SVCW Gravity Pipeline—Ground Movements During Construction - RETC2023By Nik Sokol, Eric Sekulski, Leo Weiman-Benitez, Jon Hurt, Shrinidhi Vijayakumar, Phaidra Campbell
The Silicon Valley Clean Water (SVCW) Gravity Pipeline (GP) is the first Progressive Design Build (PDB) tunnel completed in North America. As part of the Regional Environmental Sewer Conveyance Upgrad
Jun 13, 2023
-
Qualifications and Design of Waterproofing Systems for Underground Structures - RETC2023By Enrico Pavese, Tim Kearney, Stefan Lemke
Watertightness is of central importance in hydraulic and underground structures but has always been associated with a risk, as demonstrated by the very high impact that water inflows have on the damag
Jun 13, 2023
-
Gravity Sewer Tunnel Liner Corrosion Protection—Part Two - RETC2023By Jon Y. Kaneshiro, Eric Dawson, Pooyan Asadollahi, Steven Hunt
This paper provides updates to the paper published by the lead author at RETC 2011 with a summary of developments in technologies, products, and approaches to corrosion analyses of gravity sewer tunne
Jun 13, 2023
-
Hard Rock TBMs—The Experience of Brenner Basis Tunnel, Construction Lot Mules 2-3, for the Evaluation of Risk Prediction Tools - RETC2023By A. Mei, F. Amadini, F. Cernera, D. Baliani, A. Flor, M. La Morgia, F. Sassi
The risk of TBM jamming because of squeezing rock mass or excessive caving (instability of the cavity) conditions is always a focal point while boring long and deep tunnels with shielded TBMs. Mechani
Jun 13, 2023
-
Second Narrows Water Supply Tunnel—Conventional Deep Shaft Excavation in Variable Weak Rock - RETC2023By J. Andrew McGlenn, Brian McInnes, Bruce Downing, Murray Gant
The Second Narrows Water Supply Tunnel crossing beneath Burrard Inlet is an important component of the Greater Vancouver Water District’s plans to increase seismic resilience and meet increasing water
Jun 13, 2023
-
Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023By Victor Despointes, Stephane Polycarpe, Kathryn Kelly, Chris Feeney, Brian Hann, Vojtech Ernst Gall
The Pawtucket Tunnel is a 2.2-mi, 30.2-ft diameter CSO storage tunnel in Rhode Island. The primary tunnel is built using a dual-mode open-EPB TBM capable of sealing the face within 120 seconds to mana
Jun 13, 2023
-
A Novel Holistic Approach to Rehabilitation of Underground Structures - RETC2023By L. Boyd, T. Martin, V. Gall
Water infiltration into subgrade infrastructure can cause major impacts on their performance. In addition to damaging the structure, water intrusion leads to deterioration of installations including e
Jun 13, 2023
-
Packaging and Contract Delivery Methods for the Horizon Lateral - RETC2023By Ray Brainard, Adriana Ventimiglia, Amanda Kerr
The $2 billion Horizon Lateral includes over 30 miles of trenched and tunneled pipeline with diameters up to 120 inches.Related infrastructure includes large and small pumping stations, reservoirs, an
Jun 13, 2023
-
Tunnel Condition Assessment: State of the Practice - RETC2023By Ali Hafiz, Aidin Golrokh, Tom Iseley, Kaz Tabrizi, Saleh Behbahani
In the USA many highway tunnels were built during the 1930s through 1960s. This indicates that these tunnels have exceeded their intended design service life. Based on the initial tunnel inventory con
Jun 13, 2023
-
Flood Resilience for San Francisco - RETC2023By Eva K. Fernandez, Paul Y. Louie, Derek S. Adams, Renée L. Fippin
The Folsom Area Stormwater Improvement Project is part of SFPUC’s flood resilience efforts under the Sewer System Improvement Program. This 4,000-foot-long, 12-footinside- diameter tunnel will help re
Jun 13, 2023
-
Structural Underpinning an Airport Terminal to Mitigate Tunneling Risk—Atlanta Plane Train West Extension Project - RETC2023By John Murray, Ryan Smith, Daniel Ebin, Robert Gould, Thomas Hennings
The Atlanta Plane Train Tunnel West Extension was excavated at Hartsfield-Jackson Atlanta International Airport using Sequential Excavation Methods (SEM). At its shallowest point, tunnel cover to bott
Jun 13, 2023
-
Risk Baseline Report: An Innovative Risk Management Approach for a Complex Underground Project - RETC2023By David J. Hatem, K. Bhattarai
The increasing popularity of alternative methods in delivery of underground infrastructure projects has given rise to innovative and collaborative contracting strategies to allocate and manage the uni
Jun 13, 2023
-
Construction of TBM-Mined Segments of the Sister Grove Outfall Pipeline - RETC2023By Ricky Chipka, Roshan Thapa, Richard Yovichin, Greg Rogoff, Patrick Niemuth
A 4.5-mile-long, 96-inch-diameter outfall pipeline was constructed between North Texas Municipal Water District’s proposed Sister Grove Regional Water Resource Recovery Facility and the Stiff Creek Di
Jun 13, 2023
-
Mechanized Tunneling—New Trends in TBM Development - RETC2023By Werner Burger, Marcus Lübbers
TBM development in recent decades has been dominated by increased face pressures, larger diameters and multi-mode functionality paving the way to realize projects deemed impossible before. In addition
Jun 13, 2023
-
New Water Supply—Oslo - RETC2023By Ingunn Opland, Silje M. Tinderholt
Drill and blast project in Norway’s capital. The contract consists of 7 rock caverns (350–950 m2), 9.2 km tunnels, and four shafts. With 110 blue-collar and 31 white-collar, the project produces an av
Jun 13, 2023
-
Innovative TBM Launching in Urban Areas - RETC2023By Fabrizio Fara
The Ship Canal Water Quality Project (SCWQP) includes a 2.7-mile long, 18'-10" internal diameter tunnel which is located inWest Seattle. Tunneling in urban areas and soft ground conditions (Till and T
Jun 13, 2023
-
30 Years of Advances in Risk Management for Underground Projects - RETC2023By Kevin Lundberg, Philip Sander, Daniel Weinberger, John Reilly
Since the early days of risk management, developments in technology and guidelines (ITA, ITIG, OGG, UCA) have advanced risk management and probable cost estimating, which are now widely recognized. WS
Jun 13, 2023
-
A Case Study in Successful Progressive Design Build Tunneling - RETC2023By Nik Sokol, Mike Jaeger, Leo C. Weiman-Benitez
Silicon Valley Clean Water signed a progressive-design-build (PDB) contract with Barnard Bessac Joint Venture (BBJV) to design and construct the Gravity Pipeline tunnel in Redwood City, CA. Owner and
Jun 13, 2023
-
Allegheny County Sanitary Authority—Ohio River Tunnel Project Updates - RETC2023By Shawn McWilliams, Aini Sun, Mike Lichte, Greg Colzani
The Allegheny County Sanitary Authority (ALCOSAN) adopted its Clean Water Plan (CWP) in May 2020, as part of a federal consent decree to comply with the USEPA’s Combined Sewer Overflow (CSO) Control P
Jun 13, 2023
-
Nice—Tramway T2: A Success Story in Unusual Ground Conditions - RETC2023By Raoul Fernandez, Bernard Catalano, Guillaume Roux
The Thaumasia Joint-Venture, composed of Bouygues Travaux Publics, Soletanche- Bachy and Bessac, completed the construction of the underground section of line 2 of the Nice tramway, which comprised a
Jun 13, 2023