Search Documents

  • SME
    Advanced Measurement And Monitoring Technologies For Environmental Problem Solving A Technology Review (SME Annual Meeting March 1-3, 1999, Denver, Colorado)

    By F. B. Henderson III

    Since the "end" of the Cold War, revolutionary new research and commercial remote sensing capabilities are being developed that will dramatically change the way we map the earth and address its enviro

    Jan 1, 1999

  • SME
    Application Of The Aqueous Biphase Separation (ABS) Process For The Separation Of Ultrafine Industrial Minerals

    By R. Mensah-Biney

    The aqueous biphase separation process (ABS) has been used to separate ultrafine industrial minerals. The partition behavior of TiO2, Al2O3, Fe2O3 and kaolin was not pH dependent. The partition behavi

    Jan 1, 1999

  • AUSIMM
    Construction Management of Hydrogeological Aspects of Melbourne City Link Project

    By I A. Lamb

    The Melbourne City Link Project has two tunnels, the Domain and Burnley Tunnels, which have been constructed by Transfield Obayashi Joint Venture (TOJV) under a design and construct contract. The two

    Jan 1, 1999

  • SME
    Controls Of Precious Metal Mineralization In West Central Sierra Madre Occidental, Mexico - SME Annual Meeting March 1-3, 1999, Denver, Colorado

    By F. Warnaars

    Historically, this area produced gold and silver from many well-known vein deposits, like Tayoltita, Topia, and San Jose de Gracia. Modern exploration identified three categories of deposits: 1) low g

    Jan 1, 1999

  • SME
    Environmental Benefits Of Using Clay Granules In Pesticide Applications

    By D. R. Taylor, R. G. Goss

    The use of clay granules as carriers for pesticides dates from the early 1940's and by the present day represents a business conservatively estimated at between 200 - 300 thousand tons / year in

    Jan 1, 1999

  • SME
    Bio-Indicator Evaluation Of Water Quality Impacts From Inactive And Abandoned Mines In The Bear Butte Creek Basin Of The Black Hills

    By A. D. Davis

    Environmental impacts from acidic mine drainage are growing national concerns that are particularly acute in the headwaters of the Rocky Mountain region. In the Black Hills of South Dakota, approximat

    Jan 1, 1999

  • SME
    Accuracy Analysis Of GIS-Based Coal Resource Estimation

    By E. Westman

    Geographic Information Systems (GIS) are becoming a more commonly used tool for resource estimation as they provide not only a database management platform, but also the graphical capabilities to visu

    Jan 1, 1999

  • SME
    The Sage Mill Project

    The Sage Mill Project w approved by Santa Fe Pacific Gold Corporation's Board of Directors in October 1994. The Sage Mill Project included a pressure oxidation plant designed and constructed to p

    Jan 1, 1999

  • SME
    A New Approach For Removing Talc For Upgrading Molybdenite Ores

    By X. K. Jiang

    Upgrading molybdenite ore can be technically difficult and expensive if talc is a major impurity in the ore. The layered structure of molybdenite and talc decreases the surface specificity of floatati

    Jan 1, 1999

  • SME
    Adding A Third Main Fan At The Waste Isolation Pilot Plant (SME Annual Meeting March 1-3, 1999, Denver, Colorado)

    By K. H. McDaniel, L. Griswold

    The Waste Isolation Pilot Plant (WIPP) is adding a third fan to operate in parallel with, and supplement, its two existing main fans. An engineering analysis conducted in 1995 identified the need for

    Jan 1, 1999

  • SME
    Deep Cut -Ground Control And Worker Safety In Coal Mines (SME Annual Meeting March 1-3, 1999, Denver, Colorado)

    By E. R. Bauer

    The trend in underground room-and-pillar coal mining is to employ remote-control continuous mining machines and extended cuts, 12 m (40 ft) deep or more. This system of coal extraction, adopted by ove

    Jan 1, 1999

  • SME
    Application Of Economic Parameters And Cutoffs During And After Pit Optimization

    By B. K. Baird

    The application of cutoffs during and after pit optimization is examined for a lower-grade multi-metallic copper deposit. Pit optimization requires calculation of the net revenue associated with each

    Jan 1, 1999

  • SME
    Coal Mine Subsidence Prediction Using A Boundary-Element Program

    By Keith A. Heasley

    Historically, the surface subsidence over underground coal mines has been predicted using empirical profile or influence functions which have little or no connection to the actual mechanics of the sub

    Jan 1, 1999

  • SME
    Design Of Stillwater Mining Company's East Boulder Mine

    By B. Strickland

    The decision to accelerate development of Stillwater Mining's East Boulder Mine was made in March of 1998. It required the completion of conceptual designs by July of 1998. This was accomplished

    Jan 1, 1999

  • DFI
    Designed, Load Tested, Installed, And Integrity Tested ACIP Piles At Lovers' Key Site In Southwest Florida

    By Gregory A. Stephan

    A case history of design, prediction, instrumented static load tests on probe piles, installation monitoring, and integrity testing of production piles is presented. Based upon project-specific subsoi

    Jan 1, 1999

  • SME
    Daylighting Texas Quarry's North Mine

    By H. V. Scotland III

    Lafarge Corporation's Texas Quarry, in Baltimore MD, achieved a substantial expansion of pit reserves by removing an inactive underground mine. The day lighting program, designed, and completed i

    Jan 1, 1999

  • DFI
    Caveat Emptor Or A Buyer's Guide To Pile Integrity Testing - Introduction

    By Joram M. Amir

    During recent years, the integrity testing of piles has made considerable progress. With the availability of portable and powerful computers, practically all integrity testing equipment is now digital

    Jan 1, 1999

  • TMS
    Copper Extraction From The 60's Into The 21st Century

    By W. G. Davenport

    Changes in copper extraction from 1960 till today are documented. The top ten changes have been: (a) replacement of reverberatory smelting by high intensity oxygen rich smelting (b) growth of the

    Jan 1, 1999

  • CIM
    Syncrude's Low Energy Extraction Process: Commercial Implementation

    By S. Ng, Peter Stapleton, Paul Mankowski, J. Spence, R. Siy

    "Syncrude has developed a low energy extraction process for the recovery of bitumen from oil sand. This new process operates at a temperature of 25 °C, resulting in substantially lower energy costs an

    Jan 1, 1999

  • ISEE
    Diamonds are a Driller's Best Friend

    By Langdon T. Mitchell, Karl Ingmarsson

    The title is not referring to jewelry; nor is it about diamond core drilling. This article is instead about an emerging application for diamonds, hard rock percussive drilling with diamond drill bits.

    Jan 1, 1999