Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Removal of arsenic and metal ions from acidic effluents via the Fenton reaction methodBy Y. Wang
Arsenic-bearing acidic effluent from hydrometallurgical processes contains many harmful metal ions and must be appropriately treated before discharge. In the present study, arsenic, copper, zinc, alum
Aug 3, 2023
-
Mechanism and control of deformation in gob-side entry with thick and hard roof strataBy I. Ngo, L. Q. Ma, J. S. Guo
Deformation of gob-side entries has always been a critical concern for ensuring stability in longwall coal mines. This paper addresses the significant deformation and support challenges that arise in
Aug 3, 2023
-
Grinding Contribution and Quantitative Separation of Impact and Grinding Mechanism in Cylindrical Mill - Mining, Metallurgy & Exploration (2023)By Zong‑yu Li, Shao‑jian Ma, Xiao‑jing Yang, Jin‑lin Yang, Xing‑nan Huo, Heng‑jun Li
Optimizing and adjusting the particle size composition of grinding products is of great significance for improving economic benefits and resource recovery and utilization. In this study, grinding cont
Aug 3, 2023
-
Online Analysis of Malachite Content in the Beneficiation Process Based on Visible-NIR Spectroscopy and GWO-SVM Algorithm - Mining, Metallurgy & Exploration (2023)By Weiran Zuo, Jinsheng Guo, Chun Yu, Jinyu Zhan, Bao Guo
High-precision prediction of the target minerals’ content in the feed and concentrate products is vitally important for the efficient beneficiation of mineral resources. Visible and near-infrared (NIR
Aug 3, 2023
-
Incorporating the true costs and opportunities of rehabilitation and closure in project selection, design and approvalsBy C Tomlin, C Gimber
Historically, key closure risks have been studied during operations and then further assessed as cessation of mining approaches. Only in the past couple of decades or so has progressive rehabilitation
Aug 2, 2023
-
Design and calibration of a climate resilient Type B (adapted) sediment basin at the Dugald River Mine in the north-west Queensland minerals provinceBy A Harburg, A Dendys, G Green
Dugald River Mine (DRM) is located approximately 85 km north-east of Mount Isa, and 65 km northwest of Cloncurry, in the north-west Queensland Minerals Province of Australia. DRM is an underground ope
Aug 2, 2023
-
Risks beyond relinquishment – quantifying post-relinquishment management and maintenance costsBy M R. Lane, M L. Cramer, N P. Wines
Increasing attention is being focused by regulators and industry on the residual environmental liabilities associated with mining projects following site relinquishment (termed surrender in Queensland
Aug 2, 2023
-
Dynamic influences of optimisation on emissionsBy P J. Bangerter, J Pan
Optimising for Net Present Value (NPV) with a strategic optimiser such as COMET, Prober-E, Blaser or Minemax has hitherto lacked a dynamic method for analysing the so-called third-order outcomes (such
Aug 2, 2023
-
Climate change risks to mine closure – planning for a range of impactsBy N McIntyre, R Trancoso, N Bulovic
Mining is essential for facilitating human development particularly as demand for critical minerals grows. However, over the mine life cycle, the environment is permanently changed. Once mining ceases
Aug 2, 2023
-
The critical pool levels for the Yallourn Mine determined using the MGRI approachBy N Patel, S Narendranathan, T Mok, J Lowe
The Hazelwood Mine (HM) commenced operations in the 1950s and was originally operated by the State Electricity Commission of Victoria (SECV) prior to it becoming privatised. ENGIE, the current owners
Aug 2, 2023
-
Exploring the applicability of responsible research and innovation for mine transitionsBy S Worden, A Lee Zhi Yi, E Sellers, G Corder, A Littleboy
The global shift towards decarbonisation is driving competition for the extraction of critical minerals such as nickel, lithium, and copper. To meet this demand, new mines are being developed while mi
Aug 2, 2023
-
The role of scale in prediction of mine drainage chemistryBy N McIntyre, M Edraki, K R. Jain
From the very early stages of a mining project, there is a requirement to predict the chemistry of potential drainages from various waste storage facilities. However, using relative masses to scale ch
Aug 2, 2023
-
Queensland’s open cut coalmine void rehabilitation planning practices – challenges and opportunitiesBy M Clay, J Dunlop
Thermal and metallurgical coal mining in Queensland has resulted in mines which contain voids due to open cut mining. While there are several proposals for greenfield coalmines or expansions to existi
Aug 2, 2023
-
Developing a regional data catalogue to support the technical assessment of post-mining land useBy C M. Côte, P Bolz, L Pagliero, M Edraki, M Shaygan, P Erskine
Mines in Queensland must now prepare a Progressive Rehabilitation and Closure (PRC) plan, with the requirement to justify the selection of the post-mining land use (PMLU) for each rehabilitation domai
Aug 2, 2023
-
Polymer-amended tailings dewatering technology for desired closure outcomesBy T Baumgartl, A Costine, B Boshrouyeh, M Edraki
In mineral processing, the management of tailings may become increasingly more challenging with a change of ore type and the quality of water used in the plant. This, in turn, may affect the overall c
Aug 2, 2023
-
Viable and feasible decarbonisation – Tent Mountain coalmine repurposing for the clean energy economyBy B D. Saffron
In 1983, open cut coal mining operations were suspended at the Tent Mountain coalmine, located in Alberta, Canada in an area called Crowsnest Pass. Montem Resources (‘Montem’), an Australian mining co
Aug 2, 2023
-
Assessing the effectiveness of erosion predictions from a landform evolution model with field observations from a rehabilitated landformBy G R. Hancock, M J. Saynor, J B. C Lowry, T J. Coulthard
Landform evolution models (LEMs) can assess the effectiveness of landform designs applied to a rehabilitated landform by predicting where erosion may occur. Here, we compare erosion predictions produc
Aug 2, 2023
-
Management of riverine disposal of tailings and waste rock for AMD control at the Ok Tedi copper-gold mineBy S Davidge, J Pile, R Schumann, E Kepe, W Stewart, M Ridd, B Rathi
Geographical constraints, including steep terrain and high rainfall, at the Ok Tedi copper-gold mine in PNG’s Western Province present Ok Tedi Mining Limited (OTML) with significant challenges in mine
Aug 2, 2023
-
Cobalt, copper tailings and the circular economy – a case study from the Capricorn Copper Mine, north-west Queensland minerals provinceBy L Nicholls, A Parbhakar-Fox
Reprocessing Queensland’s historical copper tailings for critical minerals is an opportunity to circularise the state’s mining industry by converting waste liabilities into assets. Mine waste valorisa
Aug 2, 2023
-
Can biocements stabilise tailings storage facilities?By G Simpson, S Dressler, A E. Levett
Tailings storage facilities often represent a mining operation’s most significant liability, posing serious environmental, social and safety risks. Almost all mining operations dispose of wet tailings
Aug 2, 2023