  • ISEE
    Vibration Data Analysis to Increase Slope Adhesion

    By August Ferraz Ribeiro, Guilherme Dias Mendona, Paula Henrique Lisboa, José Silvio Corsini

    Correct slope adhesion is related to the conformity of the slope’s real geometry to slope planning. It is very important in mining because slope design has economic and safety implications. Slope desi

    Feb 6, 2023

  • ISEE
    Determination of Seismic Velocity from Quarry Blasts Using GPS Enabled Vibration Monitors

    By William. J. Birch, Catherine. E. Johnson, Robert Farnfield

    Rocks and other materials can be characterized by their elastic properties. However, seismic velocities represent a more practical set of physical properties for seismic methods. Seismic velocities de

    Feb 6, 2023

  • ISEE
    Case Study: Iterative Design Process of Presplitting in an Underground Overhand Cut and Fill Mine

    By David Porter, Nathan Rouse

    The implementation of presplit blasting has been widely utilized in open pit and underground tunneling. This case study works through the iterative process of developing a heading drill and blast desi

    Feb 6, 2023

  • ISEE
    Demolition Using Water-Cased Kicker Charges

    By Emily Johnson, Catherine Johnson, Rachel Bauer, Paul Pitzel

    Demolition projects involving explosives may incorporate cutting charges to sever columns in collaboration with kicker charges that “move” the columns out of alignment. Traditional kicker charges ofte

    Feb 6, 2023

  • ISEE
    More than Scratching the Surface – Capturing Blast hole Features to Improve QA/QC and Compliance to Design

    By Paul Klaric, Nicholas Bodley

    Every blasting engineer or professional can attest to the age-old conundrum of obtaining accurate hole information on a large scale prior to loading explosive charges in a blast hole. Even though the

    Feb 6, 2023

  • ISEE
    Floor Blasting for Establishment of a New Crusher in Underground Limestone Mine

    By Chris Searing

    An underground room-and-pillar limestone mine in Western Missouri acquired a new primary crusher, physically larger in every dimension than the unit it replaced. Due to the space constraints within th

    Feb 6, 2023

  • ISEE
    Electronic Initiation System in Fosterville Gold Mine Development

    By C. Zuniga, S. Combrinck, C. Peters

    Agnico Eagle Gold have partnered with Enaex Australia at their Fosterville gold mine to leverage a combination of drill and blast technologies to optimise underground development mining. The mine is t

    Feb 6, 2023

  • ISEE
    Encounter with Potential Acidic Sulphate Soil (PASS) and Bulk Emulsion Reaction in a South Africa Iron Ore Mine

    By Dirk Voogt, Quentin Steyl, D. Scott Scovira

    A South Africa iron ore mine reported a decline in blast performance and ore and waste fragmentation. Preliminary investigation by the explosives services company found that the straight gassed bulk e

    Feb 6, 2023

  • ISEE
    Reducing Impact on the Wall Generated by Blasting and Increasing Slope Design Adherence Using Controlled-Energy Explosives and Presplitting Technique

    By Orica Chile, Orica Brasil, Orica Brasil Victor Morais, Kinross Paracatu Leopoldo Muñoz, Kinross Paracatu Luis Marinho, Gubio Barsottini, Orica Brasil José Vergara, Lucas Steffen, Orica Brasil Washington Vilas

    In drill and blast activities, it has been a challenge to sculpt walls accordingly to what has been designed in state-of-art mining design software. Obviously, the perfection of making neat and smooth

    Feb 6, 2023

  • ISEE
    Measurement of the Vibration Delay Window for an Iron-Ore Mine

    By Maria Sullivan

    There have been many papers and articles presented over the last 60 years questioning the relevance of the 8-millisecond blasting delay window as an ‘Industry rule of thumb’. The concept of using dela

    Feb 6, 2023

  • ISEE
    Christmas Day 2020 VBIED Blast Investigation Findings and Damage Assessment of Nearby Historic Buildings in Nashville, Tennessee, USA

    By J. Mikhael Erekson, Connie Campbell Brashear, Brent Meins

    Christmas morning 2020, an IED in an RV was detonated along an evacuated section of downtown Nashville, Tennessee. The blast damaged over 40 buildings, including AT&T’s Main Central Office and caused

    Feb 6, 2023

  • ISEE
    Driving Continuous Improvement Through Blast Design Technologies in a Surface Quarry

    By Toby Forney, Joshua Schoonover

    In typical surface quarry operations, productivity and efficiency related to pit development begin with drilling and blasting efforts. By embedding technology within drilling and blasting operations,

    Feb 6, 2023

  • ISEE
    Implementation of an Integrated Quality Assurance and Control System Applied to High Complexity Blasting Open Pit

    By Regina Rocha, Miguel Humpire

    One of the challenges within unitary mining operations is blasting, which has a significant downstream impact on the following processes, which is why mining companies ensure the results of the blasti

    Feb 6, 2023

  • SAIMM
    A critical comparison of interpolation techniques for digital terrain modelling in mining

    By M. Z. Emad, A. Hassan, M. A. Raza, M. U. Khan, S. A. Saki

    Digital modelling of a surface is crucial for Earth science and mining applications for many reasons. These days, high-tech digital representations are used to produce a high-fidelity topographic surf

    Feb 6, 2023

  • ISEE
    Reactive Ground Learnings and Prevention

    By R. Jacob

    Mining has been around for a long time, and new deposits are being discovered continually but are becoming more complex for processing and typically sulfide in nature. Most of the large easy deposits

    Feb 6, 2023

  • ISEE
    Magnitude 2.8 Earthquake Caused by 90 Pounds (41 kg) Per Delay! Not So Fast

    By D. Rudenko, C. T. Aimone-Martin, J. K. Ratliff, I. G. Wong, J. Aiken, R. E. Burnham, T. A. Davidsavor

    A small quarry blast was conducted with a maximum of 90 pounds per delay and shortly afterwards, area residents sensed ground motion and building shaking indicative of an earthquake. In addition, seis

    Feb 6, 2023

  • ISEE
    Modular Ballistic Pendulum for Measurement of Impulse from Tamped Explosives

    By Roland Alford

    The ballistic pendulum is a well-established piece of test equipment originally developed for estimating the velocity of bullets and projectiles. When trying to understand the effects of different tam

    Feb 6, 2023

  • SME
    Novel Methods For Bastnaesite Concentrate Leaching

    By GRANT COLLIGAN, BROCK O’KELLEY, Corby Anderson

    With the world’s ever-growing push to expand technological capabilities, the need for specialized materials including rare earth elements has exploded. One source of rare earths found in the United St

    Feb 1, 2023

  • SME
    Application Of A Tech Innovation Model For The Mine Of The Future: Bridging The Gap Between Theory And Practice

    By Anastasia Xenaki, Edmundo Laporte, Antonio Nieto, Jesus Castillo Gomez, Oscar Velasquez

    It is particularly challenging for the mining industry to create and implement an efficient and adaptable mining innovation model to secure the continuous improvement of processes and products via tec

    Feb 1, 2023

  • SME
    Trends In Sec Comment Letters On Regulation S-k 1300 - SME Annual Meeting 2023

    By J. B. Offei, K. Awuah-Offei

    Mining companies registered with the SEC were required to comply with Regulation S-K 1300 for their annual report covering the first fiscal year ending on or after January 1, 2021. Consequently, most

    Feb 1, 2023