Search Documents

Sort by

  • CIM
    Arsine Risk Management at CCR’s Electrolyte Purification Plant

    By A. Majumdar, B. Servière, H. Persson

    The CCR refinery, which was built in 1931, treats both internal and third party copper anodes to produce 325,000 mt of copper as cathodes. These anodes contain high levels of impurities, such as Ni, A

    Jan 1, 2019

  • SME
    Dry Beneficiation of High Silica Blue Dust –Turning Waste to Wealth

    By G. E. Sreedhar, R. Kumar

    The pockets of high silica blue dust across the entire high grade hematite deposits in the Bailadila sector bothers the excavation activity due their iron content, which is higher than the threshold v

    Jan 1, 2019

  • SME
    Exploration of Petrographic, Elemental, and Material Properties of Dynamic Failure-Prone Coals

    By Lawson. Heather

    "The purpose of this study is to explore how the geochemical and petrographic components of coal may impact its physical properties, as well as how these components correlate with a history of reporta

    Jan 1, 2019

  • CIM
    Tire-Rim Interactions and Predictions at High G Loading

    By T. G. Joseph, M. Bolster, M. Curley

    "High tirerim loading on haul trucks operating on rough ground frequently manifests as mechanical separations and rim base cracking caused by cyclic fatigue. This paper provides an understanding of th

    Jan 1, 2019

  • CIM
    Effect of Cold Working on Microstructure and Performance of CuCrZr Alloys

    By H. Huang, H. M. Chen, W. B. Xie

    Cu-0.8Cr-0.1Zr alloy were prepared by atmospheric melting. the microstructure and properties of the CuCrZr alloy after first cold rolled, solid solution, second cold rolled and aging treatment were an

    Jan 1, 2019

  • SME
    Sustainable Change of Coal Mining Regions

    By J. Kretschmann

    According to the model of product life cycles, the global coal mining industry is in the stagnation phase. The coal demand of the main consumer, China, has peaked in 2013 and is slowly declining. The

    Jan 1, 2019

  • SME
    Selection of Vibrating Screens for Mineral Separation Based On Process, Design and Implementation Criteria

    By M. Woodie

    INTRODUCTION Information such as application review to choose the proper style of vibrating screen, parameters that determine the proper size of vibrating screen, engineering design information that

    Jan 1, 2019

  • SME
    Optimize Fragmentation with Split-Shovelcam

    By C. Rodriguez, T. BoBo

    Comminution, being the energy intensive part of a mining operation receives much scrutiny by cost controllers, CEO’s, investors and others as the mining industry goes “back to basics” to reverse the d

    Jan 1, 2019

  • CIM
    Underground Booster Fan Placement Strategies

    By Euler De Souza, Kyle Penner

    "Booster fans play an important role in assisting main fans by boosting the air pressure of the ventilation air passing through it. The correct placement of underground booster fans in a mine is a cri

    Jan 1, 2019

  • CIM
    Case Study - Ventilation Duct Criteria Pros and Cons How to Effectively Lower Operating Costs during the Tender Process

    By J. Holtzhausen

    "An analysis of operating costs for underground mining operations in the current global economic climate considers the financial burden for a ventilation system to be in vicinity of 30–50%. These oper

    Jan 1, 2019

  • SME
    Secondary Support Instrumentation in Longwall Ventilation Entries

    By Erik Westman, Benjamin Mirabile

    "Ongoing research is being conducted to evaluate secondary support performance in longwall ventilation entries. In a three-entry longwall gateroad, secondary supports are applied in the #2 entry to ma

    Jan 1, 2019

  • CIM
    Unsustainability of Very Large Gold Producers—12 Years Later

    By H. R. Bullis

    "A 2003 paper discussed the idea that as gold mining companies grow larger it becomes more difficult for them to discover or acquire new gold deposits large enough to replace extracted reserves on an

    Jan 1, 2019

  • CIM
    Coal Mine Rock Dust Dispersibility Tests after Absorbing Moisture

    By R. C. Gilmore, J. F. Brune

    "Pulverized limestone rock dust used in United States underground coal mines to prevent and suppress coal dust explosions must easily disperse by forces of a methane or coal dust explosion. Moisture i

    Jan 1, 2019

  • CIM
    Microstructure and Mechanical Properties of Copper-Graphite Composites Fabricated by In-Situ Reaction Method

    By Sangjian Zhang, Zhu Xiao, Lairong Xiao, Rushi Chen, Mei Fang, Zhou Li

    The copper-graphite metal matrix composites were fabricated by two different production methods: directly sintering with copper and graphite (Cu-Gr composite), and in-situ sintering with cuprous coppe

    Jan 1, 2019

  • SME
    Agent-Based Optimization for Truck Dispatching in Open-Pit Mines

    By V. A. Temeng, M. Owusu-Tweneboah, K. Awuah-Offei

    The mining industry has long recognized the value of dispatch systems in open pit mines as they reduce load and haul costs. Over the years, researchers have proposed many dispatch systems with various

    Jan 1, 2019

  • ISEE
    Transforming Underground Blasting Operations into Primary Crushing Operations

    By Christopher Jon Preston, Troy Williams, Daniel Roy

    There has been significant progress made with narrow vein gold mines in which a second option for crushing has begun to attract attention. To ensure the profitability of a mine that has based its econ

    Jan 1, 2019

  • CIM
    Accurate Live Measurments for Shaft Aligment during Sinking or Shaft Remediation

    By G. Bonin, A. Jamal, G. Preciado, S. Gillis

    "Accurate, easy to obtain, and reliable methods of measurement are the cornerstone of shaft and tunnel developments - during their sinking, operation and maintenance, or in some cases, remediation. Th

    Jan 1, 2019

  • CIM
    Full Face Blasting in a Frozen Shaft

    By Micheal Mayhew

    "This presentation will provide information and facts on the drilling and blasting within a frozen shaft using a full face methodology. The Author will briefly discuss the history of the sinking of a

    Jan 1, 2019

  • CIM
    Breaking Down Traditional Silos - A Refreshing Approach to Mine Optimization for the Restart of the North American Lithium Project

    By E. Pallumbo, N. Szwedska, R. Asselin

    "This paper highlights the results of collaboration between geology, mining and mineral processing teams during the restart of the North American Lithium Project, located near La Corne, Quebec, Canada

    Jan 1, 2019

  • CIM
    Mechanical Behavior and Strengthening Mechanism of Discontinuous Precipitation in Cu-Ni-Mn Alloy

    By W. B. Xie

    The hardening behaviour and microstructure evolution of Cu-30Ni-30Mn alloys aged at 350 °C has been investigated utilizing optical microscope, scanning electron microscope, transmission electron micro

    Jan 1, 2019