Search Documents

  • NIOSH
    IC 7119 Mining And Milling Methods And Costs At The Ash Peak Mine Of The Veta Mines, Inc., Duncan, Ariz. - Introduction

    By Herbert L. Lines

    This paper is one of a series on mining and milling methods and costs published by the Bureau of Mines. The Ash Peak mine of the Veta Mines, Inc., Duncan, Ariz., is of particular interest in that t

    Jan 1, 1940

  • SME
    All-In Sustaining Cost Analysis: Pros and Cons

    By A. G. Yapo, T. W. Camm

    "All-in sustaining cost is a metric used by mining companies to reflect the cost of gold mining in a consistent format useful to both investors and mining professionals. Cost reporting focused on the

    Jan 1, 2017

  • SME
    Bucket Wheel Excavator Technology For Mining Lignite In Texas

    By Karl J. Benecke

    Though the first patent on a bucket wheel excavator was granted in 1881 in the U.S. this technology was developed in Germany to the high standards of today. However, this development was only possible

    Jan 1, 1977

  • CIM
    Iron Ore in Canada, 1970-1980

    By B. M. Monaghan

    "The developments of the 1950s and 1960s have seen Canada become an international source of iron ore, trading in all geographical areas and hemispheres. Canada's production will significantly increase

    Jan 1, 1971

  • DFI
    Construction of a Ground Improvement Scheme to Support Large Mechanically Stabilized (MSE) Earth Walls in Kitimat, BC – Using Cutter Soil Mixing

    By James Coull, Brian Wilson, David Siddle

    "In 2012, Golder Construction Inc. was awarded a Design-Build contract for the design and construction of an extensive, deep ground improvement scheme to support up to 20 metres (66 ft) high Mechanica

    Jan 1, 2017

  • NIOSH
    Bulletin 109 Operating Details of Gas Producers

    By R. H. Fernald

    In 1900, as far as available records show, there were only two producer-gas power installations in the United States. In June, 1915, the number probably exceeded 1,000. Of this number, some 84.5 per c

    Jan 1, 1916

  • AUSIMM
    Leading Practice Water Management at Moranbah North Underground Mine

    By D Yates, C C(te, M Rodgerson

    This paper describes how specific technical and regulatory issues related to water management have been dealt with at Anglo AmericanÆs Moranbah North mine. It compiles the collection of practices that

    Nov 26, 2013

  • SME
    Canopy Air Curtain to Reduce Diesel Particulate Matter Exposure for Underground Blasters - SME Annual Meeting 2024

    By Taekhee Lee, Steven Mischler, Shawn Vanderslice

    Diesel-powered equipment is widely used in the underground mining industry and their popularity results from properties including efficiency, versatility, reliability, and durability. In the U.S. appr

    Feb 1, 2024

  • NIOSH
    RI 6746 Sympathetic Detonation Of Ammonium Nitrate And Ammonium Nitrate-Fuel Oil

    By R. W. Van Dolah

    An investigation was made of the distances over which sympathetic detonation of ammonium nitrate (AN) and ammonium nitrate-fuel oil (AN-FO) might be expected. Large-scale gap tests used two types of A

    Jan 1, 1966

  • SME
    Estimating Process Design Gold Extraction, Leach Residence Time and Cyanide Consumption for High Cyanide-Consuming Gold Ore

    By G. Plenge, M. Brittan

    "Plant design parameters for gold extraction, leach residence time and cyanide consumption are generally determined from standard bench-scale bottle roll or agitation leach tests. The application of l

    Jan 1, 2015

  • NIOSH
    IC 7195 Lightweigbt Aggregates for Concrete

    By Forrest T. Moyer

    Need for lightweight building materials was created in the latter part of the nineteenth century by a radical change in building design in which dead load or structural weight was transferred from thi

    Jan 1, 1942

  • ABM
    High Performance Abrasive Cut-off Machines To Improve Operation Of Hot Rolling Mills

    By Norbert Asamer

    At various stages during the hot rolling process, the different rolled products – blooms, billets, bars, respectively sections, but also slabs or plates – need to be cut. While the cross sections of t

    Jul 30, 2018

  • CIM
    Properties of Asbestos Fibers Imported into the United States

    By M. S. Badollet, N. W. Edgerton

    "A study of the physical properties of long grades of asbestos fibers imported into the United States during the past eight years has disclosed information that will contribute materially to effective

    Jan 1, 1960

  • DFI
    Dynamic Load Testing Of Non-Uniform Piles

    By Thai Nguyen Ph. D

    Dynamic Load Test (DLT) on driven piles has been performed routinely all over the world. In several recent projects, even 100% testing has become a norm where every single pile is dynamically load tes

    Oct 1, 2022

  • TMS
    Modular Reactors and Utilization in Small Scale Direct Leaching Zinc Plant Expansions

    By Björn Saxen

    Outotec atmospheric Direct Leaching has so far been implemented for zinc production capacities of around 100,000 t/a. Lately, there has been growing interest for small scale direct leaching plants, pr

  • AUSIMM
    Solving the Problems of Precharging Sublevel Caving Rings at Ridgeway Gold Mine

    By P Trout, B Macaulay

    Ridgeway Gold Mine (RGM) is an underground sublevel caving (SLC) operation that is owned and managed by Newcrest Mining Limited (NML). Production drill and blast practices are critical to the success

    Jan 1, 2005

  • NIOSH
    RI 9365 - Flame-Powered Trigger Device for Activating Explosion Suppression Barrier

    By R. A. Cortese

    The U.S. Bureau of Mines has developed a flame-radiation-powered trigger device to explosively activate suppression barriers to quench gas and coal dust explosions. The major component of the device i

    Jan 1, 2010

  • CIM
    Stemming Zone Fragmentation Analysis of Optimized Blasting with Top-Column Air Decks

    By W. Banda

    "Trial application of air decks on a production shot improved fragmentation (32% reduction in x50). Empirical fragmentation models and digital image processing software were used to estimate fragment

    Jan 1, 2018

  • CIM
    Slag Cleaning of Outokumpu Direct-to-Blister Flash Smelting Slags

    By J. Tuominen

    Outokumpu Direct-to-Blister Flash Smelting is currently in operation in two smelters, a third one is under construction and a fourth one is in the design phase. The two smelters in operation are the G

    Jan 1, 2007

  • AUSIMM
    Brisbane Airport Link Earth Pressure Balance Machine Two Component Tailskin Grouting – A New Australian Record

    By A Reschke

    The Thiess John Holland Group is undertaking the design and construction of Brisbane’s Airport Link Project, the largest single investment in transportation infrastructure in Australian history. Twin

    Mar 8, 2011