Search Documents

  • NIOSH
    MLA 10-86 - Mineral Resources Of The North Fork Owyhee River Study Area, Owyhee County, Idaho

    By Andrew M. Leszcykowski

    In 1984, personnel from the U.S. Bureau of Mines examined 41,550 acres of the North Fork Owyhee River Wilderness Study Area for mineral resources. This study area, in southwestern Idaho, is underlain

    Jan 1, 1986

  • TMS
    Flash Furnace Optimization

    By W. G. Davenport

    A flash furnace can be run many different ways. It can, for example, be operated with: (a) highly 02"enriched, ambient temperature blast and no fossil fuel (b) considerable fossil fuel and hot, sl

    Jan 1, 2001

  • NIOSH
    RI 7087 Transverse Force Produced By Tensioned Expansion-Shell-Type Rock-Bolt Anchors

    By Edward W. Parsons

    The transverse force developed by expansion-shell rock-bolt anchors on the wall of a drill hole as the bolt is tensioned was measured by the Bureau of Mines using a device specially designed and fabri

    Jan 1, 1968

  • AUSIMM
    Management of Change ù The Transformation of UK Coal Project 105

    In the UK during the 1990s the energy companies had developed a policy of æDash for GasÆ, building large natural gas power stations to produce more than 30 per cent of the UKÆs electricity demand. The

    Jan 1, 2005

  • CIM
    Comparison of liquid and resin ion-exchange processes for purification and concentration of uraniferous solutions

    By A. J. Brown

    This paper presents an economic evaluation of resin ion exchange and solvent extraction for the purification and concentration of uraniferous solutions derived from sulphuric acid leaching operations.

    Jan 1, 1979

  • CIM
    Bridging the Gap Strategy to Execution

    PERSPECTIVE ?Natural resources exploration, extraction and beneficiation is complex and challenging: ?Input costs rising, complexity increasing, rising stakeholder management needs, regulatory compl

    May 1, 2013

  • SME
    Improving The Plant Metallurgical Balance

    By Ronald L. Wiegel

    In a mineral processing plant there are a number of routine decisions which are based at least in part on the plant's metallurgical performance. Among these are those related to: 1) equipment f

    Jan 1, 1978

  • NIOSH
    RI 8519 Effects of Humidity on Salt Mine Dust: A Preliminary Report

    A preliminary study was conducted by the Bureau of Mines to determine the effect of humidity on salt mine airborne dust levels. Results showed less dust where the humidity was elevated. Dust reduction

    Jan 1, 1980

  • SME
    Policy to Practice: Strategic Environmental Assessment in the Real World

    By F. M. McEvoy, E. J. Steadman, R. Murfin

    In England, the provision of aggregate is determined by the historical relationship between construction and aggregate consumption. This approach does not necessarily lead to sustainable decision-maki

    Jan 1, 2005

  • TMS
    Lead Removal by Ion Exchange

    By P. Meyers, F. DeSilva, L. Gottlieb

    A number of tests looking at lead removal using ion exchange resins of various types from various aqueous streams have been undertaken. The tests focused on strong acid cation (SAC) and weak acid cati

    Jan 1, 2000

  • SME
    Activated Alumina For The Removal Of Selenium From Heap Leach Detoxification Solutions

    By R. W. Smith, K. A. Altman

    The use of activated alumina for the removal of selenium from heap leach detoxification solutions was studied at a laboratory scale. Three different aluminas were studied, one unmodified and two chemi

    Jan 1, 2003

  • AIME
    Suggestions to Institute Authors (1e3526c8-cee9-4385-8219-ebc21eef6d39)

    The primary purpose of the Institute is to advance the technologic and engineer-. in- arts embraced by it through inter¬change of knowledge. This can best be clone by the presentation and discussion o

    Jan 1, 1943

  • AIME
    Astute Salesmanship Turns Rocks And Minerals To Gold

    By H. T. Mulryan

    For the producer of industrial rocks and minerals, marketing is often the only means of survival. His material must be sold. There is little of the impersonal force of the market regulating supply and

    Jan 7, 1969

  • AIME
    Optimizing Ball Mill Liners For Production and Economy

    By David J. Dunn

    At a time when mill availability is at a premium, production costs are rising, and lead time for mill liner casting is a year or more, mill liner design is an important factor in ore grinding. Testing

    Jan 12, 1976

  • CIM
    Renewable Energy and Property Re-Use On Surface Mined Lands

    By George Carico

    Research and related demonstration projects are being conducted in West Virginia on both existing and former coal surface mine lands to determine potential post-mine land re-use options that offer the

    Aug 1, 2013

  • AIME
    Papers - Non-ferrous Metallurgy - Handling of Fine Ores and Concentrates in Salt Lake Valley Lead Smelters (With Discussion)

    By L. D. Anderson

    WHEN, after years of troublous experiences in roasting sulfide ores with heavy dust and fume losses resulting from the equipment and methods first available, there appeared on the scene of metallurgy

    Jan 1, 1929

  • AUSIMM
    TS5 Spreader as Part of the Secondary Overburden System at Loy Yang Open Cut

    In the future to excavate sufficient coal for power generation, two dredgers would be required to dig overburden or interseam 70010 of the time and three dredgers 40010 of the time. One overburden

    Jan 1, 1989

  • SME-ICGCM
    Rockbolting For Highly Stressed Roadways

    By Holger Witthaus

    The conditions of great mining depth and multi-seam¬longwalling require a special method of rockbolting, It can be described as a control loop which is based on the elements of planning, drivage and m

    Jan 1, 2000

  • SAIMM
    Evaluation of the sampling strategy for a copper ore

    By P. Gonzalez

    Minera La Parreña, S.A. de C.V., Milpillas operation is an underground mine designed to process 8 352 tons of ore per day for the recovery of copper through crushing, heap leaching, solvent extraction

    Jan 1, 2009

  • SME
    Enhanced Probe Drilling and Pre-Grouting Design and Recommendations on Hard Rock TBMs - RETC2023

    By Stryker Magnuson

    While probe drills are not strictly necessary for all projects, the incorporation and use of probe drills and pre-grouting adds capability and insurance to boring operations. Water ingress and unstabl

    Jun 13, 2023