    Use Of Probability Distributions To Define Baseline Ground Water Quality At A Uranium Mill Site

    By K. J. Bruxvoort

    Background ground water quality is often used to drive remediation programs at sites with waters affected by mining activities. In the past these levels were sometimes chosen without rigorous statisti

    Jan 1, 1998

  • TMS
    Structure and Hydrogen-Absorption Properties of LaNi5 Thin Films Prepared by a Sputtering Method

    By Kimio Itagaki, Torn Matsumoto, Makoto Ohtsuka, Kentarou Harada

    "The structure and hydrogen-absorption properties of LaNis thin films were investigated in the present study. LaNis thin films were prepared by a sputtering method with a radio-frequency power, Ws, of

    Jan 1, 1998

  • AUSIMM
    Recent Developments and Trends in Backfill Practices in Canada

    Planning of modern mines entails considerable challenges in the areas of ground control, materials handling, safety, environment, equipment and personnel. Many orebodies are not economical unless effi

    Jan 1, 1998

  • SME
    An On-Site Simulation Of Submarine Tailings Disposal: Pore Water Chemistry And Biological Recovery

    By R. H. Lambeth

    Disposal of mine tailings in "waters of the United States" is presently prohibited even though case studies indicate that the practice may be environmentally viable. To simulate disposal in the natura

    Jan 1, 1998

  • AUSIMM
    Integration of a Microseismic Monitoring System in Mining the Pasminco Broken Hill Southern Cross Area

    By K P. Tully

    In August 1996 a Microseismic Monitoring System developed by ISS International Limited was installed at the Pasminco Broken Hill Mine -Southern Cross area. The project aims were to:Assist in daily saf

    Jan 1, 1998

  • SME
    1997 Jackling Lecture - Porphyry Copper Geology: A Late Century View

    By Spencer R. Titley

    "For his pioneering contributions to the understanding of the geology of porphyry copper systems" Recipient Of The 1997 D. C. Jackling Award SPENCER R. TITLEY Introduction The subject of thi

    Jan 1, 1998

  • TMS
    The Liquidus Surface And Tie Lines In The Nickel-Cobalt-Sulphur System Between 1273 And 1573 K ,

    By M. Soltanieh

    The liquidus surface? and tie-lines in the nickel-cobalt-sulphur ternary system have been determined between 1<273-1573 K. The experiments were conducted by equlibrating the liquid sulphide with the m

    Jan 1, 1998

  • CIM
    The Advanced Control Project at Highland Valley Copper

    By Cy Jordan, Ben Burdett, Adrian Dance, Jack Rainey

    "In 1997, EIMCO Minerals installed a knowledge-based control system on one of the five primary grinding lines at Highland Valley Copper. The objective of the system is to maximise throughput without a

    Jan 1, 1998

  • AUSIMM
    Going Underground - The Evolution of the Oaky Creek Mining Complex

    The evolution of the Oaky Creek mining complex provides a good example of the mining cycle in practice. Oaky Creek has been innovative in its choice of mining methods, with virtually the full range of

    Jan 1, 1998

  • SME
    Modeling Mine Ventilation Networks Using Five Basic Network Elements

    By Jan M. Mutmansky, Y. J. Wang

    In the mathematical analysis of electrical networks, the electrical devices are often modeled using idealized network elements such as current sources, voltage sources and resistors. An analogous appr

    Jan 1, 1998

  • AUSIMM
    The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount Isa (ee90997b-915a-4723-962c-df13e11cf8b6)

    By Kuganathan K, Potvin Y

    Enterprise Mine at Mount Isa is to expand ore production from the current 1.4 to 3.5 mtpa by mining the 3500 Orebody, from which production is scheduled to start in February 1998 making this the dee

    Jan 1, 1998

  • TMS
    Innovative Cyanide Solution Treatment Bythermal Plasma

    By Gervais Soucy

    During mineral and industrial processing, contaminated wastewater can be generated such as cyanide liquors (free species or in complex form). This paper presents the treatment of cyanide solution deri

    Jan 1, 1998

  • SME
    Application Of Fuzzy Set Theory In The Evaluation Of Roof Categories In Longwall Mining

    By Y. M. Jiang, D. W. Park

    Longwall faces can move at high advancing rates, but many geological variations can cause unexpected instabilities and production losses. The rapid movement makes it necessary to evaluate different ge

    Jan 1, 1998

  • AUSIMM
    Remote Mining in the Canadian Arctic - The Falconbridge Limited Raglan Experience

    In February 1995, Falconbridge Limited approved the construction of a nickel mining and milling facility on its Raglan property situated in the Nunavik region of northern Quebec, Canada. The construct

    Jan 1, 1998

  • SME
    Further Studies On Relating The Breakage Properties Of Coal Bore Cores To Preparation Plant Feed (782c3ebc-fc62-4978-be90-da405354173d)

    By T. E. Wilson

    An exploration bore core sample of coal ought to be reduced from its original cylindrical form to a particle size distribution and particle composition that reflects, insofar as possible, a process st

    Jan 1, 1998

  • TMS
    Computational Simulations and Experimental Validation of a Furnace Brazing Process

    By F. Michael Hosking

    Modeling of a furnace brazing process is described. The computational tools predict the thermal response of loaded hardware in a hydrogen brazing furnace to programmed furnace profiles. Experiments we

    Jan 1, 1998

  • SME-ICGCM
    Laboratory and In Situ Results of a Slip Nut Yielding Rock Bolt System

    By John D. VandeKraats

    Yielding rock bolt systems have been developed to provide ground support while accommodating shifting, creeping, or swelling ground movements. The Dywidag Systems, Inc. (DSI) Slip Nut System is one su

    Jan 1, 1998

  • AUSIMM
    Flow Loop Testing of Different Paste Mixtures at Neves Corvo Mine, Portugal

    By M Byrne, P Newman, M Lindqvist

    SomincorÆs Neves Corvo Mine, one of the largest copper producers in Europe, is currently constructing a paste backfill plant in order to replace cemented rockfill in its bench and fill stopes and poss

    Jan 1, 1998

  • SME
    Broken Aro Remining/Reclamation Project

    By S. Mafi

    The Broken Aro project is associated with a 1910 abandoned underground mine complex that has been discharging aeid mine drainage from entries, seeps and springs. The Ohio Department of Natural Resourc

    Jan 1, 1998

  • CIM
    IOCC Using Expert System to Meet Production and Quality Control Goals

    By Paul Delottinville, Maynard Hall, Henry Hillier

    "An expert system application for supervisory control and optimization of the indurating process at the Iron Ore Company of Canada (IOCC) has been developed and installed in closed-loop. Prior to the

    Jan 1, 1998