Search Documents

  • ISEE
    A Computer Program to Predict the Probability of Overlap or Crowding of Adjacent-Period Millisecond-Delayed Initiators

    By Mark S. Stagg, Stephen A. Rholl

    The firing times of millisecond-delayed initiators are random variables that exhibit varying degrees of scatter. This scatter can cause crowding and overlap of adjacent delay periods, which results in

    Jan 1, 1988

  • AIME
    Some Fundamental Principles Applied to the Design And Operation of a Fine Anthracite Plant At Coaldale Colliery

    By W. T. Turrall, M. J. Cook

    A discussion of modern developments in beneficiation of fine sizes of anthracite, this paper includes a description of the plant flowsheet, an analysis of operating results, and a summary of fundament

    Jan 9, 1953

  • AUSIMM
    The Structural Properties of Coal and their Effect on Coal Excavation by High Pressure Waterjet Impact

    By Summers DA

    Faculty at the University of Missouri-Rolla have carried out research on the application of high pressure water jets as a means of excavat- ing coal for over 15 years. During the course of this tim

    Jan 1, 1986

  • AUSIMM
    The Cementation of Ag(I) Ions from Sodium Chloride Solutions onto Rotating Copper and Zinc Disks

    By Tran T

    The kinetics of cementation of silver chloro-complexes from sodium chloride solutions onto copper and zinc was studied using rotating disc electrode system. The activation energies were found to be

    Jan 1, 1992

  • SME
    Geologic Investigation, Prediction And Construction Evaluation For The Cooling Water Tunnels - Seabrook, N.H., Nuclear Power Station

    By M. Saidman, R. Pizzuti, R. Hirschfeld, A. J. Desai, J. Rand

    Two bedrock tunnels, 170 to 250 feet deep and with a length of about 17,000 feet each, will be used to convey cooling water from the Atlantic Ocean to the Seabrook, N.H., Nuclear Power Plant. Seismic

    Jan 1, 1976

  • RMCMI
    Social Activities And Optional Events Of The 1997 RMCMI 93rd Regular RMCMI Meeting And Convention

    Saturday, June 28 A pre-convention activity kicking off the 93rd RMCMI meeting was a Saturday evening June 28 reception for all Mine Rescue participants, their convention registered spouses, professi

    Jan 1, 1997

  • NIOSH
    IC 7289 Suggested Hoisting-Signal Code For Metal-Mine Shafts

    By D. Harrington

    A uniform hoisting-signal code for mines hoisting from more than one level, if adopted by all mining States, would be beneficial to employees and owners alike and should largely reduce the number of h

    Jan 1, 1944

  • SME
    The Solvent Extraction and Ion Exchange Removal of As, Sb And Bi From Copper Sulphate-Sulphuric Acid Solutions

    By B. R. Satio, P. G. West-Sells, D. B. Dreisinger, B. J. Y. Leong, G. A. Kordosky

    Electrolytic techniques have historically been used to remove arsenic, antimony and bismuth from copper refining electrolytes. However, both solvent extraction and ion exchange techniques have been he

    Jan 1, 1993

  • NIOSH
    Mineral Investigation Of The Jerry Peak, Jerry Peak West, And Boulder Creek Wilderness Study Areas (BLM Nos. ID-46-14, ID-46-14A, And ID-46-13) Custer County, Idaho ? Summary Statement

    By Fredrick L. Johnson

    The Jerry Peak, Jerry Peak West, and Boulder Creep: Wilderness Study Areas contain no identified mineral resources. Two workings, a 20-ft-long adit and a pit, were found in Paleozoic, brecciated, limo

    Jan 1, 1984

  • AIME
    Properties - Calculation of the Tensile Strength of Normalized Steels from Chemical Composition (Metals Technology, October 1942) (with discussion)

    By F.M. Walters

    In order to isolate the effect of an element on some property of an alloy, the effect of the other alloying elements must be elimi-nated, either by reducing their quantity to the extent that they may

