Search Documents

  • AUSIMM
    Inadequate Water Management Planning Resulting in Long-term Closure Liabilities

    By H J. J Boshoff

    Mine closure planning integrated into life-of-mine (LOM) planning during the operational phase consists of many subcategories. One of these subcategories that needs to be fully integrated into the LOM

    Jul 16, 2014

  • AUSIMM
    A Dynamic Sediment Simulation to Predict the Variability of Suspended Solids Concentrations over Life-of-Mine for Application to a Risk-based Environmental Assessment

    By M Ind, B Usher

    Environmental regulators are increasingly adopting risk-based approaches to protect aquatic ecosystems. The Australian and New Zealand Environment and Conservation Council (ANZECC) and the Agriculture

    Jul 16, 2014

  • AUSIMM
    Mining in Morobe, Papua New Guinea – Impacts, Assurance and Self-determination

    By C Roche, G M. Mudd

    The Morobe Province of central Papua New Guinea (PNG) has been mined for gold for nearly a century, although it is only in the past decade that large-scale modern mining commenced. The Hidden Valley g

    Jul 16, 2014

  • AUSIMM
    Treatment and Rehabilitation of Acidic Waste Rock and Tailings – A 14-year Case Study

    By D Blair, T Scutts, L Fergusson

    This paper presents a waste rock treatment and rehabilitation program conducted at a metaliferous mine site in northern New South Wales from 2000–2013. It updates findings from 2005 for Program #1 (wh

    Jul 16, 2014

  • AUSIMM
    Topsoil Management for Long-term Mine Operation and Closure – A Case Study from Alcoa's Bauxite Mining Operations in South-west Australia

    By A Grigg, L Hackett

    Alcoa operates two bauxite mines at Huntly and Willowdale, located within the jarrah forest south-east of Perth in Western Australia. Ore reserves are shallow but extensive, and mining pits averaging

    Jul 16, 2014

  • IIMP
    Planes y estrategias para el cumplimiento de los ECA de suelos

    By Walter Díaz Cartagena

    El suelo es uno de los recursos más importantes del agua -en tanto sustenta la vida natural y fuente de alimento para toda la especie terrestre. Por tal motivo, el presente texto señala los planes y e

    Jul 1, 2014

  • IIMP
    Optimización de estrategia de mantenimiento para cargadores frontales LHD en la mina El Teniente

    By Gino Merello

    Dado que los cargadores frontales LHD son los equipos encargados de extraer gran parte de la producción en la mina subterránea El Teniente, se justifica el estudio de confiabilidad, mantenibilidad y

    Jun 1, 2014

  • CIM
    CIM Definition Standards for Mineral Resources & Mineral Reserves

    By CIM Standing Committee

    The CIM Definition Standards on Mineral Resources and Reserves (CIM Definition Standards) establish definitions and guidance on the definitions for Mineral Resources, Mineral Reserves, and mining stud

    May 10, 2014

  • IIMP
    Uso de ?18O como indicador espacial en el yacimiento aurífero Poderosa - Pataz

    By Carlos Oré Sánchez

    La exploración minera desarrollada en el yacimiento de Poderosa- Pataz conlleva un mejor conocimiento de los controles y la metalogenia de la región. En ese sentido, el presente texto señala el uso de

    May 1, 2014

  • IIMP
    Aplicación e impacto del entrenamiento virtual en la industria minera chilena

    By Dante Santony

    La empresa Pixis desarrolla para la SCM Miner Lumina Ccoper Chile, la creación virtual de treinta procedimientos de operaciones y mantenimiento de sus plantas de proceso. En ese sentido, el presente

    May 1, 2014

  • AUSIMM
    Managing the Margin at Norseman, Western Australia – A Case Study

    By B P. Micke

    Central Norseman Gold Corporation was established in 1935 and has been mining on the Norseman field in Western Australia since then. It is Australia’s longest continuously operating gold mining operat

    Mar 24, 2014

  • AUSIMM
    Structural Analysis of Acoustic Televiewer Logs for Large Diameter Raise Bored Shafts

    By R M. Stephenson

    Large diameter raise boring is a common raise excavation method in the Australian mining industry. Geotechnical investigations were conducted on several large diameter raise bore projects at Gwalia Mi

    Mar 24, 2014

  • AUSIMM
    Feasibility Studies – What Should Be Considered in Terms of Ventilation

    By J Kok

    "In some underground mines it has been observed that the primary focus during feasibility studies is to determine the best way to mine the defined orebody. Some studies have been conducted without suf

    Mar 24, 2014

  • AUSIMM
    The Application of Safescape Ladders at the Cracow and Golden Grove Operations

    By B Hawkins, S Durkin, V Lawrence

    The requirement for secondary egress from underground workings has long been regulated in Australia. Escape way systems have evolved from simple airleg rising ladders and timber ladders to steel galva

    Mar 24, 2014

  • AUSIMM
    An Overview of Surface Rock Support for Deformable Ground Conditions

    By M P. Sandy, V Louchnikov, V Eremenko, M Orunesu, O Watson

    "Surface support is a key component of most ground support systems which are applied as a means of reducing the risk of rockfall occurrence and maintaining serviceability of mine development. Surface

    Mar 24, 2014

  • AUSIMM
    Continuous Remote Emissions Monitoring – The Lynchpin for Air Quality Management

    By F I. Cox, D Peeler, T Bodisco

    "Diesel particulate matter (DPM), in particular, has been likened in a somewhat inflammatory manner to be the ‘next asbestos’.From the business change perspective, there are three areas holding the in

    Mar 24, 2014

  • AUSIMM
    Challenges of Developing a Ventilation Shaft in Kalahari and Karoo Formations, Northern Cape, South Africa

    By N C. Steenkamp

    The Northern Cape Province of South Africa is host to the Kalahari Manganese Field (KMF). The northern portion of the KMF hosts high-grade manganese referred to as Wessels’ type ore and is mined mostl

    Mar 24, 2014

  • AUSIMM
    Will Your Mine Require Cooling?

    By A S. Derrington

    In some parts of Australia, mine air cooling may not be needed until a depth of 1300 m below surface is reached. In other locations, it may be essential at a depth of only 300 m below surface. The rea

    Mar 24, 2014

  • AUSIMM
    One Mile Underground – Mining the N3500 Orebody at Mount Isa Mines

    By I Özen, G Chitumbura

    A paper identifying anticipated challenges in the extraction of the N3500 Orebody at Glencore Xstrata Copper’s Mount Isa Copper Operations was written in 2007. The paper identified the depth of the de

    Mar 24, 2014

  • AUSIMM
    An Investigation of Expanding Split Sets in Weak Ground

    By G Davison, C Rossimel, M Bouazza

    Expanding rock bolts anchor within a rock mass more efficiently than non-expanding varieties. This is of great importance in weak ground conditions, where grouted friction bolts perform less efficient

    Mar 24, 2014