Search Documents

Sort by

  • SME
    SVCW Gravity Pipeline—Ground Movements During Construction - RETC2023

    By Nik Sokol, Eric Sekulski, Leo Weiman-Benitez, Jon Hurt, Shrinidhi Vijayakumar, Phaidra Campbell

    The Silicon Valley Clean Water (SVCW) Gravity Pipeline (GP) is the first Progressive Design Build (PDB) tunnel completed in North America. As part of the Regional Environmental Sewer Conveyance Upgrad

    Jun 13, 2023

  • SME
    Qualifications and Design of Waterproofing Systems for Underground Structures - RETC2023

    By Enrico Pavese, Tim Kearney, Stefan Lemke

    Watertightness is of central importance in hydraulic and underground structures but has always been associated with a risk, as demonstrated by the very high impact that water inflows have on the damag

    Jun 13, 2023

  • SME
    Gravity Sewer Tunnel Liner Corrosion Protection—Part Two - RETC2023

    By Jon Y. Kaneshiro, Eric Dawson, Pooyan Asadollahi, Steven Hunt

    This paper provides updates to the paper published by the lead author at RETC 2011 with a summary of developments in technologies, products, and approaches to corrosion analyses of gravity sewer tunne

    Jun 13, 2023

  • SME
    Hard Rock TBMs—The Experience of Brenner Basis Tunnel, Construction Lot Mules 2-3, for the Evaluation of Risk Prediction Tools - RETC2023

    By A. Mei, F. Amadini, F. Cernera, D. Baliani, A. Flor, M. La Morgia, F. Sassi

    The risk of TBM jamming because of squeezing rock mass or excessive caving (instability of the cavity) conditions is always a focal point while boring long and deep tunnels with shielded TBMs. Mechani

    Jun 13, 2023

  • SME
    Second Narrows Water Supply Tunnel—Conventional Deep Shaft Excavation in Variable Weak Rock - RETC2023

    By J. Andrew McGlenn, Brian McInnes, Bruce Downing, Murray Gant

    The Second Narrows Water Supply Tunnel crossing beneath Burrard Inlet is an important component of the Greater Vancouver Water District’s plans to increase seismic resilience and meet increasing water

    Jun 13, 2023

  • SME
    Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023

    By Victor Despointes, Stephane Polycarpe, Kathryn Kelly, Chris Feeney, Brian Hann, Vojtech Ernst Gall

    The Pawtucket Tunnel is a 2.2-mi, 30.2-ft diameter CSO storage tunnel in Rhode Island. The primary tunnel is built using a dual-mode open-EPB TBM capable of sealing the face within 120 seconds to mana

    Jun 13, 2023

  • SME
    A Novel Holistic Approach to Rehabilitation of Underground Structures - RETC2023

    By L. Boyd, T. Martin, V. Gall

    Water infiltration into subgrade infrastructure can cause major impacts on their performance. In addition to damaging the structure, water intrusion leads to deterioration of installations including e

    Jun 13, 2023

  • SME
    Packaging and Contract Delivery Methods for the Horizon Lateral - RETC2023

    By Ray Brainard, Adriana Ventimiglia, Amanda Kerr

    The $2 billion Horizon Lateral includes over 30 miles of trenched and tunneled pipeline with diameters up to 120 inches.Related infrastructure includes large and small pumping stations, reservoirs, an

    Jun 13, 2023

  • SME
    Tunnel Condition Assessment: State of the Practice - RETC2023

    By Ali Hafiz, Aidin Golrokh, Tom Iseley, Kaz Tabrizi, Saleh Behbahani

    In the USA many highway tunnels were built during the 1930s through 1960s. This indicates that these tunnels have exceeded their intended design service life. Based on the initial tunnel inventory con

    Jun 13, 2023

  • SME
    Flood Resilience for San Francisco - RETC2023

    By Eva K. Fernandez, Paul Y. Louie, Derek S. Adams, Renée L. Fippin

    The Folsom Area Stormwater Improvement Project is part of SFPUC’s flood resilience efforts under the Sewer System Improvement Program. This 4,000-foot-long, 12-footinside- diameter tunnel will help re

