Search Documents

  • NIOSH
    OFR-14-78 Development Of Optimized Diffuser And Spray Fan Systems For Coal Mine Face Ventilation

    By Robert E. Wallhagen

    This report describes the results of a four year investigation into improved face ventilation systems for underground coal mines. The objective was to experimentally determine configurations for a dif

    Jan 1, 1977

  • NIOSH
    OFR-29-78 Mine Wide Test Of The WVU Monitoring Concept - Phase I Final Report: System Design, Installation And Test Results

    By M. D. Aldridge

    The results of designing, constructing, installing and operating a ventilation monitoring system throughout an entire commercial coal mine is presented. Measured parameters were airflow, methane, carb

    Jan 1, 1977

  • NIOSH
    OFR-117(2)-77 Limits And Cost Sensitivity Of Alternate Parting Handling Methods - Volume II - Appendix A - Operating Instructions For The Production Profile Program

    The Production Profile Program is written for use on a Digital Model PDP 11/70 computer using a Fortran IV level G language. It may be run on any system which uses G level or an upward compatible vers

    Jan 1, 1977

  • NIOSH
    OFR-104-78 Demonstrating The Noise Control Of A Coal Preparation Plant - Volume I. Initial Installation And Treatment Evaluation

    By Matthew N. Rubin

    This report summarizes the work performed under USBM Contract No. H0155155, "Demonstrating the Noise Control of a Coal Preparation Plant." A Consolidation Coal Company coal preparation plant (the Geor

    Jan 1, 1977

  • NIOSH
    OFR-45-78 Safety Analysis Of Shaft-Sinking Operations

    The safety analysis of shaft-sinking operations included a review of accident reports from coal and metal-nonmetallic mine shaft-sinking projects in the United States, a review of foreign and domestic

    Jan 1, 1977

  • NIOSH
    OFR-148-77 Blasthole Underreamers For Surface And In Situ Mining

    By William A. Hustrulid

    A technical and economic evaluation of the potential for improving mining productivity through the use of underreamers in blastholes, specifically in relation to Minnesota taconite, Arizona surface co

    Jan 1, 1977

  • NIOSH
    IC 8755 Design Guide For Metal And Nonmetal Tailings Disposal

    By Roy L. Soderberg

    The Bureau of Mines has conducted substantial research on the design, construction, and operation of metal and nonmetal tailings ponds. This design guide, like related Bureau publications that precede

    Jan 1, 1977

  • NIOSH
    OFR-78-78 Feasibility Study Of Electric Shock Prevention

    By Gordon R. Sima

    The contract is concerned with feasibility studies, design and fabrication of a group of prototype hand-held test instruments and machine-mounted test instruments for measurement of electrical shock h

    Jan 1, 1977

  • NIOSH
    OFR-21(1)-78 Brake Evaluations & Recommendations - Evaluation And Development Of Performance Requirements Of Braking Systems For Rubber-Tired Mining Equipment In Underground Non-Coal Mines

    By Walter W. Kaufman

    The braking performance of underground, rubber-tired, non-coal mining vehicles is evaluated. Surveys of mining equipment and braking manufacturers and underground stopping tests are discussed as they

    Jan 1, 1977

  • NIOSH
    OFR-57(1)-78 Feasibility Studies Of A Bidirectional Auger System And A Machine Mining Plan - Volume I, Bidirectional Auger System

    By A. N. Baldwin

    This report documents work performed under Bureau of Mines Contract J0265029 to study and develop two innovative mining systems: ? An underground auger capable of augering into the right and left r

    Jan 1, 1977

  • NIOSH
    OFR-11-79 Exploratory Studies Of Flame And Explosion Quenching

    By R. A. Strehlow

    This is the final report for U.S. Bureau of Mines contract HO-122122, which was in effect from June 30, 1972 through January 4, 1976. The work resulted in the design and construction of a large labora

    Jan 1, 1977

  • NIOSH
    OFR-96(1)-78 Study Of The Use Of Taggants For Explosives Identification - Volume I. National Implementation Model - Executive Summary

    Explosives identification tagging refers to the addition to explosives, during manufacture, of coded microparticles that can survive detonation, be recovered and decoded, and allow the explosives to b

    Jan 1, 1977

  • NIOSH
    OFR-61(1)-78 Coal Mine Electrical System Evaluation - Volume I - Continuous Monitoring

    By Lloyd A. Morley

    A concept is presented to improve underground coal mine electrical system safety and availability. This proposed technique is based upon the ability to predict incipient failures in the mine power sys

    Jan 1, 1977

  • NIOSH
    OFR-161(1)-77 Stope Mechanization - Vein Mining

    By J. Bootle

    Marrow vein deposits will continue to be an important source of valuable minerals. Productivity per manshift is not keeping pace with operating costs. Increased mechanization of stoping operations mus

    Jan 1, 1977

  • NIOSH
    OFR-33-78 An Analysis Of Chemical Coal Cleaning Processes

    By Sabri Ergun

    Cost estimates and technical feasibility are compared for six chemical coal cleaning technologies. The comparison is based on conceptual application of the chemical cleaning methods for removal of pyr

    Jan 1, 1977

  • NIOSH
    OFR-123(4)-78 Advancement Of Mine Ventilation Network Analysis From Art To Science - Volume IV Sensitivity Of Leakage And Friction Factors

    By R. V. Ramani

    In this the available information friction factors and leakage report, on characteristics are reviewed and summarized. The use of Penn State Mine Ventilation Simulator (Volumes II and III of the Final

    Jan 1, 1977

  • NIOSH
    OFR-13-78 Engineering & Economic Evaluation Underspoil Haulage In Area Strip Coal Mines - Part II

    By Joseph L. Jordan

    Coal is essential to America?s future energy needs. To meet these needs mining methods must be safe, economical, and environmentally acceptable. Belt conveyor systems for coal haulage from surface min

    Jan 1, 1977

  • NIOSH
    OFR-122-77 Mine Grounding Systems: Evaluation Of Ground Beds And Ground-Bed Monitors And Evaluation Of Modular Ground-Wire Monitor

    By Wils L. Cooley

    Several aspects of coal mine safety-ground system operation are studied. Evaluations of two sophisticated ground-wire monitors are presented, along with a detailed report of development work on a modu

    Jan 1, 1977

  • NIOSH
    OFR-136-77 Field Permeability Test Methods With Applications To Solution Mining

    By John E. Rourke, O&apos

    A survey of existing and developing field permeability test methods was conducted in order to identify and specify capable methods to be used in feasibility investigations or performance monitoring fo

    Jan 1, 1977

  • NIOSH
    OFR-40-78 An Investigation Of The Effects Of Hardened Washers On The Uniformity Of Roof Bolt Tension And Resulting Ground Control In An Underground Mine

    By R. S. Rosso

    A program to investigate the effects of hardened washers on the uniformity of roof bolt tension and the resulting ground control in an underground mine was carried out. The complete roof bolt installa

    Jan 1, 1977