Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The start-up and operation of the Gibraltar Mines SX-EW PlantBy J. C. O'Rourke
"Gibraltar Mines Ltd. has been operating its open pit copper mine for fifteen years. In that time, over 140 million tons of waste and low-grade material has been placed on the mine waste dumps. Labora
Jan 1, 1988
-
Knowledge Based Control of Materials Processing: Challenges and Opportunities for the Third MillenniumBy Alex Meystel, Diran Apelian
"In this paper, an outline is given for a theory of intelligent control (IC) of manufacturing processes (MP) based upon what all of them have in common: all MP's can be represented as distributed netw
Jan 1, 1988
-
Development of Explosive Monitoring Techniques for Use in Quality Control and Production Blast AnalysisBy Moxon NT, Torrace AC
The detonation pressure of an explosive is a function of its density and its velocity of detonation (VOD) and relates directly to the degree and manner in which the explosive loads the surrounding r
Jan 1, 1988
-
Window of Opportunity in Research and DevelopmentAn on-stream iron ore analyser has been developed in collaboration with Hamersley Iron Pty. Limited for determining the iron content of both lump (- 30 + 6 mm particle size) and fines (- 6 mm partic
Jan 1, 1988
-
Nickel/Mica Filled Plastics For Electromagnetic Interference ShieldingBy K. Hajmrle
The production of nickel coated mica composite powder by hydrogen reduction of a nickel ammine sulphate solution, followed by the production of molded plastic samples containing Ni/Mica is described.
Jan 1, 1988
-
The Field Evalution of Explosives PerformanceBy Cameron A
In recent years there have been significant developments in the tech- nology available for blast monitoring, analysis and simulation. Progress in these areas has been achieved through research conduc
Jan 1, 1988
-
Accounts for the year ended 30th June, 1988Balance Sheet at 30 June 1988 ACCUMULATED FUNDS Balance at 30 June 1987. Excess of income over expenditure for the year ended 30 June 1988
Jan 1, 1988
-
OFR-28-88 Potentially Critical MaterialsBy Russell J. Foster
In this Bureau of Mines report a selection process has identified 14 nonstockpiled materials (cesium, gallium, hafnium, indium, osmium, rhenium, rhodium, rubidium, ruthenium, scandium, selenium, tellu
Jan 1, 1988
-
Aluminum mine shaft conveyances at Inco Ltd. an overview of problems encountered and solutionsBy Richard Mcivor, Largo Albert
"Inco Limited has operated aluminum mine shaft conveyances since 1968. Aluminum conveyances are used where the hoisting in system requires lightweight conveyances to maintain the hoist rope safety fac
Jan 1, 1988
-
Prediction of Solute Transport from Gold Mine Wastes, Coromandel, New ZealandThis paper describes a case history of using an integrated geochemical and hydrogeological approach to predicting solute transport from gold mine tailings in highly fractured volcanic terrain. Two m
Jan 1, 1988
-
Controlled Recirculation: Longwall Coalface Working District Climatic PredictionBy Tuck M. A
The increasing depth, mechanisation and distance of working areas from surface connections places an ever greater contaminant burden on ventilation airflows. Some British Coal mines are already exp
Jan 1, 1988
-
Underground Mining Operations at The Selwyn ProjectSince the 1950's drilling has been rapidly mechanised. First from hand held drills with air legs to pneumatic jumbos, then to more effective hydraulic jumbos. Development of underground drill
Jan 1, 1988
-
Special Features Of WIPP Underground Ventilation SystemBy S. C. Sethi
The paper presents an analysis and discussion of the underground ventilation system at the waste Isolation Pilot Plant (WIPP), with particular emphasis on specific repository-related requirements and
Jan 1, 1988
-
Characterization Of Chain Pillar Stability In A Deep Western Coal Mine -Case StudyBy M. J. DeMarco
Beginning in late 1985 and continuing through 1987, Bureau of Mines personnel investigated longwall chain pillar and entry design in two-and three-entry gate-road systems at a deep underground coal mi
Jan 1, 1988
-
Criteria for Safe Mining under the Surface Water Accumulations in Velenje Lignite MineBy Ribicic M, Kocar F
Surface lakes or water accumulation present a possible threat for the flooding of the underground mining works. Therefore, the criteria that define the conditions under which no flooding of the mini
Jan 1, 1988
-
Mining And Quarrying Trends In The Metals And Industrial Minerals IndustriesBy Arnold O. Tanner
Tables based on 1985 data, which were not available in time for publication of the "1985 Minerals Yearbook," are included in this chapter; corresponding tables for 1986 are not yet available. Raw nonf
Jan 1, 1988
-
Failure and repair of a mine hoist drumshaftBy James E. Rider
"Fractures in mine hoist drumshafts are rare. We know of no previously reported attempts to repair a fractured drumshaft; any feasible method would involve welding and the associated problems of disto
Jan 1, 1988
-
Innovative Gold Dual Dredge Allows Simultaneous Overburden Removal and Mineral RecoveryBy Wayne F. Crockett, Martin H. Col
Gold, as a precious metal, has been sought for several thousand years. During this time economics have generally determined whether or not a deposit is minable. Today, few would spend $500.00 or $1,00
Jan 1, 1988
-
Managing Heap Leach Solution Storage RequirementsBy Scott E. Broughton, Robert T. Tape
Heap leaching requires containment and storage of cyanide solutions, the volume of which may increase dramatically following an extreme storm event or extended wet periods. This paper describes a comp
Jan 1, 1988
-
Measurement of Coal Dust and Diesel Exhaust Aerosols in Underground MinesBy K. L. Rubow
"Diesel exhaust and mineral dust concentrations have been measured for aerosols generated in the laboratory and as found in five underground coal mines- 3 utiliting diesel-powered hallage equipment an
Jan 1, 1988