Search Documents

  • CIM
    Structural Geology of Canadian Ore Deposits: The Cordilleran Region

    By H. C. Gunning

    Introduction The invitation to contribute a discussion on some of the broader features of the mineral deposits of our Cordillera seemed acceptable enough when presented several months ago. More mat

    Jan 1, 1950

  • CIM
    Industrial Engineering at the Jeffrey Mine

    By J M. Fletcher

    The responsibility and scope of the Industrial Engineering Department, as organized at the Jeffrey mine, has been broadened to include any study, project or report that could result in more effective

    Jan 1, 1963

  • CIM
    Institutionalizing Advanced Control on Newmont's Carlin Trend

    By A. I. Collins, D. Danninger

    Newmont has installed advanced control and online optimization on the dry grinding circuit and both roasters on its Carlin Trend refractory ore treatment plant. Subsequently, Newmont has developed a m

    Jan 1, 2005

  • AUSIMM
    Building Safe, Productive Cultures and Leadership

    By M I. Roberts

    Corporate and workplace culture, as many owners, directors, executives and managers know, is by far the most powerful determinant of productivity. It’s much more significant than buildings and equipme

    Jun 22, 2016

  • AUSIMM
    Designing and Planning for Maximum Grinding Mill Availability - A Team Approach

    The mineral processing industry is in boom times. The focus on mill availability and therefore profitability has never been greater, as grinding mill maintenance often dictates the entire plant shut d

    Jan 1, 2008

  • TMS
    Sunshine to Petrol: A Metal Oxide-Based Thermochemical Route to Solar Fuels

    By Richard B. Diver, Mark D. Allendorf, Daniel E. Dedrick, James E. Miller, Roy E. Hogan, Andrea Ambrosini, Eric N. Coker, Anthony H. McDaniel, Nathan P. Siegel, Gary L. Kellogg

    "Converting carbon dioxide and water to hydrocarbons is an attractive option for storing solar energy and, coupled with appropriate CO2 capture technology, for recycling carbon and impacting atmospher

    Jan 1, 2010

  • NIOSH
    IC 8357 Review Of Bureau Of Mines Coal Program, 1966 ? Introduction

    This report briefly describes the broad program of research and technologic work conducted by the Bureau of Mines on coal and related subjects during 1966. In addition to n description of investigatio

    Jan 1, 1967

  • IOM3
    Risk management for mining projects

    By T Atkinson, A Cobb, R AJIington

    Risk management is concerned with the whole spectrum of financial, geological, engineering, legal, governmental, social and occasionally ethnic issues, concerned with mining projects. The inherent ris

    Jan 5, 1996

  • NIOSH
    OFR-120-84 Development Of Foreign Economic Indices - Phase I For Philippines

    By Alice M. Chieruzzi

    This Country Documentation Report presents the development of economic indices for the Philippines for the period from 1970 through 1981. The work was done through the Bureau of Mines, Minerals Availa

    Jan 1, 1983

  • NIOSH
    RI 3370 Progress Reports - Metallurgical Division - 22. Ore-Testing Studies, 1936-37 - (Special Methods Of Analysis And Testing And Details Of Tests On Various Ores.) ? Introduction And Summary (25da04e7-4482-48c0-8be7-42b065e59d9b)

    By C. W. Davis

    During the second year of its existence, the Ore-Testing Section has actively prosecuted work in the standardization of testing methods, in conducting routine tests and analyses for other Government a

    Jan 1, 1938

  • NIOSH
    RI 3370 Progress Reports -Metallurgical Division - 22. Ore-Testing Studies, 1936-37 (Special Methods Of Analysis And Testing And Details Of Tests On Various Ores.) ? Introduction And Summary

    By C. W. Davis

    During the second year of its existence the Ore-Testing Section has actively prosecuted work in the standardization of testing methods, in conducting routine tests and analyses for other Government ag

    Jan 1, 1938

  • SME
    Hydraulic Backfilling Techniques For Subsidence Control

    By III Scotland

    Genstar's underground mine at Texas, MD experienced a failure of the mine roof and subsequent damage to an underground backfill caused by surface floodwaters. A hydraulic backfilling program was

    Jan 1, 1992

  • SME
    Performance Factors Of The Bucket Wheel Excavator Systems ? Introduction

    By Jan Wolski

    Increasing interest in the Bucket Wheel Excavator (BWE) technology calls for a universally understandable definition of suitable performance factors which would reflect the unique features of this tec

    Jan 1, 1984

  • NIOSH
    IC 8153 Open-Pit Copper Mining And Concentrating Methods And Costs, Silver Bell Unit, American Smelting And Refining Co., Pima County, Ariz. ? Introduction

    By W. R. Hardwick

    This Information Circular describes copper mining and concentrating methods, practices, and costs at the Silver Bell Unit of American Smelting and Refining Co., Pima County, Ariz. It is one of a serie

    Jan 1, 1963

  • NIOSH
    IC 8153 Open-Pit Copper Mining And Concentrating Methods And Costs, Silver Bell Unit, American Smelting And Refining Co., Pima County, Ariz. ? Introduction (40c54dc8-839a-4107-a93c-72dafe436993)

    By W. R. Hardwick

    This Information Circular describes copper mining and concentrating methods, practices, and costs at the Silver Bell Unit of American Smelting and Refining Co., Pima County, Ariz. It is one of a serie

    Jan 1, 1963

  • IOM3
    The Prevention of Spontaneous Combustion in Warwickshire, South Derbyshire and Leicestershire

    By W. R. Chambers

    A wide variety of mining conditions exists within the South Midlands Area and across this range of conditions more than one half of the mines are highly susceptible to spontaneous combustion. Two thic

    May 23, 1905

  • SME
    Application of Predictive Maintenance Techniques for Large Electric Mining Shovels

    By Michael Lenz

    Predictive maintenance technologies including vibration analysis, tribology, infrared thermography, ultrasonic detection, and electrical measurements have been applied to large electric mining shovels

    Jan 1, 1997

  • CIM
    Falconbridge Mine-No. 9 Internal Shaft and Facilities

    By V I. McCallum

    In 1954, Falconbridge Nickel Mines Limited began the program of deepening the Falconbridge mine workings for 2,000 feet below the bottom, or 4025, level in order to provide twelve new levels for produ

    Jan 1, 1964

  • CIM
    Optimizing Plant Facilities Location

    By R. D. Hossack

    "The selection of a site for plant facilities is a function of several factors and has as its objective the maximization of profits, given fixed markets and sources of raw material locations. In pract

    Jan 1, 1970

  • CIM
    Development of Kumera Steam Dryer and its Application in Non-Ferrous Metal Smelters

    By I. Kylmakorpi

    In non-ferrous metal smelting, when the concentrate entering the furnace contains high levels of moisture, energy requirement for heating and drying increases and large volumes of exhaust are produced

    Jan 1, 2008