Search Documents

Sort by

  • DFI
    Structural Aspects Of The Stabilization Of Ten Mile Slide

    By Adrian Gygax, Sarah Gaib, Rod Kostaschuk

    The British Columbia Ministry of Transportation and Infrastructure (Ministry) recently completed a slope stabilization project at Ten Mile Slide on Highway 99. The highway is an essential part of the

    Oct 1, 2022

  • DFI
    Dynamic Load Testing Of Non-Uniform Piles

    By Thai Nguyen Ph. D

    Dynamic Load Test (DLT) on driven piles has been performed routinely all over the world. In several recent projects, even 100% testing has become a norm where every single pile is dynamically load tes

    Oct 1, 2022

  • DFI
    New Insights On Detecting Flaws With Csl And Tip

    By Andrew Z. Boeckelmann, David S. Graham, Paul J. Axtell

    In the last fifteen years, several research studies have evaluated the ability to detect various types of deep foundation concrete integrity flaws with crosshole sonic logging (CSL) and thermal integr

    Oct 1, 2022

  • DFI
    A Discussion Of Inconsistencies Between Lrfd And Asd Methods For Geostructural Design Applications Of The Aashto Bridge Design Specifications

    By Dimitrios Polantzas P. E., Collin E. Sweeney E. I. T., Franklin M. Grynkiewicz P. E., Leili Javidanian P. E.

    In the latest AASHTO design specifications, the Load and Resistance Factor Design (LRFD) method is prescribed for the design of retaining walls. However, inconsistencies arise when LRFD is used for re

    Oct 1, 2022

  • DFI
    The Advantage Of Measurement While Drilling (Mwd) For Geotechnical Site Characterization

    By Anahita Modiriasari, Benjamin S. Rivers

    Measurement while drilling (MWD) is a subsurface exploration technique associated with real-time and continuous monitoring and recording of drilling data during the drilling process. This technique ca

    Oct 1, 2022

  • DFI
    Interdisciplinary And Inventive Approaches To Drilled Shaft Remediation

    By William D. Oder, Seth H. Hamblin, Les R. Chernatskas, Jonathan L. Ernst

    Large diameter drilled deep foundations are a widely utilized solution throughout North America and the world. Numerous design and construction techniques developed over the past 100 years have made t

    Oct 1, 2022

  • DFI
    Design And Field Comparison Of Ground Improvement And Bored Piles For Large Diameter Steel Water Tanks

    By Vijaya Bhushan Rao, Ali Semercioglu, Jason Redgers

    Large diameter steel water tanks with high storage capacities impart heavy loads deep into the ground, generally requiring deep foundations to adequately support them. The use of ground improvement as

    Oct 1, 2022

  • SME
    Extensive Duct-fan Systems With In-line Booster Fans: Planning For Partial Vacuum And An Algorithm For In-line Booster Fan Positioning

    By MYRIAM FRANCOEUR, JOHN R.R. BOWLING, ADAM MCFADDEN

    As duct-fan systems push the envelope of power, length and cost, their design calls for a more comprehensive technoeconomic analysis to ensure they deliver the expected results without failure and cos

    Oct 1, 2022

  • SAIMM
    Maximum height estimation for mine waste dumps

    By S. Chai

    Waste dumps are widely used to discharge stripped mine wastes in open pit mining methods. As mining progresses, the height of the waste dumps will increase gradually, which may induce sliding failure

    Oct 1, 2022

  • DFI
    Evaluation Of Existing P-Y Models For Caliche Based On Numerical Analysis Of Raiders Stadium Lateral Load Tests

    By Ramin Motamed, Fahim M. Bhuiyan, Raj V. Siddharthan

    Numerical lateral load analysis based on the beam on Winkler foundation (BNWF) model (i.e., the p-y method) is a simple, and widely used tool to predict lateral responses of drilled shafts from field

    Oct 1, 2022

  • DFI
    Analytically Modelling Dst Arrival Time Databases With High Order Polynomials For Optimal High Resolution Imaging

    By Gerald Verbeek, Erick Baziw

    Downhole Seismic Testing (DST) is an extensively utilized geotechnical tool for site characterization. DST provides low strain (<10-5) in-situ interval shear and compression wave velocity estimates. T

    Oct 1, 2022

  • IIMP
    Evaluation of solids content in settling, compressibility, and consolidation of a low-density tailings

    By Eleonardo Lucas, Christ Barriga

    The use of saline water, a product of the sea water osmosis process, for the processing of the mineral from the Bayovar Mine in Peru, is part of the process of final disposal of the studied tailings.

    Sep 30, 2022

  • IIMP
    Modeling of Dewatering & Depressurization of an Open Pit with Historic Underground Mine Workings

    By Yaming Chen, Gerry Papini

    This paper presents a case study of three-dimensional groundwater modeling of a proposed open pit at a gold mine project with historic flooded underground (u/g) mine workings in British Columbia, Cana

    Sep 30, 2022

  • IIMP
    Mecanización del Desmonte en Compañía Minera Antamina. Propuesta para capturar el valor tangible e intangible de la mecanización

    By Néstor Deza, Kim Montes

    En los últimos 20 años la operación minera en Antamina ha profundizado su tajo, el stripping ratio y la distancia de acarreo de desmonte, se han seguido incrementando para mantener la producción metál

    Sep 30, 2022

  • IIMP
    Enhanced Geometallurgical Characterization - Mini Pilot Plant Leveraged by Digital Twin Development

    By Mauricio Estrada, Luis Vilchez, Luis Valencia, Marco Vera, Italo Manzo

    Flotation is the most used separation process worldwide. Flotation characterization is usually carried out in batch conditions at laboratory scale. A phenomenological description of the flotation proc

    Sep 30, 2022

  • IIMP
    Automating cyanide measurement & control in highly variable complex copper gold ores by applying a modified potentiometric titration determination

    By Egonk Arriagada, Brindel Barzola, Peter Leckie, Greg Zwolak, Gilmar Guzmán, Germán Chen

    Newmont’s Yanacocha operation in Peru presented an especially challenging environment for reliable cyanide measurement and control, processing 3 semi-distinct complex ore types with feed Cu ranging fr

    Sep 30, 2022

  • IIMP
    Extensión de vida de los activos de componentes de flota utilizando el Asset Health Center (AHC) de Newmont Yanacocha

    By Claudio Sulca, Fernando Salas

    Como parte de la política de mejora continua de nuestra compañía y de nuestro proceso de gestión de activos, uno de nuestros principales objetivos es lograr que nuestros activos alcancen y superen las

    Sep 30, 2022

  • IIMP
    Algorith Development and implementation for georeferenced particle size distribution (PSD) data

    By Javier Illanes, Maurice Moore, Felipe Moroni, Rafael Acosta

    Any organization that subjects its activities to a continuous improvement process must be able to adequately measure the results of the implemented changes in order to pursue better results over time.

    Sep 30, 2022

  • IIMP
    Geomembranes mitigate environmental issues in tailings dams

    By Pascual Perazzo Vaschetti Gabriella

    The increasing emphasis on environmental issues has crucial importance in mining projects, hence in tailings dams. Their water barrier needs a two-fold environmental assessment: the environmental impa

    Sep 30, 2022

  • IIMP
    Application of Albion Process™ on a Complex Feed Containing Base and Precious Metals

    By Laurie McDonnell

    As reserves of high-grade, easily accessible ores decline, it is becoming increasingly important to treat complex feeds and recover multiple target metals, and to identify approaches that will achieve

    Sep 30, 2022