Search Documents

  • CIM
    New Challenges Facing Cumerio Med Pirdop Plant

    By T. Beamish, I. Vasilev, T. Nikolov, E. Marinov, D. Kirilov, P. Barrios

    In April 2005, Umicore Copper de-merged from Umicore Group and created a new independent Copper company called Cumerio. As a separate company, Cumerio is a major European copper smelter and refinery a

    Jan 1, 2007

  • CIM
    Hydrogen Mitigation in the McClean Lake Uranium Leaching Circuit

    By W. McCombe, G. Remple, L. Zunti, M. Bernardin, L. Nightingale-Mercer

    "The McClean Lake Mill is located approximately 700 kilometres north of Saskatoon, Saskatchewan, Canada and is operated by AREVA Resources Canada Inc. (AREVA). The mill was designed to process high gr

    Jan 1, 2017

  • CIM
    Risk Identification Expert System for Metro Construction Based on BIM

    By Limao Zhang

    This paper presents a BIM-based Risk Identification Expert System (B-RIES) for metro construction, composed of three main built-in subsystems: BIM extraction, knowledge base management, and risk ident

    Aug 1, 2013

  • CIM
    Coal Production by Contract Strip Mining

    By W. J. Blackstock

    Introduction To The great majority of people, the term 'strip coal' has little or no meaning, or if it has any significance it is thought to refer to a poor grade of coal that had to be a

    Jan 1, 1949

  • AUSIMM
    Building a Geometallurgical Model in Iron Ores using a Mineralogical Approach with Liberation Data

    By F Minz, P Lamberg, A Mwanga, C Lund, C Wanhainen, M Amiri Parian, J Rosenkranz

    A geometallurgical model is currently built in two different ways. The first and the most common way relies on geometallurgical testing, where a large number of samples are analysed for metallurgical

    Sep 29, 2013

  • CIM
    Prospecting by Use of Natural Alternating Magnetic Fields of Audio and Sub-Audio Frequencies

    By S. H. Ward

    An account of a new method of investigating the electrical .properties J the earth's crust is presented. The method, called AFMAG, employs, as a source, natural alternating magnetic fields of aud

    Jan 1, 1958

  • SME
    The Future of Transit Tunneling in Washington, D.C.

    By Brian Zelenko, William H. Hansmire

    "By the time the latest expansion of the Washington Metropolitan Area Transit Authority (WMATA) system, known locally as Metro and which opened in 1976, is completed in 2020, the system will serve 97

    Jan 6, 2018

  • CIM
    Thermodynamic Modeling of the Mg-Cu-Ni Ternary System Using the Modified Quasichemical Model

    By M. Mezbahul-Islam

    Thermodynamic modeling of the Mg-Cu-Ni system is carried out as a part of multi component thermodynamic database for Mg alloys. This system is being modeled for the first time using the modified quasi

    Jan 1, 2011

  • AUSIMM
    The Design, Installation and Commissioning of an Absorption Refrigeration System at Gwalia Gold Mine in Western Australia

    By J deVries, A Broodryk, P Kyselica, K McLean

    Gwalia gold mine is located close to the town of Leonora in the Goldfields region of Western Australia, some 830 km from Perth. The mine is wholly owned by St Barbara Ltd, an Australian Securities Exc

    Aug 31, 2015

  • IMPC
    An Experimental And Computational Methodology For Estimation Of Breakage Rate And Distribution Parameters For Batch Ball Milling Operation

    By V. K. Gupta

    Several approaches to the estimation of the size discrete breakage rate and distribution parameters (kj and bi,j ) of the batch grinding kinetic model are available in the literature. Analysis of a la

    Sep 1, 2012

  • AUSIMM
    Case Study of Iron Ore Value Chain Optimisation

    By J Foo, T Kleinschmidt, B Reynolds, K Kennewell

    The consideration of complex supply chains often highlights multiple system bottlenecks that are localised and dynamic – they shift depending on what variability last influenced the system. Using the

    Jul 13, 2015

  • SME-ICGCM
    Evaluation of Rock Excavation Technologies for Seismically Active Mines

    By S. Paul Singh

    "The long-term viability of seismically active and/or deep mining operations hinges upon the industry's ability to maintain profitability in a climate of increasingly difficult conditions, escalating

    Jan 1, 2010

  • SME
    Advances in Fluidized Bed Reactor Treatment of Selenium in Mining Waters

    By S. Frisch

    Selenium (Se) in effluent waters has become a significant challenge for a number of industries. Toxicity studies and new reports of occurrence have certainly caused increased scrutiny and actions in t

    Feb 23, 2014

  • CIM
    Design of Pressure Hydrometallurgy Pilot Plants for the Nickel Industry

    "Pilot plants for pressure hydrometallurgy represent special design and project execution challenges. Over the past twenty years, Zeton has designed and fabricated a variety of world-class pressure hy

    Jan 1, 2017

  • CIM
    Addressing Wear Problems in Mining and Mineral Processing

    By Shiqiang (Rob) Hui, Jiaren (Jimmy) Jiang, Rees Llewellyn, Yongsong Xie

    Wear has been estimated to cost the Canadian mining/mineral processing industry over $15 billion per year mainly for repair/replacement of worn parts in 2013. The associated production loss is difficu

    Jan 1, 2015

  • TMS
    Simulation of Gold Heap Leaching as an Aid to Process Development

    By Alan P. Prosser

    The heap leaching of gold ores by cyanide solution was simulated by computer program. The program uses only basic m1neralogical and chemical data; no process testwork data, such as column leach result

    Jan 1, 1989

  • SME
    Historic Rock Tunnel Rehabilitation—Designing for the Unknown - NAT2022

    By Ryan Marsters, Adam Pring, Robin Dornfest

    Raw water supply in the central Rocky Mountains often relies on trans-basin conveyance. Many of these older diversions incorporate high-elevation, miles-long tunnels driven over a century ago in hard

    Dec 1, 2022

  • CIM
    Agnico Eagle Laronde Plant: Metallurgical Challenges Present and Future (CIM Journal | Vol. 8, No.1, 2017)

    By J. Cayouette, C. Bolduc, P. Blatter

    "The LaRonde mill was commissioned in 1988 and began treating ore from the Penna shaft in 2000. The mill has been expanded to accommodate 7,500 t/day, but ramped down to 6,000 t/day since the deep ext

    Jan 1, 2017

  • SAIMM
    A new automated, safe, environmentally sustainable, and high extraction softrock underground mining method

    By J. Zhang, A. J. S. Spearing, L. Ma

    Ore deposits are becoming more complex to mine as a result of the exhaustion of surface and other easily mined deposits. There is also increasing socio-political pressure to design more environmentall

    Feb 2, 2021

  • CIM
    Monitoring Canada's Mine Production

    By H. L. Martin

    A joint federal-provincial approach in gathering basic information from industry on mine production, concentrator operations and ore reserves, initiated during 1978, is a major step toward the goal of

    Jan 1, 1979