Search Documents

  • CIM
    Improving Uranium Processing With Membrane Systems

    By Georges Croisé, Les-Lee Thompson, Adrien Debergé

    Membrane filtration systems have regained focus in recent years as an effective means of liquid-liquid separation to increase the concentration of valuable elements, recover reagents or remove impurit

    Jan 1, 2020

  • CIM
    Development And Demonstration Of A Novel Elution Process For Chloride Tolerant Uranium Ion Exchange

    By J. E. Quinn, S. Wolstencrof, K. H. Soldenhoff

    Ion Exchange (IX) using Strong Base Anion Exchange (SBA) resins is conventionally used to purify uranium from sulfuric acid pregnant leach solutions (PLS), particularly when uranium grades are relativ

    Jan 1, 2020

  • CIM
    Recovery Of Vanadium As A By-product In The Acid And Alkaline Processing Of Uranium Ores

    By K. E. Prince, S. Burling, R. J. Ring, M. K. Maley, W. R. Taylor

    Vanadium occurs as a component of carnotite, which commonly occurs in calcrete type ores, and in association with uranium in some sandstone-hosted deposits. Increasing demand for vanadium, which is us

    Jan 1, 2020

  • CIM
    The Optimization Journey Of The Harmony Gold’s South Uranium Plant Operation And The Uranium Contribution To The Gold Operation As A By-product

    By R. Jacobs, R. E. L. Pobe

    The Moab Khotsong Metallurgical Complex comprises a gold recovery circuit (Noligwa Gold Plant) and a uranium recovery circuit (South Uranium Plant). The metallurgical complex employs the reverse leach

    Jan 1, 2020

  • CIM
    Nexgen Energy’s Arrow Deposit, Southwestern Athabasca Basin, Saskatchewan: A Geostatistical Approach To Deposit Development

    By Troy Boisjoli, Sean Hillacre, Matt Batty

    Discovered in 2014, the Arrow Uranium Deposit has undergone rapid development through successive drilling programs informed by geostatistical drill hole spacing studies. An independent third-party geo

    Jan 1, 2020

  • CIM
    Reducing Risk From First-of-kind In-situ Recoveryfor The Athabasca Basin

    By Jared Onyirimba, Jim Viellenave, Hal Demuth, Dale Verran, Chad Sorba, Errol Lawrence, David Bronkhorst

    As outlined within the Denison Mines Corp’s (“Denison”) Pre-Feasibility Study ("PFS") completed in late 2018, additional work is required to increase confidence and reduce risk associated with the app

    Jan 1, 2020

  • CIM
    Process Scale-up For Uranium, Mercury And Cesium Recovery From Surrogate Radioactive Cemented Waste

    By A. Demers, M. Chapman, N. Reynier, R. Lastra, M. Courchesne, C. Laviolette

    Historic medical isotope production at Canadian Nuclear Laboratories (CNL) in Chalk River involved the dissolution of irradiated isotope targets prior to extraction of Mo-99. This process generated li

    Jan 1, 2020

  • CIM
    Alkyl Arsines And U

    By J. Gogal

    Cameco's Cigar Lake Operation (CLO) started commercial uranium ore production in 2015. Initial mining was focused in areas of the ore body with relatively low concentrations of elements of concern (EO

    Jan 1, 2020

  • CIM
    Radium In Mining Effluents: Promising Water Treatment And Environmental Monitoring

    By J. Schick, V. Granger

    Nowadays, all French former uranium mining sites are remediated and redeveloped. If needed, mining waters containing radium have to be treated before discharged into the environment. Classical radium

    Jan 1, 2020

  • CIM
    Athabasca Basin Proterozoic Unconformity Uranium Deposits: Alteration, Deposit Geometry And Lithostructural Setting

    By A. Aubin, H. Yang, G. Zaluski

    The Athabasca Basin of northern Saskatchewan and Alberta is an exceptionally rich metallogenic region, hosting more than 2.8 B lb U3O8, of which over 927 M lb U3O8 have been mined out since extraction

