Search Documents

  • SAIMM
    Handling Of Fluctuating And Low-Strength SO2 Gases - An Overview (0ee8fac6-cd6f-4501-9e30-c6b596fdf493)

    By Klaus Hasselwander

    Fluctuating SO2 gas streams represent a difficult task for designers of SO2 removal systems (with respect to designing the plant), but in spite of the designers great efforts to solve the problems, th

    Jan 1, 2009

  • DFI
    Applicability of Wet Grab Sampling to Quality Assurance of Deep Mixing Method

    By Masaki Kitazume

    "Abstract The wet type and dry type of deep mixing methods have been developed and widely applied for on-land and marine constructions in Japan. The quality assurance (QA) of the methods has been usua

    Jan 1, 2014

  • NIOSH
    RI 4361 Investigation Of The Rainy Creek Mercury Prospect Bethel District, Kuskokwim Region Southwestern Alaska

    By F. A. Rutledge

    The Rainy Creek deposits lie at the western base of the Kilbuck Mountains, about So miles southeast of Bethel, in southwestern Alaska. The deposits were brought to the attention of the Bureau of Mine

    Jan 1, 1948

  • SME
    The Utilization Of Coarse Pre-Concentration Rejects In The Preparation Of Underground Backfills At Xstrata Nickel?s Ontario Operations

    By T. Weatherwax

    As part of a strategic research initiative at UBC to design and evaluate integrated underground mining and mineral processing systems, work has been done to determine how to utilize the coarse rejects

    Jan 1, 2008

  • SAIMM
    Considering in situ grade variability during mining sequence

    By R. Peroni, J. Kopp

    Mine planning and scheduling is based on using a geological model for the deposit. Blocks are used to discretize the deposit into mineable volumes where grade values are assigned. Traditional estimati

    Jan 1, 2003

  • NIOSH
    OFR-188-82 Haulroad Berm And Guardrail Design Study And Demonstration

    By Gary L. Stecklein

    This final report delineates the findings of the test programs, simulations, and analyses performed to determine the requirements for the effective application of berms and guardrails as truck restrai

    Jan 1, 1981

  • NIOSH
    IC 8186 Research And Technologic Work On Alabama Coals: An Annotated Bibliography (5c530489-7a2f-4fa5-b7b1-0f3c2a38da5d)

    By R. Q. Shotts

    Factors of geological structure and occurrence of coalbeds, plus the resulting mining conditions, have required more care in preparing coals in Alabama than in most other districts almost since mining

    Jan 1, 1963

  • AIME
    Industrial Minerals - Extraction of Lithium from Its Ores

    By Reuben B. Ellestad, Fremont F. Clarke

    Lithium chemical plant extraction methods are discussed with reference to 1) base exchange with alkali sulphates; 2) processing based on roasting with lime; 3) miscellaneous methods; and 4) applicatio

    Jan 1, 1956

  • NIOSH
    Appendix A. - Program Listing Of Head Loss Calculation Using The USBM Method

    By R. V. Ramani, R. Stefanko, G. W. Luxbacher

    CALCULATION OF MINE HEAD LOSSES FROM ALTIMETER SURVEY DATA USBM PENNSYLVANIA STATE UNIVERSITY - MINERAL ENGINEERING DEPARTMENT USBM USBM USBM THIS PROGRAM CALCULATES PRESSURE LOSSES USING THE

    Jan 1, 1977

  • NIOSH
    IC 8557 Offshore Petroleum Studies - Composition Of The Offshore U.S. Petroleum Industry And Estimated Costs Of Producing Petroleum In The Gulf Of Mexico

    By L. K. Weaver

    The objective of this study is twofold, The first is to present the composition of the offshore petroleum industry in terms of lease bonuses and the value of hydrocarbons produced from Federal offshor

    Jan 1, 1972

  • IMPC
    Enhancement of material handling system efficiency in ZISCO plant by HPGR circuit modification

    By Majid Saghaeian, Rasool Hejazi, Parisa Ghobadi

    "Pulp handling in mineral processing circuits is very complicated due to its inherent different specifications compared with other fluids such as water. Because any variation in ore property (e.g. siz

    Jan 1, 2014

  • SME
    Hard Rock Pressure Tunnel Final Lining Design Guide Summary - NAT2022

    By Wern-ping N. Chen

    Pressure tunnel includes water-supply tunnels and tunnels for hydroelectrical power plants. Their design principles are different from those of water/wastewater/conveyance and transportation tunnels.

    Dec 1, 2022

  • AUSIMM
    Review on the Ore Deposit Denudation Degree

    By S Q. Zhao, J H. Wei, Z X Zhao, S N. Liang

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The degree of regional denudation is one of the most important factors for judging the pres

    Mar 18, 2015

  • NIOSH
    OFR-63-76 Feasibility Of Automated Rail-Haulage Systems In Underground Coal Mines

    By Eugene A. Dolecki

    This final report describes the work accomplished under U.S. Bureau of Mines Contract #H0242011 - "Feasibility of Automated Rail Haulage Systems in Underground Coal Mines." The report outlines the

    Jan 1, 1976

  • NIOSH
    RI 5359 Carbonizing Properties Of Raleigh County, W. Va., Coals ? Introduction

    By D. E. Wolfson

    As part of its overall program of coal carbonization, the Bureau of Mines is studying the coking properties of coals that may be used for metallurgical purposes. The objectives of this study were give

    Jan 1, 1957

  • NIOSH
    OFR-78-86 Belt Conveyor Maintenance And Installation Procedures

    By Svend [Bue] Rondum

    The final report contains a summary of the work performed under this contract, In addition to the report itself, other products were derived from this effort. Several hardware items were prototyped fo

    Jan 1, 1982

  • AUSIMM
    Concentration of Silver-Lead Ores

    The following brief paper is intended, to apply to the concentration of the silver-lead ores at Broken Hill, New South Wales, generally, but more particularly to the process as applied to the ores in

    Jan 1, 1904

  • NIOSH
    IC 8186 Research And Technologic Work On Alabama Coals: An Annotated Bibliography

    By R. Q. Shotts

    Factors of geological structure and occurrence of coalbeds, plus the resulting mining conditions, have required more care in preparing coals in Alabama than in most other districts almost since mining

    Jan 1, 1963

  • SME
    Selection, design and construction of retaining structure to support the primary crusher relocation project at Round Mountain Mine

    By O. MacIntosh

    The Round Mountain gold mine, located 90 km (55 miles) north of Tonopah, NV began large-scale production in 1977. During 2008 Round Mountain Gold Corp. (RMGC) relocated the primary crusher facility ap

    Jan 1, 2010

  • AIME
    Part II - Papers - Reduction of Zinc Oxide by Carbon Monoxide in the Presence of Strontium Oxide

    By H. M. Davis, T. S. Jones

    A methodfor accelerating the reduction of a metal oxide by carbon monoxide is to incorporate in the reduction system a nonreducible oxide which has a strong affinity for carbon dioxide and will remove

    Jan 1, 1968