Search Documents

  • DFI
    Automated Pile Load Test Monitoring

    By Joel L. Volterra

    Since 1910, Mueser Rutledge Consulting Engineers (MRCE) has regularly provided professional engineering services including inspection of pile load tests. Historically, such services included on-site

    Jan 1, 2008

  • NIOSH
    OFR-104-78 Demonstrating The Noise Control Of A Coal Preparation Plant - Volume I. Initial Installation And Treatment Evaluation

    By Matthew N. Rubin

    This report summarizes the work performed under USBM Contract No. H0155155, "Demonstrating the Noise Control of a Coal Preparation Plant." A Consolidation Coal Company coal preparation plant (the Geor

    Jan 1, 1977

  • SME-ICGCM
    Coal Strength Variation by Lithotype for High-Volatile a Bituminous Coal in the Central Appalachian Basin

    By John A. Rusnak

    "This paper discusses the variation of coal strength based on the megascopic coal lithotypes for Central Appalachian high-volatile A coal beds. The composition of coal beds is complex and variable, de

    Jan 1, 2017

  • NIOSH
    RI 9155 - Measurement of Incombustible Content of Coal Mine Dust Samples

    By N. Greninger

    The Bureau of Mines conducted a laboratory study of the measurement of the water and rock dust (RD) contents of synthetic mine-type coal dust (CD) mixtures using a commercial unit for measuring water

    Jan 1, 1988

  • DFI
    Field Measurements Of In-Situ Equipment Track Pressure And Working Platform Deformation Using Earth Pressure Cells And Fiber Optics

    By Peter Faust, Peter Hubbard, Kenichi Soga

    The European Federation of Foundation Contractors (EFFC) and The Deep Foundations Institute (DFI) have set up a task group to compile a Guide for Working Platforms. The first edition of this Guide has

    May 1, 2022

  • SME
    Exposure To Chemical Products In Coal Mining

    By L. F. Zeiler

    In the past, health concerns in coal mines have primarily centered on those elements which have been essentially inherent to the mining environment. These would include respirable coal mine dust, resp

    Jan 1, 1995

  • NIOSH
    OFR-23E-87 Coarse Coal Hydrotransport Testing At The Hydraulic Transport Research Facility - 2-Inch By 0 Clean Coal, 12-Inch Pipeline: R206

    By Michael E. Henderson

    The U.S. Bureau of Mines (BOM) constructed the Hydraulic Transport Research Facility (HTRF) to investigate the hydraulic parameters relating to the transport of coarse coal. To achieve these goals in

    Jan 1, 1985

  • SME
    Technical Approach to Lining Design for Internal Pressure and Fault Offsets on the JWPCP Effluent Outfall Tunnel

    By Jan Van Greunen, Mark Vanderzee, David Haug, Geoffrey Hughes, Yiming Sun, Roozbeh Geraili Mikola

    "The Sanitation Districts of Los Angeles County is planning to construct a new, approximately 7-mile-long (11.3 km) effluent outfall tunnel to be excavated by TBM and lined with precast concrete segme

    Jan 1, 2016

  • IIMP
    Proyectos mineros que cumplen con las expectativas de la empresa

    By Dave J. Porter

    Si bien, los proyectos son el camino para que una organización minera cumpla con su estrategia, la gran mayoría de su historial de cumplimientos son un fracaso puesto que el impacto del proyecto no e

    Apr 1, 2012

  • NIOSH
    IC 8227 American Standard Safety Rules For Installing And Using Electrical Equipment In And About Coal Mines (M2.1) (Revision Of American Standard Safety Code For Installing And Using Electrical Equipment In Coal Mines, M2.1, 1952) - Introduction (5314e5b6

    Safety rules for installing and using electrical equipment in and about coal mines covered in this information circular supersede those previously included in Bureau of Mines Bulletin 514, issued in 1

    Jan 1, 1964

  • NIOSH
    OFR-177(3)-83 Electrical-Shock Prevention - Volume III - Fault Protection For Motion-Drive Equipment

