIOSH
    Psychophysical Strength - Theory And Description Of The Psychophysical Methodology

    According to contemporary psychophysical theory, the relationship between the strength of a perceived sensation (S) and the intensity of a physical stimulus (1) is best expressed by a power relationsh

    Jan 1, 1998

  • TMS
    Remediation of AMD. The Green Precipitate Process

    By R. M. Taylor

    Lime addition to acid mine drainage (AMD) leads to precipitation, predominantly of metal hydroxides and calcium sulfate, and is the benchmark for remediation by precipitation. Geo2 Limited of Melbourn

    Jan 1, 1998

  • SME
    Use Of Probability Distributions To Define Baseline Ground Water Quality At A Uranium Mill Site

    By K. J. Bruxvoort

    Background ground water quality is often used to drive remediation programs at sites with waters affected by mining activities. In the past these levels were sometimes chosen without rigorous statisti

    Jan 1, 1998

  • AUSIMM
    Recent Developments and Trends in Backfill Practices in Canada

    Planning of modern mines entails considerable challenges in the areas of ground control, materials handling, safety, environment, equipment and personnel. Many orebodies are not economical unless effi

    Jan 1, 1998

  • AUSIMM
    Integration of a Microseismic Monitoring System in Mining the Pasminco Broken Hill Southern Cross Area

    By K P. Tully

    In August 1996 a Microseismic Monitoring System developed by ISS International Limited was installed at the Pasminco Broken Hill Mine -Southern Cross area. The project aims were to:Assist in daily saf

    Jan 1, 1998

  • AUSIMM
    The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount Isa (ee90997b-915a-4723-962c-df13e11cf8b6)

    By Kuganathan K, Potvin Y

    Enterprise Mine at Mount Isa is to expand ore production from the current 1.4 to 3.5 mtpa by mining the 3500 Orebody, from which production is scheduled to start in February 1998 making this the dee

    Jan 1, 1998

  • AUSIMM
    Remote Mining in the Canadian Arctic - The Falconbridge Limited Raglan Experience

    In February 1995, Falconbridge Limited approved the construction of a nickel mining and milling facility on its Raglan property situated in the Nunavik region of northern Quebec, Canada. The construct

    Jan 1, 1998

  • SME
    Further Studies On Relating The Breakage Properties Of Coal Bore Cores To Preparation Plant Feed (782c3ebc-fc62-4978-be90-da405354173d)

    By T. E. Wilson

    An exploration bore core sample of coal ought to be reduced from its original cylindrical form to a particle size distribution and particle composition that reflects, insofar as possible, a process st

    Jan 1, 1998

  • TMS
    Computational Simulations and Experimental Validation of a Furnace Brazing Process

    By F. Michael Hosking

    Modeling of a furnace brazing process is described. The computational tools predict the thermal response of loaded hardware in a hydrogen brazing furnace to programmed furnace profiles. Experiments we

    Jan 1, 1998

  • CIM
    IOCC Using Expert System to Meet Production and Quality Control Goals

    By Paul Delottinville, Maynard Hall, Henry Hillier

    "An expert system application for supervisory control and optimization of the indurating process at the Iron Ore Company of Canada (IOCC) has been developed and installed in closed-loop. Prior to the

    Jan 1, 1998

  • AUSIMM
    Getting Value From R&D

    New knowledge has no economic value unless it can be applied, or æcapturedÆ, as the R&D jargon has it. Australia probably spends more than $500 m per year on mineral industry R&D, distributed amongst

    Jan 1, 1998

  • AUSIMM
    Waihi Gold - Extended Project

    By M Maguire

    The purpose of this paper is to provide an illustration of the Resource Management Act processes at their best. Many of you will be aware of the Martha Mine situated in the middle of Waihi Township in

    Jan 1, 1998

  • TMS
    Process Considerations Before And After Failure Of The Omai Tailings Dam, August 19 To 24,1995

    By Robert R. Beebe

    On the night of August 1'9-20, 1995, seepage was seen at the toe of the Omai tailings dam in Guyana. The mill was immediately shut down, and within two hours the flow, then mostly water, was dive

    Jan 1, 1998