Search Documents

Sort by

  • CIM
    Achieving Reliability from Data at Cerrejón Coal

    By Gerardo Vargas

    Without an adequate data sample there can be no Reliability Analysis (RA). Without analysis there can be no systematic, verifiable improvement in reliability or in operational economy. A sample is a c

    May 1, 2011

  • CIM
    Enabling Advanced Energy Management Practice for Minerals Operations

    By Dean L. Millar

    Measures taken by mining companies around the world to reduce their carbon footprints are becoming increasingly important in the sector securing its social licence to operate. The options for measures

    May 1, 2011

  • CIM
    The use of a Wiki format to Compile Mine Design Knowledge What?s in it for YOU??

    By Glenn D. Lyle

    As part of an initiative to improve value in mining, CEMI is developing a handbook on best practice in mine design. Various formats were examined, and of these, the wiki was selected as being most sui

    May 1, 2011

  • CIM
    Modified Stability Graph Method with a new Rock Stress Factor

    The Stability Graph Method is widely used in Canadian underground hard rock mines for open stope support design and is frequently used in the mine planning phase to assess the viability of stope geome

    May 1, 2011

  • CIM
    Underground Mega Mass Blasting with Electronic Initiation Near Urban Area

    By Jean-François Lagueux

    Goldex Mine is an underground mine located near the town of Val-d?Or. Multiple innovations were required to work the mine. Due to its low grade, it was important to develop a bulk mining method to eco

    May 1, 2011

  • SME
    Cable Bolting For Pillar Recovery At The Magmont Mine

    By S. R. Dismuke

    Ore at the Magmont Mine in southeast Missouri is extracted by the room and pillar method on two and sometimes three horizons. In 1991, an innovative plan was formulated for recovery of high grade ore

    Apr 13, 2011

  • AUSIMM
    Benefits of Advanced Technology in Underground Mining

    By M Edhammer

    In 2007, Atlas Copco introduced an integrated tunnel scanner/profiler. The tunnel scanner, which is integrated into the control system, is mounted on the drill rigs, and replaces the previous variants

    Mar 21, 2011

  • AUSIMM
    The Status of Implementation of Proximity Detection Systems in Underground Mines

    By D Kent

    The introduction of digital technologies into the underground mining industry, in both coal and hard rock mining, has enabled many high bandwidth applications to be adopted by mines.Digital networks b

    Mar 21, 2011

  • AUSIMM
    A Comparison of Skip Loading Systems from an Operational, Maintenance, Safety and Capital Cost Estimate Perspective

    By A E. A Northcote

    The drive to maximise performance, reduce maintenance times, improve safety of operation and maintenance on mining equipment while keeping both operational and capital costs down has provided good nou

    Mar 21, 2011

  • AUSIMM
    Case Study Comparison of Teleremote and Autonomous Assist Underground Loader Technology at the Kanowna Belle Mine

    By G B. Smith

    Barrick (Australia Pacific) Limited initiated a trial of Caterpillar’s Minegem autonomous loader technology in 2009 at the Kanowna Belle mine in Kalgoorlie. Autonomous loader technology offers the pot

    Mar 21, 2011

  • AUSIMM
    Implementing and Improving the Mine Plan at the Mt Wright Project

    By D MacKay

    The Mt Wright Project is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. Underground Development of

    Mar 21, 2011

  • AUSIMM
    Fine-Tuning Raise Bore Stability Assessments and Risk

    By W A. Peck

    Raise boring is the preferred option for constructing ventilation shafts in Australia. The trend has been towards larger diameters and longer single-pass shafts, and if at all possible, reaming throug

    Mar 21, 2011

  • AUSIMM
    Improved Technology – Selection of a Suitable Underground Concrete Transport Vehicle

    By S Mitchell

    Jetcrete Australia Pty Ltd, shotcrete contractor took the initiative in 2008 to discontinue the use of ‘road registerable’ concrete trucks for all underground works in Australia and internationally.Th

    Mar 21, 2011

  • AUSIMM
    Mining at the Redross and Mariners Nickel Mines

    By D Will

    RedrossThe Redross orebody averages 1 m wide, has a strike of 50 - 350 m, dips at 55° and has a basalt footwall and an ultramafic hanging wall. The most successful and innovative aspects of mining Red

    Mar 21, 2011

  • AUSIMM
    Simulation Aided Engineering – Integration of Monitoring, Modelling and Planning

    By D Beck

    Open access to forecasts of mine geotechnical performance in the form of open databases of model results has been considered risky in the past, with a concern that the results will not be understood o

    Mar 21, 2011

  • AUSIMM
    Resue Mining with eDev™ Electronic Detonators at Stawell Gold Mines

    By C Hamilton

    Stawell Gold Mines (SGM) is an underground mining operation located in Victoria, Australia. The mining method employed is long hole retreat stoping, utilising up and downholes and artificial concrete

    Mar 21, 2011

  • AUSIMM
    What Have we Learnt About Managing Rock Burst Risks?

    By Y Potvin

    Underground mines in Australia are progressively operating at greater depth, sometimes in conditions where mine induced stresses are very high. In such conditions, the seismic activity often becomes i

    Mar 21, 2011

  • AUSIMM
    Brisbane Airport Link Earth Pressure Balance Machine Two Component Tailskin Grouting – A New Australian Record

    By A Reschke

    The Thiess John Holland Group is undertaking the design and construction of Brisbane’s Airport Link Project, the largest single investment in transportation infrastructure in Australian history. Twin

    Mar 8, 2011

  • AUSIMM
    State-of-the-Art in Tunnel Ventilation Systems Design – Applicable Options to Meet Fire-Life-Safety Code Requirements

    By P C. Miclea

    Transportation networks extend every day around the world, requiring safe and well-maintained structures for efficiency and for users’ safety. Due to specific features of the infrastructure, such as l

    Mar 8, 2011

  • AUSIMM
    A Review of Prediction Methods for Ground-Borne Noise Due to Tunnel Construction Activities

    By D Davis

    The prediction of ground-borne noise levels from tunnel construction activities requires knowledge of the input vibration forces from the vibration source(s) into the cutting face, knowledge of the vi

    Mar 8, 2011