Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Modelling of height of connective fractures during longwall miningBy D Adhikary, M Khanal, B Poulsen, H Guo
During longwall mining, the ability to reliably estimate the height of longwall mining-induced fractures is critically important in order to effectively manage mining-induced water inflows and aquifer
Nov 30, 2018
-
Geotechnical strata characterisation using geophysics and its application for coal mine designBy T Medhurst
Recent developments in geophysical borehole log analysis using the Geophysical Strata Rating (GSR) are now routinely used in a number Australian coal mining operations. This allows development of 3D g
Nov 30, 2018
-
Raise bore stability and risk assessment empirical database updateBy A Penney, M J. Pascoe, R M. Stephenson
The empirical McCracken and Stacey stability and risk assessment method has been in use for more than 20 years to assess geotechnical stability issues for raise bored shafts. The methodology has been
Nov 30, 2018
-
Vibration control blasting for low stability final wallsBy G Wyartt
In the Pilbara region of Western Australia, an iron ore mine is undertaking a high wall cut-back to improve stability and allow access to deeper ore deposits. Several sections of the wall have been cl
Nov 30, 2018
-
Understanding and modelling squeezing ground conditions at the Ballarat Gold MineBy B Roache, A Vakili, R Talebi
When a highly anisotropic or weak rock mass is subjected to high-stress conditions, it can lead to large ongoing deformations or squeezing ground conditions. Squeezing ground conditions can impose inc
Nov 30, 2018
-
Single pass drill, install and inject self-drilling resin bolt application in poor groundBy T Roberts, D Faulkner, G Watt
Traditional mechanised resin rock bolting in hard rock underground mines requires the installation of resin capsules into a pre-drilled hole prior to the rock bolt being spun into a hole to mix the re
Nov 30, 2018
-
Proneness of competent over-stressed intact rock to violent fracturingBy B L. Sainsbury, M F. Lee, A Penney
For most practical rock engineering purposes, stress versus strength conditions around underground openings for which rock masses fail and their various modes of failure, are reasonably well-understoo
Nov 30, 2018
-
Managing floor heave in an underground longwall coal mineBy P Corbett, P Sheffield
Springvale Mine is an underground coal mine in the western coalfield of New South Wales which utilises retreat longwall mining technique. The mine encountered significant gateroad floor heave issues d
Nov 30, 2018
-
Forecasting mine seismicity – towards a more established methodologyBy A Vakili, F Harvey, H Greaves
Mine seismicity is one of the most difficult geotechnical risks to manage in seismically active mines. There are currently some established empirical and statistical methods that provide quantitative
Nov 30, 2018
-
Intensity quantification of coal and rock burst risk – a reviewBy C Zhang, I Canbulat, G Fan, D Zhang, C Wang
A clear understanding of the intensity of coal and rock burst is the basis for future research on burst mechanism and control. There has been a wide variety in the description of coal and rock burst d
Nov 30, 2018
-
CIM Mineral Exploration Best Practice GuidelinesBy CIM Mineral Resource, Mineral Reserve Committee
The CIM Mineral Exploration Best Practice Guidelines (the Exploration Guidelines) have been prepared to assist professional geoscientists and engineers to conduct consistently high-quality work in ord
Nov 23, 2018
-
Productivity Improvement In Tooling Sector – World Class Manufacturing (Wcm) Methodology ImplementationBy Felipe Poffo, Flávio Messas
Due to the high level of competition in tooling sector, a necessity to increase the level of processes and assets management has initiated. Based on the World Class Manufacturing methodology, applied
Nov 22, 2018
-
Case study – Ernest Henry Mine: designing step out zones in an inclined sub-level caveBy P Nichols, C te Kloot, A Harrison
Ernest Henry mine (EHM) is a sub-level caving operation located in north-west Queensland, Australia. Located below a previously mined open pit, the underground operation ramped up production to 6.8Mt/
Nov 21, 2018
-
Putting the ‘GEO’ back in front of GEOmetallurgy: importance of early implementation of quantitative mineral system characterisation, classification and modellingBy W Potma, C Brauhart, S Halley, S Urbisinov, A Scogings
Truly integrated, quantitative, 3D GEOmetallurgical (or mineral system) characterisation, classification and 3D modelling should provide a cradle to grave unifying link across the exploration and mini
Nov 21, 2018
-
Forecast the mineral processing destinations based on spatial interpolation of geometallurgical variablesBy N Madani, Y Abildin, E Topal
Mine planning is a crucial part of all mining industry projects, and nowadays, geometallurgical mapping through advanced computer technologies provides an opportunity to involve metallurgical response
Nov 21, 2018
-
Strategic mine schedule optimisationBy A Tsoy
This abstract describes long-term mining schedule optimisation approach that may be suitable for complex marginal projects and is based on modern scheduling techniques. CITATION: Tsoy, A, 2018. Strate
Nov 21, 2018
-
Energy complexities in complex orebodiesBy M Ziemski
The provision and management of energy in both fuel and electricity forms is an increasingly important consideration for mines. Pressures from communities, governments and markets are increasing towar
Nov 21, 2018
-
3D estimation of variables with complexity in cross-correlation structuresBy N Madani
Linear interpolation of geo-related variables is important to different aspects of mining engineering such as long and short-term mine planning. The ore deposit description attained from spatial model
Nov 21, 2018
-
Structural Characteristics of Strata Overlying of a Fully Mechanized Longwall Face: A Case StudyBy J. Ning, T. Bu, J-Q. Jiang, L. Jiang
"In coal mining in China, the cutting height of the shearer in longwall faces is increasing. Owing to the increase of extraction height, the caved roof strata area is enlarged, and new issues are bein
Nov 1, 2018
-
The Giant Kamoa—Kakula Project in the Democratic Republic of CongoBy B. Matsetela, S. Amos, V. Nkuna
"The Kamoa-Kakula copper project—a joint venture between Ivanhoe Mines, Zijin Mining Group Co. Ltd, and the government of the Democratic Republic of Congo—has been independently ranked as the world's
Nov 1, 2018