Search Documents

  • CIM
    Jump-Start Your Safety Culture by Changing Environment Perception

    By A. Valdivieso

    Reducing accident rates keeps getting more and more complex as the usual tools enter a curve of diminishing results. Fortunately, nothing modifies behaviour in a stronger and wider way than having a r

    Jan 1, 2019

  • ISEE
    Using Digital Electronic Detonator of Blasting LS and LDT Buildings

    By Zheng Deming, Li Hongwei, Lei Zhan, Dai Chunyang

    This paper introduces the application of a digital electronic detonator in the demolition blasting of largescale (LS) and long delay time (LDT) frame-shear structure buildings. The whole building to b

    Jan 1, 2019

  • CIM
    The Simulation and Analysis on Die Casting Process of Copper Rotors

    By Mi, Dong Liang, Jingyuan Bai, Victor Zhou, Xujun

    Squirrel cage induction motors are the mostly used motors at present. Currently, the rotors of the squirrel cage induction motors are produced by aluminum die casting technique with the advantages of

    Jan 1, 2019

  • CIM
    The First Electrolytic Copper Refinery in the USA at the Chemical Copper Co. Phoenixville, Pa – History Revisited

    By E. Wraith, W. W. Culver, B. Wesstrom, P. J. Mackey

    Electrodeposited copper of the 1860s was of unprecedented purity, although the profound significance of this achievement was not fully realised until the dawn of the electrical age a decade or so late

    Jan 1, 2019

  • CIM
    Implementation of APC at Freeport-Mcmoran’s (FMI) Morenci Metcalf Concentrator

    By A. Supomo, H. Resendiz, C. Burbidge

    "Freeport-McMoRan Inc. (FMI) commissioned the expansion of the Morenci Metcalf concentrator in 2014. The concentrator included many design and equipment innovations, including the first-of-its-kind Me

    Jan 1, 2019

  • CIM
    Effective Mine Ventilation Management without Compromising Mine Health & Safety and Productivity

    By W. E. Oching, M. M. Ghomshei

    "Collaboration among Ventilation Engineers, Mine Inspectors, worker representatives, health and safety officers and management is key to an effective operational mine ventilation management. Mine vent

    Jan 1, 2019

  • CIM
    The Development of Pan American Silver’s La Colorada Shaft

    By Martin G. Wafforn, George J. Greer

    "In early 2014, Pan American Silver Corp. commenced a project to construct a second shaft at its La Colorada underground mine located in Zacatecas State in Mexico. This was the first new shaft develop

    Jan 1, 2019

  • CIM
    Environmental Upgrade at the Freeport McMoran Miami Smelter

    By Avi Nanda, Robert Brandt, Alex Piatkiewicz, David M. Jones

    In 2010 the United States Environmental Protection Agency (UESPA) revised the National Ambient Air Quality Standards (NAAQS) by lowering the permissible value to a 1-hour average SO2 concentration of

    Jan 1, 2019

  • CIM
    Shaft Sinking in the Next Five Decades / 2070

    By William M. (Bill) Shaver

    "The author will review the early history of shaft sinking as well as focus on the improvements made in shaft design and construction over the last fifty years (1970 to 2019) to predict how shaft sink

    Jan 1, 2019

  • ISEE
    Delineating Extent of Cracks in Post-Blast Rock Surface Using GPR – A Case Study

    By Sayantan Chakraborty, Kaushik Dey, SaKaushik Dey tyabrata Behera

    Drilling and blasting is a popular excavation technique in the drift of underground mine. Faster completion of drift reduces the gestation period and thus longer blast pulls are attempted with longer

    Jan 1, 2019

  • SME
    Interpreting Backfill QA/QC Test Data: Do We Need an Industry Standard?

    By D. Stone, R. Pakalnis, B. Seymour

    Most mines using backfill routinely carry out quality control (QC) testing of backfill mixes with unconfined compression test cylinders. This is true for paste operations, hydraulic fill operations, a

    Jan 1, 2019

  • SME
    Intelligent Monitoring System for Improved Worker Safety during Plant Operation and Maintenance

    By D. Parks, A. Miller, M. McNinch, R. Jacksha, H. Nickerson

    Each year hundreds of mine workers are involved in machinery-related accidents. Many of these accidents involve inadequate or improper use of lockout/tagout (LOTO) procedures. To mitigate the occurren

    Jan 1, 2019

  • CIM
    Leaching Of Copper Flash Furnace Dusts with Weak Acid Bleed and Arsenic Precipitation as Scorodite and Arsenical Jarosite

    By A. Roca, G. Ríos, I. Ruíz, M. Cruells

    Flash Smelting Furnace (FSF) hot dust-laden is cooled in a waste heat boiler (WHB) and then dedusted in electrostatic precipitators (ESP’s) before being treated, together with the Peirce Smith Convert

    Jan 1, 2019

  • CIM
    Aging Properties of Cu–0.93 Mass%Ni–0.24 Mass%P Alloy Tube

    By Wataru Inagaki, Kozo Kawano, Tetsuya Ando

    Cu–Ni–P alloys are the typical precipitation-hardening material. Thus, Cu–Ni–P alloys is expected to apply alternative materials for heat-exchanger tubes. Therefore, it was investigated that the effec

    Jan 1, 2019

  • CIM
    Fan Inlet Air Velocity Profile and the Need for Carefully Designed Ductwork Systems

    By G. A. Gamble

    "The inlet air velocity profile of any surface mine ventilation fan is an important factor when designing the connecting ductwork from the mine shaft collar to the fan. Deficient fan performance can b

    Jan 1, 2019

  • SME
    Application of the Ground Response Curve for Understanding the Overburden Load Transfer Mechanism

    By Ihsan Berk Tulu, Ted Klemetti, Deniz Tuncay, Cicek Sena, Zhao Haochen

    "Analysis of Longwall Pillar Stability (ALPS) and Analysis of Retreat Mine Pillar Stability (ARMPS) treat the pillar as a passive structure that is designed to carry overburden dead-weight. This dead-

    Jan 1, 2019

  • CIM
    Integrated Experimental and Thermodynamic Modelling Study of the Multicomponent “Cu2O”-FeO-Fe2O3-CaO-SiO2-PbO-ZnO-Al2O3 System

    By V. Prostakova, M. Shevchenko

    The copper smelting gas / slag / matte / metal / solids system with the Cu-Fe-Ca-Si-O-S major elements has been a long-term focus of the present overall research program using integrated experimental

    Jan 1, 2019

  • SME
    Defining Blending Classes to Solve Open Pit Scheduling Problems

    By J. Gonzales

    For this paper, blending is conceived as a linear process that takes a proportion from one stockpile or location and mixes it with another proportion from another stockpile or location, with the aim o

    Jan 1, 2019

  • CIM
    The Largest Fully Lined Blind Bored Ventilation Shaft Constructed to Date in Australia

    By Michael Boyle, John Zeni

    "The Blind shaft boring method is a mechanised process of excavating large diameter vertical shafts downward from the surface. It is a rotary drilling technique eliminating any requirement for personn

    Jan 1, 2019

  • CIM
    Development of a Practical Renewable (Sustainable) Energy Efficient Cooling System and Strategy.

    By J. Fox, K. Kocsis

    "Planning for sustainable cooling potential requires protected space to successfully maintain chilled propylene glycol in storage until needed. Stored propylene glycol should be judiciously cared for,

    Jan 1, 2019