Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Sage Mill ProjectThe Sage Mill Project w approved by Santa Fe Pacific Gold Corporation's Board of Directors in October 1994. The Sage Mill Project included a pressure oxidation plant designed and constructed to p
Jan 1, 1999
-
A New Approach For Removing Talc For Upgrading Molybdenite OresBy X. K. Jiang
Upgrading molybdenite ore can be technically difficult and expensive if talc is a major impurity in the ore. The layered structure of molybdenite and talc decreases the surface specificity of floatati
Jan 1, 1999
-
Adding A Third Main Fan At The Waste Isolation Pilot Plant (SME Annual Meeting March 1-3, 1999, Denver, Colorado)By K. H. McDaniel, L. Griswold
The Waste Isolation Pilot Plant (WIPP) is adding a third fan to operate in parallel with, and supplement, its two existing main fans. An engineering analysis conducted in 1995 identified the need for
Jan 1, 1999
-
Deep Cut -Ground Control And Worker Safety In Coal Mines (SME Annual Meeting March 1-3, 1999, Denver, Colorado)By E. R. Bauer
The trend in underground room-and-pillar coal mining is to employ remote-control continuous mining machines and extended cuts, 12 m (40 ft) deep or more. This system of coal extraction, adopted by ove
Jan 1, 1999
-
Designing And Managing Unpaved Opencast Mine Haul Roads For Optimum Performance (SME Annual Meeting March 1-3, 1999, Denver, Colorado)By A. T. Visser
The expansion of surface mining has led to the development of very large off-highway trucks currently capable of hauling payloads in excess of 290t. Mine haul roads have historically been designed emp
Jan 1, 1999
-
Application Of Economic Parameters And Cutoffs During And After Pit Optimization (SME Annual Meeting March 1-3, 1999, Denver, Colorado)By B. K. Baird, P. C. Satchwell
The application of cutoffs during and after pit optimization is examined for a lower-grade multi-metallic copper deposit. Pit optimization requires calculation of the net revenue associated with each
Jan 1, 1999
-
Application Of Economic Parameters And Cutoffs During And After Pit OptimizationBy B. K. Baird
The application of cutoffs during and after pit optimization is examined for a lower-grade multi-metallic copper deposit. Pit optimization requires calculation of the net revenue associated with each
Jan 1, 1999
-
Coal Mine Subsidence Prediction Using A Boundary-Element ProgramBy Keith A. Heasley
Historically, the surface subsidence over underground coal mines has been predicted using empirical profile or influence functions which have little or no connection to the actual mechanics of the sub
Jan 1, 1999
-
Design Of Stillwater Mining Company's East Boulder MineBy B. Strickland
The decision to accelerate development of Stillwater Mining's East Boulder Mine was made in March of 1998. It required the completion of conceptual designs by July of 1998. This was accomplished
Jan 1, 1999
-
Designed, Load Tested, Installed, And Integrity Tested ACIP Piles At Lovers' Key Site In Southwest FloridaBy Gregory A. Stephan
A case history of design, prediction, instrumented static load tests on probe piles, installation monitoring, and integrity testing of production piles is presented. Based upon project-specific subsoi
Jan 1, 1999
-
Daylighting Texas Quarry's North MineBy H. V. Scotland III
Lafarge Corporation's Texas Quarry, in Baltimore MD, achieved a substantial expansion of pit reserves by removing an inactive underground mine. The day lighting program, designed, and completed i
Jan 1, 1999
-
Caveat Emptor Or A Buyer's Guide To Pile Integrity Testing - IntroductionBy Joram M. Amir
During recent years, the integrity testing of piles has made considerable progress. With the availability of portable and powerful computers, practically all integrity testing equipment is now digital
Jan 1, 1999
-
Copper Extraction From The 60's Into The 21st CenturyBy W. G. Davenport
Changes in copper extraction from 1960 till today are documented. The top ten changes have been: (a) replacement of reverberatory smelting by high intensity oxygen rich smelting (b) growth of the
Jan 1, 1999
-
The Effect of Lifter Design on the Alumbrera's SAG Mill Performance: Design Expectations and OptimizationBy Mark Sherman, M. Dennis, Raj Rajamani
"The two Alumbrera 36ft (10.97m)dia. SAG mills were sized, using the FDW ""Grindpower 'I program, to treat an average of 1852 tph each. This paper describes how modelling of the shell lifter design, u
Jan 1, 1999
-
Syncrude's Low Energy Extraction Process: Commercial ImplementationBy S. Ng, Peter Stapleton, Paul Mankowski, J. Spence, R. Siy
"Syncrude has developed a low energy extraction process for the recovery of bitumen from oil sand. This new process operates at a temperature of 25 °C, resulting in substantially lower energy costs an
Jan 1, 1999
-
Diamonds are a Driller's Best FriendBy Langdon T. Mitchell, Karl Ingmarsson
The title is not referring to jewelry; nor is it about diamond core drilling. This article is instead about an emerging application for diamonds, hard rock percussive drilling with diamond drill bits.
Jan 1, 1999
-
The Design Of The Ausmelt Technology Smelter At Zhong Tiao Shan's Houma Smelter, People's Republic Of ChinaBy E. N. Mounsey
The paper addresses the design of the Zhong Tiao Shan Company (ZTS) Houma Ausmelt Technology copper smelter in People's Republic of China. The smelter represents the third copper smelter deve
Jan 1, 1999
-
World's Largest Shell Supported SAG Mill At The Ernest Henry Concentrator-Operating Experiences And Results (bd8b4440-35bf-451c-b7eb-2b9292ef42b9)The Ernest Henry copper-gold project is located in North West Queensland, Australia and commenced production in late August 1997. Utilizing a philosophy of selecting the biggest proven equipment avail
Jan 1, 1999
-
Aqueous Biphasic Systems For Metal Separations: A Microcalorimetric Analysis Of Polymer/Salt Interactions'By D. J. Chaiko
Certain radionuclide ions (e.g., TcO4) exhibit unusually strong Affinities toward the polymer-rich phase in aqueous biphase systems generated by combinations of salt solutions with polymers such as po
Jan 1, 1999
-
Iron Ore Company of Canada (IOCC)'s New Silica Flotation PlantBy Mike Smith, George Chung
"A 23 million dollar Flotation Plant has been commissioned at the Iron Ore Company of Canada in 1998. Nine OK-50 cells &re used to float silica in this 1,400 tomes per hour plant. The paper details pr
Jan 1, 1999