Search Documents

  • IMPC
    Effect of Pretreatment Technology on Preparation of a-Calcium Sulfate Hemihydrate from Phosphogypsum

    By L. J. Li, Q. Zhang, Z. H. Liu, Q. L. Chen

    Phosphogypsum (PG) is an industrial waste from the production of phosphate fertilizer. The utilization of PG is restricted by its containing impurities, and the pretreatment is crucial to eliminating

    Jan 1, 2018

  • SME
    Defining Characteristics For Carbon Monoxide Concentration Versus Time Curve Following Blasting

    By K. A. Sauer

    Blasting can create severe interference for a mine's carbon monoxide based fire detection system. At the present time, without being able to differentiate between blast and non-blast carbon monox

    Jan 1, 1989

  • AUSIMM
    Strategic short-term geotechnical design

    By K T. Mandisodza, T J. Cartledge

    The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d

    Jun 22, 2022

  • NIOSH
    RI 2087 Necessity for Helium Conservation

    By George S. Rice, Li C. Ilsley.

    A remarkable explosion of fire-damp caused by a discharge of lightning at the new shaft at the Sitalpur coal mine, has been reported by the Chief Inspector of Mines of India, who gave the following de

    Feb 1, 1920

  • AIME
    Philadelphia Meeting, Metals Divisions

    By AIME AIME

    THE 1941 fall meeting of the Iron and Steel and the Institute- of Metal, Division held at the Ritz-Carlton Hotel, Philadelphia, during the first three days (Oct. 20-22) of the National Metal Congress

    Jan 1, 1941

  • CIM
    Argumentation of Geomechanics Applications Ultimate Solution

    By I. A. Kovalevska

    Considered problems: elaboration and implementation of resource-saving technologies, low-cost support systems improvement, openings security and support, based on wallrock condition control with supre

    Aug 1, 2013

  • CIM
    Evaluation of Secondary Crushing Prior to SAG Milling at Newmont?s Phoenix Operation

    By G. M. Castillo

    Newmont?s Phoenix mine started production in March of 2006. Due to the extreme hardness of the ore, the mill has struggled to meet throughput projections. Grinding studies showed that optimizing the e

    Jan 1, 2012

  • ABM
    Process Improvement Through Real-time Analysis

    By Luke A. Balzan

    Access to information is a key component for making improvements to any process. This is particularly true for all aspects of the iron mining and steelmaking process. The ability to make rapid control

    Aug 17, 2017

  • TMS
    Analysis Of Sulfidation Routes For Processing Weathered Ilmenite Concentrates Containing Impurities

    By Warren J. Bruckard, Mark I. Pownceby, Sazzad Ahmad, M. Akbar Rhamdhani

    Rutile is the preferred feedstock for producing high-grade TiO2 pigment but due to decreasing resources, alternative materials such as ilmenite is now used to produce a synthetic rutile (SR) feedstock

    Jan 1, 2015

  • TMS
    Recovery Of Gold From Thiosulfate Solutions And Pulps With Ion- Exchange Resins

    By Michael J. Nicol

    Growing environmental and occupational safety concerns about the use of cyanide in gold processing has increased the interest in more acceptable alternatives. The most likely of these is thiosulfate.

    Jan 1, 1998

  • CIM
    MEMO 2010 Canadian Mining Credentials Program

    By Barbara Kirby

    Mining Industry Human Resource Council Who we are: National Sector Council for the Minerals and Metals Sector 18-person Board of Directors Over 100 Industry Volunteers PPP - Funded by HRSDC and i

    Oct 1, 2010

  • AIME
  • DFI
    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • IMPC
    Thermo- and Hydrochemical Modification of Solid Minerals Containing Argillaceous Varieties

    By I. D. Ustinov, V. A. Arsentyev, A. O. Mezenin, A. M. Gerasimov

    "The solid mineral raw materials of the sediment deposits containing the argillaceous variations such as the coal and the potash ores are the most multi-tonnage solid minerals mined and processed in t

    Jan 1, 2018

  • IMPC
    Pressure Leaching Of Indian Coals At Elevated Temperature For Producing Low Ash Clean Coal

    By P. S. Dash

    With implementation of stringent environmental regulations, ultra clean coal technology development programs have gained significant importance worldwide. As far as Indian scenario is concerned, most

    Sep 1, 2012

  • SME
    Bleed Off Characteristics Of Anchor Shell -A New Look

    By K. F. Unrug

    The concept of bolting mine roofs to prevent roof falls was initiated in the 1950's and was quickly accepted by the mining industry because it was inexpensive, effective and convenient. The princ

    Jan 1, 1991

  • ISEE
    New Model for Realistic 3D Blast Simulation

    By Thierry Bernard

    To be able to precisely predict the result of a mine blast before pressing the button is a goal for many blasters due to the environmental and economic constraints of our century. Based on the fundame

    Feb 1, 2020

  • IMPC
    Determination of Activity Coefficients for Bioleaching Liquid Solution with Bacteria by Ion Selective Electrode

    By M. L. Liu

    This work reports the results about the determination of mean activity coefficients and relative partial molar free energies for copper sulfide mineral bioleaching solutions by potentiometric method a

    Jan 1, 2014

  • DFI
    Evaluation Of Existing P-Y Models For Caliche Based On Numerical Analysis Of Raiders Stadium Lateral Load Tests

    By Ramin Motamed, Fahim M. Bhuiyan, Raj V. Siddharthan

    Numerical lateral load analysis based on the beam on Winkler foundation (BNWF) model (i.e., the p-y method) is a simple, and widely used tool to predict lateral responses of drilled shafts from field

    Oct 1, 2022

  • AUSIMM
    Virtual mine geologist – who needs a real one when AI can do the job?

    By S Sullivan

    The key skills for a competent geologist are observation, documentation, analytical thought and the ability to communicate. These attributes have served the geological world for the past two centuries

    Sep 1, 2024