Search Documents

Sort by

  • SME
    Cracking The Code—Assessing Implementation In The United States Of The Codes Of Practice For Risk Management Of Tunnel Works

    By Terry W. Mellors, Robert J. F. Goodfellow

    The underground industry has been forced to reconsider risk management sincethe introduction and implementation of the “Joint Code of Practice for Risk Management of Underground Works in the UK” publi

    Jan 1, 2007

  • AUSIMM
    General Management and Risk Management

    The current talk of risk management as a separate discipline and management function is like earlier imposition of Quality Control (QC) as an overlay on shoddy production management. Risk management i

    Jan 1, 2007

  • NIOSH
    Determining the Spatial Variability of Personal Sampler Inlet Locations

    By Robert Vinson

    This article examines the spatial variability of dust concentrations within a coal miner?s breathing zone and the impact of sampling location at the cap lamp, nose, and lapel. Tests were conducted in

    Jan 1, 2007

  • CIM
    Transforming Flash Furnace Feed and Burner Stability: Optimizing Furnace Performance and Productivity

    By P. E. Walker, M. E. Reed, R. C. Sims, B. Snowdon, D. E. Fallas

    An advanced Flash Furnace feed system is the key to improving furnace performance. Clyde-WorleyParsons has developed a revolutionary pulseless pneumatic injection feed system technology, capable of de

    Jan 1, 2007

  • CIM
    Using Lca To Support Decision-Making And Sustainable Plant Design In Primary Copper Production

    By M. H. Ali

    Codelco, a multi-process primary copper producer, is undertaking a full life cycle inventory (LCI) of all its commercial products based on copper and molybdenum. During this work, many questions have

    Jan 1, 2007

  • SME
    Measuring What Matters: Monitoring The Contribution Of A New Mining Project To Community Sustainability

    Ravensthorpe Nickel Operation (RNO) is a major new mine and processing plant currently being constructed by BHP Billiton in a ?green field? site near the small town of Ravensthorpe, about 150 km west

    Jan 1, 2007

  • SME-ICGCM
    Using Major Hazard Risk Assessment to Appraise and Manage Escapeway Instability Issues: A Case Study (d1d3dd49-2f0a-44af-8ddf-69de3f441c2d)

    By Anthony Iannacchione

    A Major Hazard Risk Assessment (MHRA) was developed in Australia after a series of mine disasters in the 1990?s. A MHRA is used to help prevent major hazards, i.e. fire, explosion, wind-blast, outbur

    Jan 1, 2007

  • CIM
    Environmental and ventilation benefits for underground mining operations using fuel cell powered production equipment (0d6b8fbf-8199-4422-8088-a542f4b15d8b)

    By D. Eastick, S. Hardcastle

    "Over the last few years, a multi-faceted feasibility study has been evaluating the introduction of hydrogen fuel cell-powered equipment into underground mines to replaced diesel engine-powered equipm

    Jan 1, 2007

  • CIM
    Impact of Frother on Bubble Production and Behaviour in the Pulp Zone

    By C. Acuña

    The case is presented that the key role of frother is control of bubble size in the pulp zone. Compared to water alone, the addition of frother produces a narrower distribution and finer bubble size.

    Jan 1, 2007

  • SME
    Joint Ore Extraction And In-Pit Dumping Optimization

    By M. Zuckerberg, E. Mader, R. Pasyar

    We describe a new software product designed for the net present value optimization of multi-open-pit blended ore operations in which it is desired and/or necessary to dump some or all of the waste roc

    Jan 1, 2007

  • SAIMM
    Determination Of Optimal Cut-Off Grade Policy To Optimize NPV Using A New Approach With Optimization Factor

    By A. Bascetin

    One very important aspect of mining is deciding what material in a deposit is worth mining and processing, versus what material should be considered waste. This decision is summarized by the cut-off g

    Jan 1, 2007

  • DFI
    Geotechnical Challenges of Pile Driving in a Marginally Stable Slope Terminal 46 Apron Upgrade, Port Of Seattle, WA (18615664-0169-4e91-aa2b-8ec5994bb0a0)

    By Monique Nykamp

    "INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the

    Jan 1, 2007

  • CIM
    Determination of Strain during Hot Tearing in Aluminium Alloys by Digital Image Correlation

    By J. B. Mitchell

    Using digital image correlation the evolution of strain and strain at the onset of localisation resulting in a hot tear has been determined for alloys AA6111 and Al¬0.5wt% Cu during solidification. Hi

    Jan 1, 2007

  • AUSIMM
    Project-Finance Risks ù Due Diligence Matters

    Project-finance risk assessment is mature and approached systematically. Mining industry due diligence remains fragmented with specialists addressing different aspects of the project such as reserves/

    Jan 1, 2007

  • AUSIMM
    Validation of the AMIRA P9 Flotation Model Using the Floatability Characterisation Test Rig (FCTR)

    By J-P Franzidis

    The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant. It was developed as part of the AMIRA P9 project, primarily to determine ore floatabilit

    Jan 1, 2007

  • CIM
    Maximizing Value ? Promoting Materials Stewardship In The Minerals And Metals Sector

    By J. K. Atherton

    If the metals sector is to contribute successfully to sustainable consumption we must adopt principles and practices which address the entire life cycle of the materials we produce. Progress must be f

    Jan 1, 2007

  • DFI
    Geotechnical Challenges of Pile Driving in a Marginally Stable Slope TERMINAL 46 APRON UPGRADE, PORT OF SEATTLE, WA

    By Monique Nykamp

    "INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the

    Jan 1, 2007

  • AUSIMM
    Modelling of Dry Magnetic Separator by Artificial Neural Network at Gol-e-Gohar Iron Ore Mine

    By B Yeganeh, A Sam, A Kohsari

    The base of separation at Gol-e-Gohar iron ore plant (Sirjan in the south of Iran) is magnetic separation after milling. Magnetic separation in the plant is divided into two parts: dry magnetic separa

    Jan 1, 2007

  • SME
    Fog Mesh Studies For Fog Removal

    By A. Martikainen

    Field tests concerning a fog mesh method for fog removal are discussed. The first tests were performed at the Pyhäsalmi Mine, Finland. As this study gave promising results, further studies were compl

    Jan 1, 2007

  • SME
    Geology Of The Biwabik Iron Formation And Duluth Complex

    By Mark A. Jirsa

    The Biwabik Iron Formation is a ~1.9 billion year-old sequence of iron-rich sedimentary rocks that was metamorphosed at its eastern- most extent by ~1.1 billion year-old intrusions of the Duluth Comp

    Jan 1, 2007