Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
High-Speed 3D Tunnel Inspection in Subway Tunnels— Case Study San Francisco BART - RETC2021By Thomas Pea, Heiner Kontrus, Jérôme Steinkühler
In tunnel condition assessment, the trend is towards comprehensive 3D measurement combined with high quality image texture to document and quantify damages to the tunnel surface and to create a cohesi
Jun 13, 2021
-
The Effect of TBM Diameter on Ring Installation Time - RETC2021By Jamal Rostami, Tala Tahernia
TBM utilization rate is a component of machine performance prediction and critical for developing a reliable estimate of the construction completion time and cost of the tunnel. Estimation of the util
Jun 13, 2021
-
Design and Construction of Load Transfer System to Replace Existing 39th Street Bridge Piers with New Integral on the Track B/C Approach Structure for the East Side Access Project - RETC2021By Julio C. Martinez, Jeffrey L. Rice, Hayden Weschler
This paper details the extensive underpinning required to hold up the 39th street Bridge while demolishing its massive support piers and building a 30ft deep Cut/ Cover RR tunnel beneath it. The under
Jun 13, 2021
-
The Variable Density TBM—Current Level of Development - RETC2021By Werner Burger
After its first introduction in 2013, Variable Density TBMs have increased their application significantly in mechanized closed mode tunneling. Throughout a variety of successfully completed and ongoi
Jun 13, 2021
-
Real Challenges of Digging a Shaft in Free Phase Oil and Hydrocarbons - RETC2021By Ehsan Alavi, Sanjeer Yogendran, Savreet Singh
The Don River & Central Waterfront Coxwell Sanitary Bypass Tunnel Project in Toronto extends approximately 10.5 km from Ashbridges Bay Treatment Plant west under Lake Shore Boulevard, north under Bayv
Jun 13, 2021
-
Design Development of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project - RETC2021By Aaron Archer, James Parkes
This paper presents design considerations for the major underground elements of the pending BCRUA Phase 2 Raw Water Delivery System Project. These elements include two Lake Taps; an 8,800 LF, minimum
Jun 13, 2021
-
Transitioning from Mixed-Face Conditions to Hard Rock During TBM Launch on the Reedy River Basin Sewer Tunnel Project— Greenville, SC - RETC2021By Horry Parker Jr, Jason Gillespie, Justin Kolster, Stephen O’Connell
Construction of the 5,932-ft Reedy River Basin Sewer Tunnel in Greenville, SC was marked by a critical transition from drill-and-blast mining in mixed-face conditions to TBM excavation with limited ro
Jun 13, 2021
-
Dustless Hard Rock Tunneling Methods - RETC2021By Cody Giroux, Homer Scurlock, Michel Wasag
Silica and Crystalline Quartz exposure continues to be a serious health threat to nearly 2 million workers in the United States, including more than 100,000 working in high risk jobs such as abrasive
Jun 13, 2021
-
Two-Component Backfill Grouting at the Three Rivers Protection and Overflow Reduction Tunnel: Above and Below Ground Challenges and Solutions - RETC2021By Francesco Chiappalone, Tanner Murt, Lance Waddell, Cristina Oñate Salazar
The 3RPORT project is a 5-mile-long, 16-foot-internal-diameter tunnel excavated in hard rock by Slurry TBM in Fort Wayne, Indiana. Two-component grouting can be separated into two core areas of operat
Jun 13, 2021
-
Review of Measured Activity Times and Their Impacts on Machine Utilization in Operation of Selected TBMs - RETC2021By P. Nelson, R. O’Connell, J. Rostami
Tunnel boring machine (TBM) system utilization is a critical factor for predicting machine performance. The process of estimating machine performance, including rate of penetration (ROP) and machine u
Jun 13, 2021
-
Design and Construction of a Deep Underground Station in Urban Area - RETC2021By Verya Nasri
This paper will present the design and construction of a deep underground station of the Réseau Express Métropolitain (REM) project; the Édouard Montpetit station. The Édouard-Monpetit station is an i
Jun 13, 2021
-
Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021By David Mast, Amanda Foote, Mina Shinouda
The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5
Jun 13, 2021
-
Respirable Crystalline Silica Dust—Practical Impacts and Solutions in Tunnelling - RETC2021By Rainer Antretter
While respirable crystalline silica (RCS) dust that arises in industrial production mostly emanates from point sources and can be well mitigated, the extraction of dust is much more difficult in under
Jun 13, 2021
-
Tunneling in Toronto Shale—Construction of Coxwell Bypass Tunnel Project - RETC2021By Ehsan Alavi, Daniel Cressman, Tatiana Chiesa, Robert Mayberry
The City of Toronto’s Coxwell Bypass Tunnel (CBT) is currently being constructed by North Tunnel Constructors ULC. The scope of the CBT project includes construction of approximately 10.5 km of 6.3 me
Jun 13, 2021
-
Differing Site Conditions and Dispute Avoidance Under the FIDIC Emerald Book for Underground WorksBy Jürg Künzle
Underground construction is a matter of dealing with the inherent uncertainty of subsurface geology. If the encountered conditions are less favorable than the expected ones, the execution of excavatio
Jun 13, 2021
-
Hybrid Metro Station for Mitigating Construction Disturbance - RETC2021By Olivier Martin
In busy and historic cities, traditional open box metro stations are becoming outrageously difficult, unacceptable for the citizen and uneconomical. Hybrid stations provide an interesting alternative.
Jun 13, 2021
-
Tunnel Vision: Planning a Resilient 21st Century Wastewater System for Houston - RETC2021By Brian Gettinger, Jared Barber, Richard Weatherly, Shannon Dunne, Jeff Masek, Chuck Wolf, Fazle Rabbi, Jack Canfield
During Hurricane Harvey over 60% of the 39 WWTPs, including the low-lying 25 MGD Sims North WWTP, and one third of the 382 lift stations owned and operated by the City of Houston were flooded resultin
Jun 13, 2021
-
NEBT Project: The Application of Artificial Intelligence (AI) to Improve TBM Operations - RETC2021By Rajat Gangrade, Haotian Zheng, Jarrett Smith, Daniele Nebbia, Mike Mooney
The application of artificial intelligence (AI) to improve tunnel boring machine (TBM) operations requires a significant amount of information to train robust performance prediction models, e.g., for
Jun 13, 2021
-
The Use of Low-Density Cellular Concrete (LDCC) in Annular Fill Applications: Kaneohe-Kailua Sewer Tunnel Case Study - RETC2021By Don Painter, Nico Sutmoller, Lori M. K. Kahikina, Brian Dorwart
This paper will address the feasibility of using low-density cellular concrete (LDCC) for an annular fill application where project conditions required pumping the LDCC material for distances of up to
Jun 13, 2021
-
Tunneling in Abrasive Alluvial Material Above the Water Table Using a MTBM and an EPBTBM - RETC2021By D. Lynn, D. Arthur
Infrastructures continue to age and drinking water supplies are becoming scarce in the San Fernando Valley of Los Angeles, California. Frontier-Kemper Constructors, Inc. (FKCI) was engaged by the Los
Jun 13, 2021