Search Documents

  • AUSIMM
    Productivity Improvement Case Study: Use of True TQM in Developing Australia's Largest Underground Coal Mine

    It is no longer adequate when starting a new mine to simply select the best equipment. Today's competitive international commodity markets demand superior efficiency which requires systematic inv

    Jan 1, 1995

  • TMS
    Improvements To BHP Hartley Platinum's Smelting Furnace

    BHP Hartley Platinum operates an electric smelting furnace to treat Cu-Ni-PGM concentrate at its plant in Selous, Zimbabwe. The furnace, originally built by others, has experienced problems including

    Jan 1, 1999

  • AUSIMM
    Productivity Improvement Case Study: Use of True TQM in Developing Australia's Largest Underground Coal Mine (eeca4b36-17c2-4559-b89b-8ed25f573d4c)

    It is no longer adequate when starting a new mine to simply select the best equipment. Today's competitive international commodity markets demand superior efficiency which requires systematic in

    Jan 1, 1995

  • SME
    Trolly Assisted Haulage Experiences At Iscor's Sishen Iron Ore Mine

    By B. J. Vorster

    The South African Iron and Steel Company Ltd operates a large Iron Ore Mine in the Cape Province of the Republic of South Africa. The Mine is situated on the farm, Sishen, approximately 600 km west of

    Jan 1, 1985

  • ABM
    Detection And Resolution Of Adverse Melt Shop Conditions Through The Use Of The Graftech Architech System

    By Theodore James Kurela

    Analysis of adverse technical issues has traditionally relied on a snapshot of the state of the operation complemented with both the melt shop’s archived data and eyewitness accounts of adverse events

    Aug 17, 2017

  • ABM
    Sistema De Controle Da Produção Siderurgica Baseado Em Transferência Do Conhecimento

    By Leonardo Matsumota

    Este trabalho aborda um estudo de caso sobre a transferência do conhecimento siderúrgico de colaboradores da empresa para o sistema que realiza o controle de produção da Usina de Cubatão. Este process

    Jul 30, 2018

  • DFI
    Oldie But Goldie – Bi-Directionally Tested Foundation Piles With Base Enlargement As A Smart And Economical Alternative To Conventional Piles At Geneva, Switzerland

    By Dipl. -Ing. (FH) Thomas Schmitt, Dr. Melvin England

    Foundations in Geneva are difficult and expensive due a large overlayer of clay and silt above competent bearing material in the moraine. Common foundation schemes use deep barrettes or bored piles, f

    May 1, 2022

  • DFI
    Impact Assessment Of Excavation Induced Settlements: A Study Of Chennai Metro Phase Ii

    By Ganesh Deepak K., Anjana R. K., Dr. Kumar Pitchumani N., Rajasekharam R. M. V. M. S. S.

    The Phase 2 of Chennai Metro is being introduced in the city to ease the dependence on the existing transportation systems. Phase 2 is a combination of underground and elevated metro stretches compris

    Nov 1, 2022

  • SME
    A Case Study: Successfully Managing Excessive and Rapid Slope Deformation in an Open Pit Mine Utilizing Slope Monitoring Radar Systems - SME Annual Meeting 2024

    By Justine Ealy, Daniel Yang, Christina Foster

    Maintaining stable high walls can be a challenging task. Complex geological and structural features, alteration zones, rock mass properties, and hydrogeological conditions must be well understood to d

    Feb 1, 2024

  • SME
    Video Data Analytics For Quantitative Measurement Of Feeder Ore Flow Characteristics In Underground Systems - SME Annual Meeting 2022

    By J. Fastle, M. Weinstock

    The block cave mining method utilized by PT Freeport Indonesia (PTFI) generates fines and allows the inflow of water. Both constituents have contributed to unfavorable characteristics: an increase in

    Mar 2, 2022

  • ISEE
    Managing Production Blasting Vibrations: A Machine Learning Based Prediction of PPV in Chilean Copper Mines

    By J. Rafael Otaíza, Francisco Mardones

    This work has addressed the problem of creating a predictive model of the maximum particle velocities in the rock mass (PPV). The model designed specifically can model the subsequent vibrations of bla

    Jan 21, 2025

  • DFI
    Finned Piles Response Subjected To Lateral Loading In Clayey Soils

    By Viswanadham B. V. S., Babu K. V

    Wind energy is one of the most economical renewable energy sources. In order to support wind turbines onshore or offshore open-ended monopile foundations are widely used. Unlike conventional structure

    Sep 1, 2022

  • DFI
    Re-Use Of Old Pile Foundations In Amsterdam

    By Remco Offenberg, Marcel Bielefeld, Martijn van Delft

    The question of the continued suitability of existing foundations arises when the function of the superstructure changes. This can occur when the superstructure is replaced or when the existing struct

    May 1, 2022

  • DFI
    S21-Berlin – Design And Underwater Construction Of A Covered Contrustion Pit Without Direct Accessibility From Above

    By Grischa Dette, Thomas Schröder, Holger Merski

    For the construction of the tunnel for the new Berlin S21 light rail line, a construction pit had to be built below the crossing B 96 federal road. For this purpose, the construction pit M’ has been b

    May 1, 2022

  • ABM
    Pw Technology In Energy Recovery: Bpsl Cdq Project

    By Antonio Esposito

    Saving energy and reducing resource’s consumption by minimizing emissions are today great challenges in the coking industry worldwide. In order to achieve satisfying results, equipment as well as tech

    Aug 16, 2017

  • SME
    Engineering Risk Analysis Of Sand And Gravel Operations

    By Burton E. Gilpin, Dr. George W. Annadale

    A two level risk analysis procedure which is specially designed for use in river environments, is presented. The first level risk assessment (Level I) is often adequate for purposes of most projects,

    Jan 1, 1992

  • AUSIMM
    Improved mining recovery with bulk ore sorting and MR technology

    By C Beal, S Singh

    Sensor-based bulk ore sorting is a form of preconcentration that autonomously measures and physically separates discrete bulk ‘pods’ of run of mine (‘ROM’) or primary crushed material. This case study

    Nov 10, 2020

  • SME
    Explosion-Proof Enclosure Failure to Contain a Lithium-Ion Battery Thermal Runaway - SME Annual Meeting 2024

    By Thomas H. Dubaniewicz

    (XP) enclosures to enclose electrical ignition sources to prevent propagation of an internal methane-air explosion to a surrounding explosive atmosphere. Researchers at the National Institute for Occu

    Feb 1, 2024

  • AUSIMM
    The challenges of removing sulfur from magnetite ores to meet direct reduction specifications

    By D Connelly

    Magnetite ores can be used to produce very high-grade concentrates that are suitable feed for the direct reduction process route but the high sulfur content of some concentrates can cause substantial

    Sep 18, 2023

  • AUSIMM
    Resource and Reserve category inflation – known rewards, hidden risks

    By M Bond, R R. Hargreaves, G W. Booth

    There are numerous causes of speculative mineral resource and reserve inflation. Traditionally, these are linked to issues of data accuracy or misinterpretation, the use of overly optimistic estimatio

    May 24, 2023