Search Documents

  • AIME
    Study Of Iron Ore Plants Yields Improved Design And Layout

    By A. A. Dor

    Of the numerous methods that have been tested or considered for the beneficiation of low-grade iron ores, this article deals only with proven flowsheets that are adopted in plants in operation or whic

    Jan 6, 1962

  • SME
    Influence of Data Collection and Conditioning Strategies on the Significancy of Performance Indices in Mineral Processing Plants

    By D. Hodouin

    The optimisation of mineral processing plants requires the evaluation of performance indices such as production rate, product quality, valuable mineral recovery and process efficiency. Decision to cha

    Jan 1, 1991

  • NIOSH
    Design Procedure Optimizes Roof Truss Installations In Bedded Roof - Objective

    Provide mine personnel with a convenient means of determining the optimum installation geometry of roof trusses in bedded roof. Background Mine operators frequently ask the following questions

    Jan 1, 1989

  • AIME
    Converter Noise And Off Gas Temperature Measurements, Tools For Better BOF Control. ? 1. Introduction

    By Paul E. Nilles

    For every single BOF heat, the steelmaker must control the refining operation in order to satisfy at turndown the following conditions : - to reach the correct steel analysis (C, S, P, ...) in the

    Jan 1, 1972

  • NIOSH
    Dust Free Work Station For Minerals Processing - Objective

    Provide respiratory protection and a clean work environment for stationary or semimobile workers at minerals processing plants. Approach An Overhead Air Supply Island (OASIS) was developed whi

    Jan 1, 1985

  • AUSIMM
    Sampling and Production Planning Techniques at Bougainville Copper Limited

    By Scott B. R

    Bougainville's copper mine is located on the west slope of the Crown Prince Range on Bougainville. A high grade copper concentrate is produced for sale to overseas customers. Production planni

    Jan 1, 1976

  • AUSIMM
    Mining Over 100 Stopes Per Year? ù The Perilya Broken Hill Approach to Mine Planning

    By C Mroczek, B Mitchell

    Perilya Broken Hill, from its inception, has budgeted for more than 2.0 million tonnes per year from the Southern Operations. This tonnage was planned to come from in excess of 100 stopes per year in

    Jan 1, 2005

  • SME-ICGCM
    Stable Entry Design In A Multi-Seam Environment

    The challenge of planning to minimize interaction effects in multi-seam mining is compounded by the difficulties inherent in extrapolating essential geological and spatial data between sampling points

    Jan 1, 1994

  • AUSIMM
    Integrated Expert Control System for Grinding and Flotation

    By Jarvensivu M, Ylinen R, Jamsa-Jounela S-L

    The paper presents a new integrated system for control of concentration processes. The system is based on cluster-based modelling taking the ore quality into account and a new on-line particle size

    Jan 1, 1993

  • AUSIMM
    The Application of Special Stainless Steels in the Smelting and Refining of Non Ferrous Metals

    By Bukovinsky SB

    The smelting, refining and hydrometallurgical operations practised in the winning of non-ferrous metals are associated with severe aqueous and high temperature corrosion problems.With the increasing c

    Jan 1, 1985

  • SME
    Computer-Aided Mine Fire Sensor Data Interpretation In Real Time

    By L. W. Laage

    Throughout recorded history, underground fires have plagued mining operations. Compared with other hazardous situations in underground mining, a fire can become a global problem by swiftly spreading d

    Jan 1, 1989

  • DFI
    2D And 3D Ansys Modeling For Deep Excavation And Evaluation Of Soil-Structure Interaction

    By Yahia M. Al-Smadi

    Effect of lateral loading against existing sheet pile wall and distribution of gravity loading due to various number of construction loading scenarios were studied. The objective of this effort was t

    Jan 1, 2010

  • SME
    The Finch-McIvor Functional Performance Based Grinding Circuit Modeling System (1c457710-bd59-4870-818a-6a8763f4c366)

    By J. Finch, R. McIvor

    This paper presents the development of a new grinding circuit steady-state modeling system. It is fundamentally based on the “functional performance equation”, which has now been used to improve the p

    Jan 1, 2007

  • NIOSH
    OFR-101-78 Mine Grounding Systems - Evaluation Of In-Mine Grounding System And Codification Of Ground Bed Construction And Measurement Techniques.

    By Wils L. Cooley

    Several aspects of mine safety grounding systems and equipment are studied. Electrolytic corrosion of test ground beds has shown a high incidence of stray current damage, while efforts to build a reli

    Jan 1, 1977

  • SME
    Coal Preparation The Values Of Training

    By V. Russel Burkhart

    One of the most difficult items to justify economically on any budget is a training program. The costs can easily be identified--primarily the cost of the program and the inconvenience and cost of fil

    Jan 1, 1981

  • NIOSH
    OFR-186(1)-83 Development Of A Continuous Shaft Lining System - Volume I

    By Robert Torbin

    The objectives of the Continuous Shaft Lining (CSL) System are to reduce the costs, safety hazards, and time currently required in lining mine shafts with concrete. The CSL will line machine bored sha

    Jan 1, 1983

  • NIOSH
    IC 8740 Mechanized Longwall Mining - A Review Emphasizing Foreign Technology

    By James J. Olson

    This report summarizes the results of a review of foreign coal mining literature conducted under the Bureau's Advancing Coal Mining Technology program. In addition to a discussion on the historic

    Jan 1, 1977

  • NIOSH
    OFR-33-82 Environmental Instrumentation In Mining Air And Water

    By Richard C. Moore

    The U.S. Bureau of Mines contracted a study to review the air and water monitoring requirements of five Federal environmental acts (the Federal Water Pollution Control Act, the Safe Drinking Water Act

    Jan 1, 1981

  • NIOSH
    RI 4771 Synthetic Liquid Fuels - Annual Report Of The Secretary Of The Interior For 1950 Part II. -Oil From Oil Shale

    The United States has not begun commercial operations to tap its largest poten-tial sources of oil supply - oil shale and coal. The reason is that domestic petrol-eum has been plentiful in the past an

    Jan 1, 1951

  • CIM
    Electrochemical Behavior of An X-80 Pipeline Steel During Stress-Corrosion Cracking in Near-Neutral-pH Environment

    By B. Fang

    Electrochemical behavior of an X-80 pipeline steel, including frequency-sweep electrochemical-impedance spectroscopy (EIS), time-sweep EIS at a constant frequency and open-circuit potential (OCP) moni

    Jan 1, 2005