    Jan 1, 1943

  • AIME
    Properties - Calculation of the Tensile Strength of Normalized Steels from Chemical Composition (Metals Technology, October 1942) (with discussion)

    By F. M. Walters

    In order to isolate the effect of an element on some property of an alloy, the effect of the other alloying elements must be elimi-nated, either by reducing their quantity to the extent that they may

    Jan 1, 1943

  • ISEE
    Vibration Monitoring and Control of Blasting Associated with the Construction of a Highway Next to a Show Cave

    By Paul Worsey, Gerald Rupert, Mark Kirkbride

    The realignment of Highway H in the proximity of Crystal Cave (Springfield MO.) required the development of a blasting program that was both economical and efficient for construction, yet ecologically

    Jan 1, 1997

  • CIM
    Canadian silica resources: a study of the processing of selected Quebec silica samples for glass and foundry sand

    By P. R. A. Andrews, R. K. Collings

    "In cooperation with le Ministère de l'Énergie et des ressources, Québec, le Centre de Recherches minérales, Sainte-Foy, Québec, and various silica producers, selected deposits of Quebec silica w

    Jan 1, 1987

  • NIOSH
    RI 7769 - Geologic Factors Causing Roof Instability And Methane Emission Problems - The Lower Kittanning Coalbed, Cambria County, Pa

    By C. M. McCulloch, Maurice Deul

    A geologic study of Mines 32 and 33 in Cambria County, Pa., was conducted as part of a methane control research program. Areas of high methane emission and roof instability are encountered which are r

    Jan 1, 1973

  • AUSIMM
    Transfer of Zinc from LGM Concentrate to Zinc Concentrate at the Hilton Concentrator of Mount Isa Mines Limited

    By Burford B. D, Johnson N. W, Rohner P

    Under design philosophy, the Hilton concentrator produced lead, zinc and LGM (lead plus zinc) concentrates. The LGM (Iow grade middling) concentrate was produced by combining coarse middling streams f

    Jan 1, 1994

  • CIM
    Mine and Tailings Effluent Treatment at the Kimberley, B.C. Operations of Cominco Ltd. (641e0bef-605a-4287-82ae-93ec545560c0)

    By W. J. Kuit

    "Complex facilities which provide for the collection, management and treatment of effluents emanating from the Sullivan mine and concentrator tailings were made operational in October, 1979. Key featu

    Jan 1, 1980

  • SME
    The Geological Setting, Morphology And Physical Properties Of Massive Sulfide Deposits: Important Parameters For Future Mining Technology

    By Georgy Cherkashov

    The geological setting, morphology and physical properties of massive sulfide deposits must be taken into account when designing the underwater systems being currently constructed for mining of this t

    Jan 1, 2008

  • TMS
    Remediation Of Acid Mine Drainage At The Friendship Hill National Historic Site With A Pulsed Limestone Bed Process

    By Philip L. Sibrell

    A new process utilizing pulsed fluidized limestone beds was tested for the remediation of acid mine drainage at the Friendship Hill National Historic Site, in southwestern Pennsylvania. A 230 liter-pe

    Jan 1, 2003

  • ISEE
    The Use of High Density Ammonium Nitrate Mini-Prill Blasting Agents to Reduce Drilling and Blasting Costs

    By John C. Adams, Robin Irwin

    In early 1993 a test program was designed to determine if mining costs could be reduced by using a high density ammonium nitrate mini-prill blasting agent. The goal was to reduce mining costs by expan

    Jan 1, 1994

  • SME
    Feasibility of Design of Selective Polymers for the Separation of Dolomite from Apatite by Selective Flocculation

    By Mulong Yu, Yosry A. Attia

    Beneficiation of high magnesium Florida phosphates requires ultrafine grinding to liberate the dolomite (the main source of magnesium), and a separation process capable of dealing with ultrafine sizes

    Jan 1, 1993