Search Documents

Sort by

  • DFI
    Rehabilitation of U.S. 70 Bridge over Lake Hamilton

    By Ryan P. Sullivan, G. Alan Klevens, Jian Huang

    "BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91

    Jan 1, 2007

  • SAIMM
    Comparison Of Operator Line-Of-Sight (LOS) Assessment Techniques: Evaluation Of An Underground Load-Haul-Dump (LHD) Mobile Mining Vehicle

    By J. West

    For many years line-of-sight (LOS) issues for underground mobile equipment is a growing focus of research. This research is a result of the numerous fatalities and injuries which occur in the mining i

    Jan 1, 2007

  • AUSIMM
    Operating Variables Affecting the Bubble Size in Forced-Air Mechanical Flotation Machines

    By C O. Gomez

    The bubble size, together with the gas rate, determines the bubble surface area flux in flotation machines and, therefore, impacts directly on the kinetics of flotation. Understanding the variables th

    Jan 1, 2007

  • SME
    Evaluation of Geological Conditions Ahead of TBM Using Seismic Reflector Tracing and TBM Driving Data

    By Descour Jozef, Suguru Shirasagi, Takuji Yamamoto, Koji Murakami

    For TBM tunneling no visual inspection of excavated ground is possible. This may hinder the high-speed excavation, particularly in complex ground conditions. The TBM Excavation Control System was deve

    Jan 1, 2007

  • CIM
    Review of High Pressure Tuyere Injection

    By A. E. M. Warner, I. E. Hills, C. L. Harris

    Since the late Dr. Keith Brimacombe, et al, performed tests at the now-closed Asarco Tacoma smelter and the Inco Copper Cliff Smelter on Peirce-Smith copper converters almost thirty years ago, many Py

    Jan 1, 2007

  • AUSIMM
    Sustainable Mineral Resource Management Systems - Delivering Resource Growth Within Sarbanes-Oxley Requirements at Gold Fields Ghana, Abosso Goldfields Ltd, Damang Mine (AGL)

    By M Brewster

    Goldfields Abosso Goldfields Limited (AGL) is a Ghanaian registered company that owns and operates the Damang Gold Mine. Gold Fields Ghana Holdings Limited holds a 71.1 per cent interest in AGL. The D

    Jan 1, 2007

  • CIM
    Robotic Applications In Mining Process; A Small Investment And Great Profits In The Short Term

    By H. Salamanca

    Recently, the mining industry has become one of the leading target markets for the technology industry as they need to innovate in their productive processes in order to boost productivity, reduce ope

    Jan 1, 2007

  • SME-ICGCM
    Towards an Improved Stone Mine Pillar Design Methodology: Observations from a Mistake

    By Francis Kendorski

    The mining engineering design professional has limited practical and reliable tools for planning successful room-and-pillar stone mines using readily-available and collectible information. Three tech

    Jan 1, 2007

  • CIM
    Tuyere Pressure Frequency Measurements In A Peirce Smith Converter

    By M. Kreuh

    An investigation of the pressure pulse spectrum generated by the gas dispersion processes in a Peirce Smith copper converter was undertaken via the simultaneous measurement of four tuyeres using high

    Jan 1, 2007

  • CIM
    Transforming Flash Furnace Feed and Burner Stability: Optimizing Furnace Performance and Productivity

    By P. E. Walker, M. E. Reed, R. C. Sims, B. Snowdon, D. E. Fallas

    An advanced Flash Furnace feed system is the key to improving furnace performance. Clyde-WorleyParsons has developed a revolutionary pulseless pneumatic injection feed system technology, capable of de

    Jan 1, 2007

  • CIM
    Using Lca To Support Decision-Making And Sustainable Plant Design In Primary Copper Production

    By M. H. Ali

    Codelco, a multi-process primary copper producer, is undertaking a full life cycle inventory (LCI) of all its commercial products based on copper and molybdenum. During this work, many questions have

    Jan 1, 2007

  • SME
    Equipment Reliability: An Indicator For Sustainable Development In Mining

    By N. Vayenas

    Modern mines possess a wide variety of capital intensive equipment. Equipment failures and the associated down time contribute significantly to the overall maintenance, operating and production costs

    Jan 1, 2007

  • CIM
    The Copper-Cobre Series of Conferences: A Prime Forum for Active Discussion of Copper Smelting Technology Practice and Innovation

    By C. M. Diaz, P. J. Mackey

    Since its inception, in 1987, the Copper-Cobre series of conferences has established itself as the prime world forum for discussing advances in copper process metallurgy, in particular copper sulfide

    Jan 1, 2007

  • CIM
    An Innovative Wireless Electrolytic Cell Monitorpowered By Ultra-Low Bus Voltage

    By E. You

    Kennecott Utah Copper Refinery and Outokumpu Technology have developed a wireless Electrolytic Cell Monitor (CellSensor) system to monitor cell voltage and temperature. The system is based on a robust

    Jan 1, 2007

  • AUSIMM
    Project-Finance Risks ù Due Diligence Matters

    Project-finance risk assessment is mature and approached systematically. Mining industry due diligence remains fragmented with specialists addressing different aspects of the project such as reserves/

    Jan 1, 2007

  • CIM
    Summary Of The EU Voluntary Copper Risk Assessment

    By K. Delbeke

    Within the framework of the EU Existing Substance (93/793/EEC) and REACH regulations EC/1907/2006), the copper industry initiated in 2000 a comprehensive Voluntary Risk Assessment of copper and severa

    Jan 1, 2007

  • CIM
    Industrial Gases for Copper Production

    By A. Deneys

    This paper reviews industrial gases used in primary copper production. Copper smelting industrial gas demand has steadily increased since the first commercial oxygenconcentrate smelting in 1952 [1]. I

    Jan 1, 2007

  • CIM
    Gas Dispersion Management In A Copper I Molybdenum Separation Circuit

    The effect of superficial gas rate distribution (Jg profile) on down-the-bank metallurgical response was tested in the rougher-scavenger bank (eight 10-m3 tank cells, 4 roughers and 4 scavengers) at H

    Jan 1, 2007

  • CIM
    Technology and Operational Improvements in Tuyere Punching, Silencing, Pyrometry and Refractory Drilling Equipment

    By M. J. Marinigh

    Increased safety requirements, higher operational costs, greater environmental restrictions, and new competitive processing techniques are the challenges smelter operators must confront in order to re

    Jan 1, 2007

  • ISEE
    Digital Shock Tube

    By Theirry Bernard

    The era of non-electric systems as an initiating system has revolutionised the blasting world by introducing a very safe initiating system that is reliable, with initiation sequence possibilities that

    Jan 1, 2007