    Jan 1, 2020

  • CIM
    Two-stage Counter-current Leaching Of Uranium Ore From Global Atomic’s Dasa Project

    By J. A. Brown, F. P. Kerr, M. A. Archer

    Extensive testwork on Global Atomic’s Dasa Project in Niger has been conducted at SGS Minerals laboratory in Lakefield, Ontario. Much of this testwork has focused on a two-stage counter-current leach

    Jan 1, 2020

  • CIM
    Technical Advancements Towards Achieving 1500 T/a Production Rate At The Honeymoon Isr Operation

    By A. Rao, J. A. Davidson, B. L. Jones, K. W. Bowes, D. Craib

    Supported by ANSTO, Groundwater Science and Inception Consulting Engineers, Boss has embarked on a series of technical projects aimed at reinforcing the Project’s capability to meet its export permit

    Jan 1, 2020

  • CIM
    Improving Pumping Capacity And Reliability In The Mcclean Lake Leach Circuit

    By J. Aydt, W. McCombe, H. McLaughlin, L. Nightingale-Mercer

    The McClean Lake mill is located approximately 850 kilometers north of Saskatoon, Saskatchewan, Canada and is operated by Orano Canada Inc. (Orano). The mill was designed to process high grade uranium

    Jan 1, 2020

  • CIM
    Uranium Mine Remediation In Northern Australia

    By Peter Waggitt

    Northern Australia has been home to uranium mining for over 70 years, more or less continuously. In the early days, post World War 2, there was little effort made to remediate workings at the end of o

    Jan 1, 2020

  • CIM
    Determination Of Radium In Uranium Mill Effluents By Icp-ms

    By Mike Broczkowski, Laura Dewhirst, Kieran Large, Angelo R. Fernando, Heather Daigneault, Jim Johnson, Randy Wiens

    The radioactive isotope radium 226 is a contaminant of potential concern in effluent waters from metal mining operations in Canada. Acceptable release levels of radium 226 are governed by Metal and Di

    Jan 1, 2020

  • CIM
    Steel From Uranium?

    By Mike Dry, Rod Dry

    If humanity is truly serious about reducing emissions of carbon dioxide into the atmosphere, today’s power plants burning fossil fuels will have to be replaced by power plants that do not emit CO₂. Un

    Jan 1, 2020

  • CIM
    The Free, Prior, And Informed Consent (Fpic) Provisions Of The United Nations Declaration On The Rights Of Indigenous Peoples (Undrip) And The Deployment Of Smrs In Northern Canada - A Review Of Potential Challenges

    By Horatio Sam-Aggrey, Margot Hurlbert

    Small Modular Reactors (SMRs) have been touted as having the potential to spearhead a nuclear renaissance. Proponents of this view cite the relative advantages of SMRs over larger nuclear plants as re

    Jan 1, 2020

  • CIM
    Best Practices In Drying And Calcining Of Yellowcake

    By S. Kashani Nejad, M. Bellino, K. Collins, C. Tovee, J. Godwin

    Motivated by safety considerations, logistical issues, transportation cost savings, product diversification, and marketing preferences, several uranium producers are revisiting their business models a

    Jan 1, 2020

  • CIM
    Safe Usage Of Hydrogen Fluoride In Fluorination Systems

    By K. Adham

    Both the dry and the wet fluorination systems require hydrogen fluoride (HF) for the process of uranium conversion to uranium hexafluoride (UF6). The dry methods depend on the electrolysis of HF to ge

    Jan 1, 2020

  • CIM
    Material Characterization – An Absolute Mustfor Predicting The Flow Behaviour Of Your Hazardous Material

    By C. Holmes, T. Holmes

    Engineered-in material handling problems are responsible for significant unrealized value in mineral processing plants. At the root, is a lack of awareness and understanding of bulk material handling

    Jan 1, 2020