    By L. A. Morley

    Volume III of the final report examines the indication versus interruption procedures used on motion-drive power equipment, with emphasis on surface excavators. The report begins with a review of the

    Jan 1, 1982

  • SME
    Robotic Mining and Micro Tunneling Using Hypersonic Projectile Impact Technology: Field Trial Results, Technical Evaluation and Economic Valuation - RETC2021

    By Mark C. Russell, Charles T. Russell, Brooke Colburn, Parker Bailey, Desiree Bernhard, Kaito Durkee, Tristen Cutshall, Rob P. H. Urselmann

    Hypersonic tunnel boring (HTB) uses directed, high velocity projectile impacts to remove rock. HTB is highly independent of rock strength and targets hard, abrasive rock and variable rock environments

    Jun 13, 2021

  • SME
    Optimization of High‑grade Fluorspar Recovery from Rare Earth Element Carbonatite Deposit Using Column Flotation

    By Kristin K. Mueller, Lucie Coudert, Thi Yen Chau Nguyen, Lan Huong Tran, Jean‑François Blais, Guy Mercier

    Fluorite (calcium fluoride—CaF2), also known as fluorspar, is an industrial mineral used in metallurgy, hydrofluoric acid production, and ceramics manufacturing. Based on the results from a previous s

    Sep 9, 2022

  • SME
    Tailing Dam Failures -Why Do They Continue To Occur? (02cb250a-c9bf-461f-a974-a7dd42458ded)

    By D. R. East

    Recent experiences within certain sectors of the international mining industry suggest an underestimation of the environmental risk associated with the design of mine waste management facilities. Thes

    Jan 1, 1999

  • NIOSH
    RI 8849 - Purification of Zirconyl Sulfate by Solvent Extraction

    By D. J. MacDonald

    The Bureau of Mines has conducted bench-scale investigations leading to the design of an integrated process for producing reactor-grade zir-conium oxide (Zr02) from zircon sand, which avoids the air p

    Jan 1, 1984

  • CIM
    Revised BQ System in China and its Correlation to International Rock Mass Classification Systems

    By Yan-Jun Shen

    The rock mass classification system, BQ (basic quality), is the only national system that is suitable to most kinds of rock engineering in China. It uses two main aspects of the rock mass, the intact

    Aug 1, 2013

  • DFI
    Full Scale Load Test Program Confirms the Design of a Rigid Inclusions Solution for the Support of an MSE Wall in Southern New Jersey

    By Susan Rafalko, Mike Walker, John Sankey, Sherif Aziz, Alex Potter-Weight, Mary Nodine, Frederic Masse

    "After several successful projects on the Garden State Parkway and New Jersey Turnpike for support of single-stage MSE (Mechanically Stabilized Earth) walls using rigid inclusions (Controlled Modulus

    Jan 1, 2015

  • SME-ICGCM
    Vertical Load Capacities of Roof Truss Cross Members

    By David F. Gearhart, Khaled M. Mohamed

    "Trusses are primarily used as passive roof supports in coal mines. They are constructed of three main parts: two grouted bolts installed at opposing forty-five degree angles into the roof so that the

    Jan 1, 2015

  • SME
    Feasible Bioprocessing Technologies for Low-Grade Iron Ores

    By H. X. Li, A. Correa, M. M. Zhang, W. Xuan, M. Andrade

    "With increasing demand for steel and depletion of high-grade iron ore deposits, more research efforts are being directed toward extending the life of existing ore reserves and developing technology t

    Jan 1, 2015

  • NIOSH
    IC 8029 Sinking A Large-Diameter, Concrete-Lined Access Shaft: Harold D. Roberts Tunnel, Colorado ? Introduction

    By Bolmerm R. L.

    This information circular describes the application of modern methods and equipment in sinking a vertical, 916-foot-deep by 16-foot-diameter, concrete-lined access shaft for the Harold D. Roberts tunn

    Jan 1, 1961