Search Documents

  • SME
    Chemistry Of The Calsinter Process For Recovery Of Aluminum From Fly Ash

    By B. Zane Egan

    The Calsinter process for recovery from fly ash involves sintering the fly ash with calcium sulfate and calcium carbonate at 1200°C, followed by a dilute sulfuric acid leach step. Flue gas desulfuriza

    Jan 1, 1980

  • NIOSH
    IC 7270 Marketing Vermiculite ? Introduction

    By G. Richards Gwinn

    Vermiculites are secondary minerals formed by the: alteration of biotite and philogopite mica and are associated with basic rocks such as dunites, serpentines, and pyroxenites. Vermiculite was firs

    Jan 1, 1944

  • SME
    Estimation of Fines Generation in Blasting Using Dynamic Rock Properties and a Near-Field PPV Damage Model "Mining, Metallurgy & Exploration (2020)"

    By Kwangmin Kim, Junnhyeok Park

    In the hard-rock mining industry, the generation of fines during blasting is an important issue because it has a significant effect on production processes. Although various approaches have been used

    May 16, 2020

  • AUSIMM
    Life-of-Mine Ventilation System Upgrade at Springvale Colliery - A Case Study

    By B Smith, R Gelson

    Springvale Colliery is an underground longwall mine situated approximately 10 km north-west of Lithgow in the western coalfields of New South Wales. Following a full-scale review of the mineÆs ventila

    Jul 1, 2013

  • CIM
    Operations of the Yukon Consolidated Gold Corporation

    By W. H. S. McFarland

    THE Yukon Consolidated Gold Corporation, Limited, a Canadian company, operates alluvial gold dredges in the Klondike goldfields of Yukon Territory. Its operations are of unique interest to Canadian mi

    Jan 1, 1939

  • CIM
    Advanced dielectric ceramics applied in hydrogen generation systems

    By R. A. L. Drew, G. Mendoza-Suarez, J. Filipi, R. Vintila, J. A. Kozinski

    Economics and environmental considerations along with the increasing demand of hydrogen encourage development of novel technologies such as plasma processing of hydrocarbons and thermal cracking of na

    Jan 1, 2004

  • CIM
    Use of Numerical Methods, Scale-Up and Lab Tests in the Design of HPAL Autoclaves

    By J. Jung, W. Keller, A. Zucht

    "The agitator design for nickel high pressure acid leach autoclaves (HPAL) is critical with regard to the process result, i.e., the recovery rate. Further considerations during the design phase are th

    Jan 1, 2012

  • AIME
    Notes On The Laramie Tunnel.

    By David W. Brunton

    (San Francisco Meeting, October, 1911.) MINE-DRAINAGE and the ever-increasing demand for water on the plains have within the past few years necessitated the driving of a great number of adits and tun

    Apr 1, 1912

  • AIME
    The Preparation Of Anthracite.

    By Paul Sterling

    1. INTRODUCTION. THE general impression regarding the preparation of merchantable anthracite is that it is confined to a colossal, grimy structure, called a "coal-breaker." This name is misnomer; f

    Oct 1, 1911

  • AUSIMM
    The Mine Manager's Toolkit

    As the surrounding environment continues to change and evolve, mine managers face a changing climate of expectations. TodayÆs mine managers must juggle competing pressures to deliver sound social, env

    Jan 1, 2006

  • SME
    Boom Towns: Managing Growth

    Satisfactory means of managing growth in boom towns is a concern in mineral, energy and other large industrial developments. This session will include examinations of socioeconomic impacts, major issu

    Jan 1, 1979

  • CIM
    The Preservative Treatment of Mine Timbers

    By J. F. Harkom

    Introduction The importance of the preservative treatment of mine timbers need scarcely be stressed here. Increasing the life of mine timbers will reduce one of the major costs of mining and also c

    Jan 1, 1930

  • AUSIMM
    Lady Loretta - A New Approach to an Old Opportunity

    By C R. Fountain, W R. Cannings

    The zinc-lead-silver mineral resource at Lady Loretta ranks amongst the worldÆs richest when measured in terms of in situ metal grades. However, the project remains undeveloped 28 years after its disc

    Jan 1, 1998

  • SAIMM
    Mine Occupational Safety and Health Leading Practice Adoption System (Mosh) Examined – The Promise and Pitfalls of this Employer-Led Initiative to Improve Health and Safety in South African Mines

    By M. Hermanus, N. Coulson, N. Pillay

    "SynopsisThis paper assesses the effectiveness of the Mine Occupational Health and Safety Leading Practice Adoption System (MOSH) and its potential to improve mine health and safety in South African m

    Jan 1, 2015

  • CIM
    Is a Koepe Hoist Always a Better Solution

    By R. P. Townsend

    It is a widely accepted "fact" that a Koepe friction hoist is generally the best solution for production hoisting when compared to a double drum hoists. This would appear to be true if one looks at th

    Jan 1, 2011

  • SME
    RETC 2003 Breaks Attendance Records

    By William R. Yernberg

    The 2003 Rapid Excavation and Tunneling Conference (RETC) was held at the New Orleans Marriott, New Orleans, LA, June 15-18. The New Orleans conference was the 16th since the RETC was formed in 1971.

    Jan 1, 2003

  • NIOSH
    IC 8956 Health And Safety In-House And Contract Research In Fiscal Year 1984

    This publication summarizes the research (in-house and contract projects) programmed by the Bureau of Mines for fiscal year 1984 (October 1, 1983-September 30, 1984) under its Health and Safety Techno

    Jan 1, 1983

  • SAIMM
    Real-time gypsum quality estimation in an industrial calciner: A neural network-based approach

    By A. F. van der Merwe, R-D. Taylor, M. Jacobs, F. H. Conradie

    Total bound moisture (TBM) is a typical quality indicator of industrial-grade gypsum. This gypsum is comprised of three distinct phases, namely anhydrite, dihydrate, and hemihydrate, of which only the

    Oct 3, 2023

  • IIMP
    Caracterización de la zona SE de alteración hidrotermal. Depósito de Magnetita El Laco, II Región de Antofagasta, Chile

    By Rubén Ossandon, Diego Venegas

    La presente investigación describe la caracterización de una de las zonas de alteración hidrotermal de El Laco, denominada Zona Steam Heated del sector SE (ZSH-SE) con respecto al cima del Volcán El L

    May 1, 2008

  • SME
    SVCW Gravity Pipeline—Ground Movements During Construction - RETC2023

    By Nik Sokol, Eric Sekulski, Leo Weiman-Benitez, Jon Hurt, Shrinidhi Vijayakumar, Phaidra Campbell

    The Silicon Valley Clean Water (SVCW) Gravity Pipeline (GP) is the first Progressive Design Build (PDB) tunnel completed in North America. As part of the Regional Environmental Sewer Conveyance Upgrad

    Jun 13, 2023