Search Documents

  • SME
    High-Speed 3D Tunnel Inspection in Subway Tunnels— Case Study San Francisco BART - RETC2021

    By Thomas Pea, Heiner Kontrus, Jérôme Steinkühler

    In tunnel condition assessment, the trend is towards comprehensive 3D measurement combined with high quality image texture to document and quantify damages to the tunnel surface and to create a cohesi

    Jun 13, 2021

  • SME
    The Effect of TBM Diameter on Ring Installation Time - RETC2021

    By Jamal Rostami, Tala Tahernia

    TBM utilization rate is a component of machine performance prediction and critical for developing a reliable estimate of the construction completion time and cost of the tunnel. Estimation of the util

    Jun 13, 2021

  • SME
    Design and Construction of Load Transfer System to Replace Existing 39th Street Bridge Piers with New Integral on the Track B/C Approach Structure for the East Side Access Project - RETC2021

    By Julio C. Martinez, Jeffrey L. Rice, Hayden Weschler

    This paper details the extensive underpinning required to hold up the 39th street Bridge while demolishing its massive support piers and building a 30ft deep Cut/ Cover RR tunnel beneath it. The under

    Jun 13, 2021

  • SME
    The Variable Density TBM—Current Level of Development - RETC2021

    By Werner Burger

    After its first introduction in 2013, Variable Density TBMs have increased their application significantly in mechanized closed mode tunneling. Throughout a variety of successfully completed and ongoi

    Jun 13, 2021

  • SME
    Real Challenges of Digging a Shaft in Free Phase Oil and Hydrocarbons - RETC2021

    By Ehsan Alavi, Sanjeer Yogendran, Savreet Singh

    The Don River & Central Waterfront Coxwell Sanitary Bypass Tunnel Project in Toronto extends approximately 10.5 km from Ashbridges Bay Treatment Plant west under Lake Shore Boulevard, north under Bayv

    Jun 13, 2021

  • SME
    Design Development of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project - RETC2021

    By Aaron Archer, James Parkes

    This paper presents design considerations for the major underground elements of the pending BCRUA Phase 2 Raw Water Delivery System Project. These elements include two Lake Taps; an 8,800 LF, minimum

    Jun 13, 2021

  • SME
    Transitioning from Mixed-Face Conditions to Hard Rock During TBM Launch on the Reedy River Basin Sewer Tunnel Project— Greenville, SC - RETC2021

    By Horry Parker Jr, Jason Gillespie, Justin Kolster, Stephen O’Connell

    Construction of the 5,932-ft Reedy River Basin Sewer Tunnel in Greenville, SC was marked by a critical transition from drill-and-blast mining in mixed-face conditions to TBM excavation with limited ro

    Jun 13, 2021

  • SME
    Dustless Hard Rock Tunneling Methods - RETC2021

    By Cody Giroux, Homer Scurlock, Michel Wasag

    Silica and Crystalline Quartz exposure continues to be a serious health threat to nearly 2 million workers in the United States, including more than 100,000 working in high risk jobs such as abrasive

    Jun 13, 2021

  • SME
    Two-Component Backfill Grouting at the Three Rivers Protection and Overflow Reduction Tunnel: Above and Below Ground Challenges and Solutions - RETC2021

    By Francesco Chiappalone, Tanner Murt, Lance Waddell, Cristina Oñate Salazar

    The 3RPORT project is a 5-mile-long, 16-foot-internal-diameter tunnel excavated in hard rock by Slurry TBM in Fort Wayne, Indiana. Two-component grouting can be separated into two core areas of operat

    Jun 13, 2021

  • SME
    Review of Measured Activity Times and Their Impacts on Machine Utilization in Operation of Selected TBMs - RETC2021

    By P. Nelson, R. O’Connell, J. Rostami

    Tunnel boring machine (TBM) system utilization is a critical factor for predicting machine performance. The process of estimating machine performance, including rate of penetration (ROP) and machine u

    Jun 13, 2021

  • SME
    Design and Construction of a Deep Underground Station in Urban Area - RETC2021

    By Verya Nasri

    This paper will present the design and construction of a deep underground station of the Réseau Express Métropolitain (REM) project; the Édouard Montpetit station. The Édouard-Monpetit station is an i

    Jun 13, 2021

  • SME
    Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021

    By David Mast, Amanda Foote, Mina Shinouda

    The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5

    Jun 13, 2021

  • SME
    Respirable Crystalline Silica Dust—Practical Impacts and Solutions in Tunnelling - RETC2021

    By Rainer Antretter

    While respirable crystalline silica (RCS) dust that arises in industrial production mostly emanates from point sources and can be well mitigated, the extraction of dust is much more difficult in under

    Jun 13, 2021

  • SME
    Tunneling in Toronto Shale—Construction of Coxwell Bypass Tunnel Project - RETC2021

    By Ehsan Alavi, Daniel Cressman, Tatiana Chiesa, Robert Mayberry

    The City of Toronto’s Coxwell Bypass Tunnel (CBT) is currently being constructed by North Tunnel Constructors ULC. The scope of the CBT project includes construction of approximately 10.5 km of 6.3 me

    Jun 13, 2021

  • SME
    Differing Site Conditions and Dispute Avoidance Under the FIDIC Emerald Book for Underground Works

    By Jürg Künzle

    Underground construction is a matter of dealing with the inherent uncertainty of subsurface geology. If the encountered conditions are less favorable than the expected ones, the execution of excavatio

    Jun 13, 2021

  • SME
    Hybrid Metro Station for Mitigating Construction Disturbance - RETC2021

    By Olivier Martin

    In busy and historic cities, traditional open box metro stations are becoming outrageously difficult, unacceptable for the citizen and uneconomical. Hybrid stations provide an interesting alternative.

    Jun 13, 2021

  • SME
    Tunnel Vision: Planning a Resilient 21st Century Wastewater System for Houston - RETC2021

    By Brian Gettinger, Jared Barber, Richard Weatherly, Shannon Dunne, Jeff Masek, Chuck Wolf, Fazle Rabbi, Jack Canfield

    During Hurricane Harvey over 60% of the 39 WWTPs, including the low-lying 25 MGD Sims North WWTP, and one third of the 382 lift stations owned and operated by the City of Houston were flooded resultin

    Jun 13, 2021

  • SME
    NEBT Project: The Application of Artificial Intelligence (AI) to Improve TBM Operations - RETC2021

    By Rajat Gangrade, Haotian Zheng, Jarrett Smith, Daniele Nebbia, Mike Mooney

    The application of artificial intelligence (AI) to improve tunnel boring machine (TBM) operations requires a significant amount of information to train robust performance prediction models, e.g., for

    Jun 13, 2021

  • SME
    The Use of Low-Density Cellular Concrete (LDCC) in Annular Fill Applications: Kaneohe-Kailua Sewer Tunnel Case Study - RETC2021

    By Don Painter, Nico Sutmoller, Lori M. K. Kahikina, Brian Dorwart

    This paper will address the feasibility of using low-density cellular concrete (LDCC) for an annular fill application where project conditions required pumping the LDCC material for distances of up to

    Jun 13, 2021

  • SME
    Tunneling in Abrasive Alluvial Material Above the Water Table Using a MTBM and an EPBTBM - RETC2021

    By D. Lynn, D. Arthur

    Infrastructures continue to age and drinking water supplies are becoming scarce in the San Fernando Valley of Los Angeles, California. Frontier-Kemper Constructors, Inc. (FKCI) was engaged by the Los

    Jun 13, 2021