Search Documents

  • DFI
    Three-Dimensional (3D) Limit Equilibrium Method (LEM) Comparative Study of a Landslide Case Study Supported with Piles

    By Terence Ma, Seok hyeon Chai, Jeff Lam, Thamer Yacoub, Brigid Cami, Sina Javankhoshdel

    The Limit Equilibrium (LE) analysis of pile-supported geotechnical structures normally assumes a constant shear force for the pile instead of considering the non-linear capacity of the pile which is r

    Sep 8, 2021

  • ABM
    Gearlink – A Quantum Leap In Drive Technology For The Next Generation Heavy- Plate Mills

    By Peter Grawenhof

    In steel mills universal joint shafts, slipper spindles and gear spindles are used to overcome the design- and process- related offset between the axis of the motors and the work rolls. At the roll si

    Aug 16, 2017

  • SME
    Development And Performance Of Large Diameter Cutters For Use On High Performance TBM's

    By Gerald L. Dollinger, Joseph A. Roby, David Krauter, Kenneth Deering

    Three high performance TBM's equipped with large diameter (483mm) disc cutters are currently operating in Norway. This paper summarizes the design philosophy, field performance and ongoing techni

    Jan 1, 1991

  • SME
    Marcona's Cross Country Conveyor System (88e5d038-d801-4b69-91a4-efde8a652ddf)

    By Roscoe W. Stensrud

    The Marcona Corporation was established in 1965 to consolidate the ownership and management of the Marcona group operations. This company, with headquarters in San Francisco, has the following princip

    Jan 1, 1968

  • AIME
    An Operator's Viewpoint Of The Standard Cost System

    By Arthur W. Ruff

    One of the major challenges to management in the mining industry today is the establishment and maintenance of positive and dynamic programs for cost control and cost reduction. To meet the challenge,

    Jan 11, 1962

  • SME
    The Place Of The Jigs In Modern Coal Preparation ? An Operator's Viewpoint

    By Michael P. Evans

    Traditionally in coal processing jigs have been used to clean the coarse coal fraction, the +3/8" or +1/4" material. Today with the advent of modern fine coal jigs in the United States, its place was

    Jan 1, 1983

  • DFI
    Design, Modelling And Construction Of A 12-Sided Diaphragm Walled Shaft

    By Stephen Buttling

    The construction of a water treatment plant in Dandenong, Victoria, required detention tanks and a pumping well. The design provided by the Engineer used conventional rectangular cast-in-situ reinforc

    Nov 1, 2022

  • AUSIMM
    Characteristics of seismicity in the vicinity of a major dyke in a longwall coalmine

    By I Canbulat, G Si, Y Duan, X Luo

    The presence of unfavourable geological structures such as faults and dykes often can contribute to coal burst risk. Seismic events associated with rock fractures tend to cluster around these structur

    Nov 29, 2022

  • ABM
    State Of The Art Gas Cleaning And Utilization For Bof Gases: Operational Results And Benefits

    By Thomas Germershausen

    Worldwide BOF-based steel plants are faced with demanding environmental requests and rising energy costs. For cleaning of primary gases from the BOF the scrubbing technology is worldwide adapted. For

    Jul 30, 2018

  • NIOSH
    IC 6281 Some Check In And Out Systems for Coal Mines

    By R. D. Currie

    Many coal companies have a system for checking men into and out of the mine , and generally such systems appear to be perfectly sound and adequate . However , when the real test comes at the time of a

    Jun 1, 1930

  • SME
    Development And Initial Implementation Of EPRI's Coal Quality Impact Model (CQIM) In The Southern Electric System

    By C. N. Logan

    The Southern Company is one of the nation's largest electric utilities and is the parent firm of five operating companies: Alabama Power, Georgia Power, Gulf Power, Mississippi Power and Savannah

    Jan 1, 1990

  • CIM
    Freezing Method for Consolidation of Saturated Rock Mass - Development of Knowledge and Technology in Polish Copper Mines

    By S. Fabich

    Since the very beginning of Polish copper mining, special consideration of sink shaft techniques through highly saturated Cenozoic rocks was required. Shaft freezing has been chosen as a method to con

    Aug 1, 2013

  • CIM
    Three Stage of Crushing an Alternative to Sag Circuits

    By Christian Ottergren

    "Modern crushers offer double the capacity and performance of classic models. In some cases crushers are replacing SAG circuits, the advantages being smaller investment and lower operating costs. Is T

    Jan 1, 2004

  • SME
    Atmospheric monitoring systems for very large mines

    By A. E. Ketler

    Conventional Atmospheric Monitoring System (AMS) installations for monitoring CO, CH4, O2 and air-velocity throughout underground mines are usually relegated to a modest 3-5 mile extent and with data

    Jan 1, 2009

  • IMPC
    A one Dimensional Quasi-Steady State Model for the Desulphurisation Injection Process at Saldanha Steel

    By Emile Scheepers, Chris Aldrich, Jacques J. Eksteen

    The pneumatic injection of CaC2 powder into molten iron has become a very reliable and effective way to carry out desulphurisation. The key variables that influence the kinetics of this process are th

    Jan 1, 2003

  • CIM
    "Numerical Simulation of the Mode-I Fracture Toughness Measurement via Cracked ChevronNotched Semi-circular Bend Rock Specimens"

    By N. W. Xu, M. D. Wei, F. Dai, B. Li

    "Chevron notched samples achieve general acceptance for measuring the Mode-I (opening mode) fracture toughness of rocks. The cracked chevron notched semi-circular bending (CCNSCB) sample, which is dev

    Jan 1, 2015

  • CIM
    In Situ Stress Measurements in a Drilling Hole Penetrated to the Tohoku-Oki Earthquake Fault: Indication of Coseismic Stress Change

    By Weiren Lin

    The Mw 9.0 Tohoku-Oki, Japan earthquake occurred on 11 March 2011 produced a maximum coseismic slip of >50 m near the Japan Trench. To investigate why the plate boundary fault between the subducting P

    Jan 1, 2015

  • SME
    Environmental Aspects Of Shiploading

    By Leonard Sugin

    The requirements of today's and tomorrow's markets led to a new generation of facilities which handles large tonnages annually, loading them into larger vessels, at higher rates, efficiently

    Jan 1, 1977

  • SME
    Tunnelling Under the Fraser River at 6 Bar - Design and Construction of the Port Mann Main Water Supply Tunnel

    By Tim Langmaid, Steve Skelhorn, Stephanie Robillard, Allen Mitchell

    "The Port Mann Main Water Supply Tunnel project provides a critical water main crossing of the Fraser River for the owner, Greater Vancouver Water District (Metro Vancouver). The project consists of t

    Jan 1, 2016

  • AUSIMM
    Continuous Monitoring of Mechanised Breaker Line Supports to Investigate Roof and Pillar Behaviour (11th International Conference on Ground Control in Mining)

    By Medhurst TP, Trueman R, Hutchinson IN

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.] Colliery, Queensland. This system was designed

    Jan 1, 1992