    Jun 13, 2023

  • SME
    Structural Underpinning an Airport Terminal to Mitigate Tunneling Risk—Atlanta Plane Train West Extension Project - RETC2023

    By John Murray, Ryan Smith, Daniel Ebin, Robert Gould, Thomas Hennings

    The Atlanta Plane Train Tunnel West Extension was excavated at Hartsfield-Jackson Atlanta International Airport using Sequential Excavation Methods (SEM). At its shallowest point, tunnel cover to bott

    Jun 13, 2023

  • SME
    Risk Baseline Report: An Innovative Risk Management Approach for a Complex Underground Project - RETC2023

    By David J. Hatem, K. Bhattarai

    The increasing popularity of alternative methods in delivery of underground infrastructure projects has given rise to innovative and collaborative contracting strategies to allocate and manage the uni

    Jun 13, 2023

  • SME
    Construction of TBM-Mined Segments of the Sister Grove Outfall Pipeline - RETC2023

    By Ricky Chipka, Roshan Thapa, Richard Yovichin, Greg Rogoff, Patrick Niemuth

    A 4.5-mile-long, 96-inch-diameter outfall pipeline was constructed between North Texas Municipal Water District’s proposed Sister Grove Regional Water Resource Recovery Facility and the Stiff Creek Di

    Jun 13, 2023

  • SME
    Mechanized Tunneling—New Trends in TBM Development - RETC2023

    By Werner Burger, Marcus Lübbers

    TBM development in recent decades has been dominated by increased face pressures, larger diameters and multi-mode functionality paving the way to realize projects deemed impossible before. In addition

    Jun 13, 2023

  • SME
    New Water Supply—Oslo - RETC2023

    By Ingunn Opland, Silje M. Tinderholt

    Drill and blast project in Norway’s capital. The contract consists of 7 rock caverns (350–950 m2), 9.2 km tunnels, and four shafts. With 110 blue-collar and 31 white-collar, the project produces an av

    Jun 13, 2023

  • SME
    Innovative TBM Launching in Urban Areas - RETC2023

    By Fabrizio Fara

    The Ship Canal Water Quality Project (SCWQP) includes a 2.7-mile long, 18'-10" internal diameter tunnel which is located inWest Seattle. Tunneling in urban areas and soft ground conditions (Till and T

    Jun 13, 2023

  • SME
    30 Years of Advances in Risk Management for Underground Projects - RETC2023

    By Kevin Lundberg, Philip Sander, Daniel Weinberger, John Reilly

    Since the early days of risk management, developments in technology and guidelines (ITA, ITIG, OGG, UCA) have advanced risk management and probable cost estimating, which are now widely recognized. WS

    Jun 13, 2023

  • SME
    A Case Study in Successful Progressive Design Build Tunneling - RETC2023

    By Nik Sokol, Mike Jaeger, Leo C. Weiman-Benitez

    Silicon Valley Clean Water signed a progressive-design-build (PDB) contract with Barnard Bessac Joint Venture (BBJV) to design and construct the Gravity Pipeline tunnel in Redwood City, CA. Owner and

    Jun 13, 2023

  • SME
    Allegheny County Sanitary Authority—Ohio River Tunnel Project Updates - RETC2023

    By Shawn McWilliams, Aini Sun, Mike Lichte, Greg Colzani

    The Allegheny County Sanitary Authority (ALCOSAN) adopted its Clean Water Plan (CWP) in May 2020, as part of a federal consent decree to comply with the USEPA’s Combined Sewer Overflow (CSO) Control P

    Jun 13, 2023

  • SME
    Nice—Tramway T2: A Success Story in Unusual Ground Conditions - RETC2023

    By Raoul Fernandez, Bernard Catalano, Guillaume Roux

    The Thaumasia Joint-Venture, composed of Bouygues Travaux Publics, Soletanche- Bachy and Bessac, completed the construction of the underground section of line 2 of the Nice tramway, which comprised a

    Jun 13, 2023